Loading...
HomeMy WebLinkAboutCost EstimateSTOP "N" STORE MINI STORAGE FACILITY EXPANSION ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COSTS FOR FIRE HYDRANT ASSEMBLY AND ASSOCIATED APPURTENANCES MBESI No. 10330002 Item No. l.00 2.00 3.00 4.00 Description 8" x 6" D.l. Anchor Tee 6" Anchor Coupling Fire Hydrant Assembly Connection to Existing Water Line. August 22, 2006 Estimated Quantity l EA 2 EA EA LS Estimated Unit Cost $350.00 $150.00 $2,500.00 $750.00 Total Constrcution Cost: Estimated Total Cost $350.00 $300.00 $2,500.00 $750.00 $3,900.00 The above construction estimate is based on the engineer's opinion of probable construction costs. This estimate constitutes our best judgment at this time. Please note that the engineer does not have any control over contractor or supplier workloads and the degree to which inflation may affect project costs between now and the bid date. During construction, additional features may become apparent as the work progresses, which will result in an increase or decrease in cost. . ale Browne, Jr., P.E. McClure & Browne Engineeri Pagel of 1