HomeMy WebLinkAboutApplicationFOR OFFICE USE ONLY
Case No. Ql; '0 D
Date Submitted
CITY O F COLLEGE STATION
Planning & Development Services
DEVELOPMENT PERMIT
MINIMUM SUBMITTAL REQUIREMENTS
$200 development permit fee.
$600.00 Public Infrastructure Inspection Fee if applicable. (This fee is payable if construction of a
public waterline, sewerline, sidewalk, street or drainage facilities is involved.)
Drainage and erosion control plan, with supporting Drainage Report two (2) copies each
Notice of Intent (N .0 .1.) if disturbed area is greater than 5 acres
Date of *Required Preapplication Conference:_O_c_to_be_r_19_ . ._2_0_0_3 ____________ _
*(Required for areas of special flood hazard)
LEGAL DESCRIPTION Harvey Hillsides, Lot 2.1, Block 4
APPLICANT'S INFORMATION (Primary Contact for the Project):
Name ____ ___;J:;..;.·~D:;..;..~P~·~H..;..;o:;..;.l=d=in~g~,~ln..;..;c=.-----E-Mail __ _;;m~a..;,..;rb:;..:.r....::.o=th..;..;e:;..;.r..;:;.s .... @;.<.;a:;.;..o:;;..;l..;..;.c"""o;...;..m'-'-__
Street Address Post Office Box 9715 -----------------'-~""'--"""'-'-'-~-=---"-'-'-''-'--'-"----------
City ___ C_o_l_le~g~e_S_t_at_io_n ____ State TX Zip Code 77842
Phone Number ---~(9_7_9~) _69_6_-_55_6_2 ___ _ Fax Number (979) 696-3063
PROPERTY OWNER'S INFORMATION:
Name _____ ~<S~a~m~e~a~s~a~b~o_ve~)~-----E-Mail --------------
Street Address --------------------------------
City ____________ State _______ _ Zip Code ________ _
Phone Number Fax Number -------------------------~
ARCHITECT OR ENGINEER'S INFORMATION:
Name McClure & Browne Engineering/Surveying, Inc. E-Mail --=-D..;:.;.a~le~B ...... @ ...... M~cC~lu~re~B_r~o_w_n_e~.c_o_m __
Street Address 1008 Woodcreek Drive Suite 103 ---------------~~~~---'--~---------
City ___ C_o_l_le~g~e_S_t_at_io_n ____ State TX Zip Code 77845
Phone Number ---~(9_7_9~) _69_3_-_38_3_8 ___ _ Fax Number (979) 693-2554
6/1 3/03 1 of 2
Application is hereby made for the following development specific site/waterway alterations:
Ca.rJer Cree.k Dn~:,"aje, '&.sin
ACKNOWLEDGMENTS:
I, __ , design engineer/owner, hereby acknowledge or affirm that:
The information and conclusions contained in the above plans and supporting documents comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and its associated Drainage
Policy and Design Standards.
Property Owner(s)
As a condition of approval of this permit application, I agree to construct the improvements proposed in this
application according to these documents and the requirements of Chapter 13 of the College Station City
Code
Contractor
CERTIFICATIONS:
A. I, __ , certify that any nonresidential structure on or proposed to be on this site as part of this
application is designated to prevent damage to the structure or its contents as a result of flooding from
the 100-year storm.
Engineer Date
B. I, __ , certify that the finished floor elevation of the lowest floor, including any basement, of any
residential structure, proposed as part of this application is at or above the base flood elevation
established in the latest Federal Insurance Administration Flood Hazard Study and maps, as amended.
Engineer Date
z J DALE. bf< .. "NNE, JR. e ~··~········~········ 't 1:· 81 890 .. ~
D.
f ,,0i~11·s-1sTEI"~~. ~4j
I, __ , do certify that the propos~\\~&iatj!P not raise the level of the 100 year flood
elevation established in the latest Fed~~ance Administration Flood Hazard Study.
E.
Engineer Date
above
Conditions or comments as part of approval: ------------------------
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from
construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. All development shall be in accordance
with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and
ordinances of the City of College Station shall apply.
6/13/03 2 of 2