HomeMy WebLinkAboutTCEQ LetterJune 22, 2009
David Loflin
Texas Commission of Environmental Quality
Water Supply Division
MC 153
P.O. Box 13087
Austin, TX 78711
P.O. Box 9253, College Station, TX 77842
Off/Fax: (979) 690-0329
email: civil@rmengineer.com
RE: Sleep Inn & Suites -1195 Earl Rudder Freeway South, College Station, TX
Lot 2B, Block One -High Ridge Subdivision -Brazos County
TCEQ Exception Letter for Utility Improvements
RME No. 231-0351
Mr. David Loflin:
The above referenced project will install the following improvements within the distribution
system of the City of College Station:
•!• Approximately 40 linear feet of 8" PVC (C-909, Class 200) water line;
•!• Applicable valves & fittings.
Design and construction of these improvements will be in accordance with the latest
Bryan/College Station Unified Water & Sewer Design Guideline Manual, Standard Details, and
Specifications and Chapter 290 of the TCEQ Rules & Regulations. This quantity of water line is
less than 10% of the total length of water line within the City's current distribution system.
Therefore, an exception for plan review is being requested for this project and its water system
improvements.
Please call should you have any questions or require assistance.
Sincerely,
Rabon A. Metcalf, P .E.
Texas Firm Registration No. F-004695
rabon@rmengineer.com
xc: Josh Norton, P.E.
Development Services
City of College Station
1101 Texas Avenue South
College Station, TX 77840
CDl-231-0351-L 14 Page 1of1
-• < PUBLIC WATER SYSTEM PLAN REVIEW SUBMITIAL FORM
(Complete and Attach to Submittal Package)
Date: June 22, 2009
TCEQ PWS Identification No.*: ..... o .... 21 ...... o ...... o ..... 0 __ 2 ______ CCN No. or Application No. **:..:..10:...1!..:6~9'--------
Water System Name: City of College Station
Water System Owner: City of College Station Type of Entity: Municipality
Address: 1195 Earl Rudder Freeway South -College Station Phone: (979) 764-3660
Responsible Official:_J ... o ...... h ..... n .......... W ... o ..... o ..... d...,.y,__ _____________ Title: Director of Public Utilities
County (system location): Brazos County Subdivision Sec., Phase, Unit, etc. Sleep Inn & Suites, Phase One
__________________ Mechanism & Source of Financing:-=...P..:.;ri:..:v-=a~te=---------
Engineer: Rabon A. Metcalf, P.E. Registration Number:-=.88:.;5:.:8::..:3~--------------
Firm Name: Rabon Metcalf Engineering Phone: (979) 690-0329
Firm Address: P.O. Box 9253, College Station. TX 77842 Fax: (979) 690-0329
* If no PWS Number exists, the owner must submit a business plan, if required, in accordance with §290.39(f) and (g).
-If a required CCN number does not exist, an acceptable application to obtain a CCN number must be made before a project submittal can be
technically reviewed. In addition, if a submittal is for a project located outside the CCN area, a CCN amendment application must be submitted before a
project may be reviewed for construction approval. Please refer to 30 TAC Chapter 291 for additional information regarding CCNs.
If this is a new (proposed) system, you must attach the following with this submittal: NOT APPLICABLE
D Attach a list of all water utilities within % mile of the proposed service area boundaries
D Copies of formal applications for service from each of the following
D any municipality if the system is within its ET J;
D any district or other political subdivision whose corporate boundaries are with in % mile of the proposed
service area boundaries
D any other water service provider whose certificated service area boundary is within % mile of the proposed
service area boundaries
D Documentation that all application requirements including payment of fees were complied with.
D Copies of written responses from each of the entities listed above.
D Business plan , if required by 30 TAC 290.39(f) & (g). The business plan financial requirements for non-community
water systems must confirm capital availability to construct the system according to TCEQ requirements. This
would consist of a balance sheet that shows liabilities as well as assets, not just a bank confirmation of a deposit
account. Alternatively, if the project is being constructed with loan funds, then a loan commitment letter from the
lender specific to that project will suffice.
D Justification for constructing a separate system (unless none of the entities listed above exist)
D Plans and specifications with an engineering report all sealed by design engineer.
Type of Project (please check the appropriate boxes):
v' Distribution System Modifications
D Well completion data on previously approved well
D Pressure Maintenance Facilities Modifications
D Disinfection Facilities or Other Modifications
D Preliminary Engineering Report w/o plans
D Modification of Surface Water Treatment Plant
D
D
D
D
D
D
D
Storage Capacity Modifications
Water Well Construction, Proposed
Proposed Innovative Process Study
Ground Water Treatment Plant, New
Surface Water Treatment Plant, New
Tex. Water Dev. Board Proj . No. _____ _
Other(PleaseExplain) _______________________________ _
IF THIS SUBMITTAL IS A REVISION OF PREVIOUSLY SUBMITTED PLANS, PLEASE ENTER THE ASSIGNED TCEQ
LOG NUMBER: . Please call (512) 239-6960 if you have questions regarding this form. Your
cooperation will help us provide better service. Additional helpful information and rules are available at our website:
http://\Nww. tceq. state. tx. us/permittinglwaterpermludlplanrev. html
I hereby certify that the above information is, to the best of my knowledge, true and correct.
Rabon A. Metcalf, P .E.
Printed Engineer's Name
June 22. 2009
Date