Loading...
HomeMy WebLinkAboutWater System Fire Hydrant Flow Test ReportHARLE ENGINEERING COMPANY FIRM#4538 WATER SYSTEM FIRE HYDRANT FLOW TEST REPORT Date: 2-9-10 Water System Owner: _W~e=llb=o=r..:.:n....::S=U=D'-------------------- Development Project: The Barracks Subdivision -Phase 2 -College Station. Texas Flow Test location: FH 3 in Phase 2 near the intersection of Sergeant and Lt. Avenue Nozzle size (in.): 2.5 Pitot Reading (psi): 52 Flowrate (gpm): 1,210 Pressure Gauge location: FH 1 on General Parkway Static Pressure (psi): 75 Residual Pressure (psi): 56 Discharge Coeff: (c) = 0.90 Flowrate Formula: Q=29.84cd2p112 c = discharge coeff. d =orifice size (in) P = pitot pressure (psi) Computed Discharge at 20 psi Residual Pressure: QR=_ 2.148 gpm Note: The flow test and report were prepared in accordance with NFPA 291. Report Prepared by: Joseoh P. Schultz Others Present: Stephen Cast -Wellborn SUD Wallace Phillips ____ _ Z-IZ~/t!