Loading...
HomeMy WebLinkAboutCost EstimateNO. 1 2 3 4 5 6 7 8 9 Engineer's Cost Estimate SLEEP INN & SUITES WATER IMPROVEMENTS COLLEGE STATION, BRAZOS COUNTY, TEXAS UNIT DESCRIPTION QUANTITY UNIT COST WATER IMPROVEMENTS Mobilization, Staking, All Required Testing by 1 LS $1 ,500.00 Contractor & Trench Safety (Water Line) 8" PVC Water Line (C909, CL 200) -Non Structural 40 LF $17.00 Backfill Standard Fire Hydrant Assembly 2 EA $3,000.00 18" x 8" (MJ) Tapping Valve & Sleeve 2 EA $1 ,800.00 8" (MJ) Gate Valve & Box 2 EA $900.00 6" (MJ) Gate Valve & Box 3 EA $750.00 8" x 6" (MJ) Tee 2 EA $400.00 8" (MJ) Plug 1 EA $300.00 Water Services & Taps 1 LS $1 ,200.00 ESTIMATED CONSTRUCTION COST= 10% CONTINGENCY= TOTAL COST $1 ,500.00 $680.00 $6,000.00 $3,600.00 $1 ,800.00 $2,250.00 $800.00 $300.00 $1 ,200.00 $18,130.00 $1,813.00 GRAND TOTAL= $19,943.00 public infrastructure cost projections. CD1-231 -0351-E02 RME Consulting Engineers Texas Registration Firm No. F-004695 P.O. Box 9253 College Station, TX 77842 Off/Fax: (979) 690-0329 Email : civil@rmengineer.com June 22, 2009 Josh Norton, P.E. Assistant City Engineer City of College Station Planning & Development Services 1101 Texas A venue South College, Station, 77840 P.O. Box 9253, College Station, TX 77842 Off/Fax: (979) 690-0329 email: civil@rmengineer.com RE: Sleep Inn & Suites -1195 Earl Rudder Freeway South, College Station, TX Lot 2B, Block One -High Ridge Subdivision -Brazos County Utility Availability Analysis -Revision No. 1 RME No. 231-0351 Josh: The purpose of this letter is to acknowledge that the construction plans for the public infrastructure improvements, for the above referenced project, to the best of my knowledge, do not deviate from the latest B/CS Design Guideline Manual. I also acknowledge, to the best of my knowledge that the details provided in the construction plans are in accordance with the B/CS Standard Details. Please do not hesitate to call if you have any questions. Sincerely, CDl-231-0351-Ll 0 Page I of 1