HomeMy WebLinkAboutDetention Pond As-Built SummaryGENERAL Emergency Outfall: Spillway Length: Side slopes: Spillway Elev.: Top of Berm Elev.: Cross slope: Manning 's n: HEC-HMS Analysis Summary Detention Pond As-Built Summary The Barracks Subdivision -Phase 2 March,2009 This addendum is issued to address the as-built condition of the completed detention pond at the Barracks Subdivision. The detention pond was constructed larger than the ori ginal des ign in order to provide additional fill for the streets and building lots in Phase 1. However, the pond side slopes were steeper than the original design and the surface material was hard clay which made it difficult to establish vegetation. As part of Phase 2, fill material was placed in the pond to reduce the steepness of the side slopes and improve soil characteristics so that vegetation can be established . The final grading of the pond is shown on Sheet 6 of the construction drawings. A private sidewalk was constructed on top of the pond berm around the entire pond . Also, 4 concrete flumes were constructed at locations with concentrated runoff from the adjacent development to help control erosion of the side slop es. The pond was surveyed upon completion and the volume of the pond calculated . The as-built pond vo lum e is very similar to the original design. The emergency spillway fo r the pond was modified from its original design to allow for flatter side slopes tb accommodate the private sidewalk. The dimensions of the spi I I way are as foll ows. 92.4 ft . 40H:1V 31 2.55 ft 31 3.4 ft 0.50% 0.025 (short gra ss) and 0.012 (concrete sidewalk) The final pond volume and the spillway parameters were input into the HEC-HMS computer model and a summary of the results is as follows: Condition _ 2 Y'_~L2_s*--: 100 ci_ '""s:;,~~OC: ! ___ --·--+--c_fs [ cfs ! cfs cfs cfs i cfs ! Pre-Dev. 55.3" . 114.1 J 144.-8 I 180.5 / i l0.2 l • Post-Dev. 54.I 110.6 137.5 ; 166.5 ! 184.9 ! .._ ____ _ i Pond WSF.:L 309.9 'l l0.7 3111 I 311.7 312.3 31 2.9 Emergency Spillway Elev.= 312. 55 ft Top of Berm Elevation = 313.4 Ji Available Freebocrd = 0. 5 ft. As shown abo ve, the post development project discharge is less than the pre-development discharge for all storm events. Page I of 2 CONCLUSION The detention pond in The Barracks Subdivision as constructed will function as originally designed. E GINEERING ATTESTATION: Joseph P. Schultz Licensed Professional En gineer State o f Texas No. 65889 Page 2 0 12 HARLE ENGINEERING COMPANY flRM#4538 WATER SYSTEM FIRE HYDRANT FLOW TEST REPORT Date: 2-9-10 Water System Owner: _W~e_ll_bo_r_n_S_U_D ___________________ _ Development Project: The Barracks Subdivision -Phase 2 -College Station, Texas Flow Test location: FH 3 in Phase 2 near the intersection of Sergeant and Lt. Avenue Nozzle size (in.): 2.5 Pitot Reading (psi): 52 Flowrate (gpm): 1,210 Pressure Gauge Location: FH 1 on General Parkway Static Pressure (psi): 75 Residual Pressure (psi): 56 Discharge Coeff: (c) = 0.90 Flowrate Formula: Q=29.84cd2p112 c = discharge coeff. d = orifice size (in) P = pitot pressure (psi) Computed Discharge at 20 psi Residual Pressure: QR=_ 2.148 gpm Note: The flow test and report were prepared in accordance with NFPA 291. Report Prepared by: Joseph P. Schultz Others Present: Stephen Cast -Wellborn SUD Wallace Phillips ____ _ _ ... ~"\.~"!>.'<!,\ ---<\-;. OF r \\ ,t:':,,,_ i>-\ •••••••• ~-f-'• ;' 0 •• ••• *····.;'u• '• 1'* ... •• * , .. ~:*• ,, !I :i••,.•••••••o••••••••••••"'•••-.• •• -J;.,.~ ~~~Q~.~f.~.l:..?.9.~.Y.~g .... J ~i" ... '.9 6588~g/.C1::J. ;.-(\ o,/:'0 .• 0' '•'tJ T~~ ~ <• c ~ I . "i . -••.. -.. -:;.. .~ ..... · ...... Z-JZ-/b