HomeMy WebLinkAboutStaff Comments1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM January 23, 2012 TO: Travis Martinek, via email: travis(oclarkewyndham. com FROM: Jason Schubert, AICP Principal Planner SUBJECT: FALCON POINT CONDOS (CUP) I reviewed the above -mentioned CONDITIONAL USE PERMIT - USE & SITE application and determined it to be incomplete. The following is the preliminary list of items needed to complete the submittal so that staff may conduct a thorough review. Please submit the following information by 10 a.m. on any Monday for review that week: It appears that one portion of the property is owned by Organized Capital Inc & Real Alchemy 1 LP and the other is owned by Clarke & Wyndham Inc & Real Alchemy I LP & JPJ Investments. Provide a revised page 2 of the application to include each property owner or provide a separate page a listing of all of the current owners of the tracts. Provide proof of authority that Paul Clarke is authorized to sign this application on behalf of each of the corporations that own the subject tracts or obtain the additional signatures with proof of authority that those individuals may sign on behalf of the respective corporation. Please be aware that if this application is not completed before Monday, March 12, 2012, it will expire and a new application and fees will be necessary to continue the conditional use permit process. If you have any questions or need additional information, please call me at 979.764.3570. cc: Paul Clarke, via email: pclarke(oclarkewyndham.com v McClure & Browne Engineering, via email: kevinm(cDmcclurebrowne.com Case file No. 12-00500013 (*&F� CITY OF STATION Home ofTe asA&M Univeaity" 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM February 27, 2012 TO: Travis Martinek, via email: travisna.clarkewyndham.comv/ FROM: Jason Schubert, AICP Principal Planner SUBJECT: FALCON POINT CONDOS (CUP) ub Thank you for the submittal of the requested documents for your CONDITIONAL USE PERMIT - USE & SITE application. This project will be distributed to staff this week for their review. cc: Paul Clarke, via email: pclarke(a)clarkewvndham.com V McClure & Browne Engineering, via email: kevinmCa.mcclurebrowne.com✓ Case file no. 12-00500013 alleCITYAVIS on 3/-7 -{o set)�" Comll M-Mk5 Wi VJ-c C,. 4r w Mott jcvj , Vk WAS JK wi.l-h aMbct CITY OF COLLHGF, STATION H.,.fTi .A&M Uni,,nV' r 1101 Texas Avenue, P.O. Box 9960 ' College Station,.Texas 77842 Phone 979.764.3570 / Fax 979.764,3496 MEMORANDUM March 12, 2012 TO: Travis Martinek, via email: travis(a)clarkewyndham.com FROM: Lauren A. Hovde, Staff Planner SUBJECT: FALCON POINT CONDOS — Conditional Use Permit Site Plan Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff _ review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by any Monday at 10:00 a.m., your project will be placed on the next available Planning & Zoning Commission (P&Z) meeting: One (1) copy of a Conceptual Site Plan. If all comments have not been addressed on your revised site plan, your project will not be scheduled on a P&Z agenda. Please note that this application will expire in 90 calendar days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. hftp://www.cstx.gov/pz If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff Review Comments cc: Paul Clarke, via email: pclarkeaa.clarkewvndham.com McClure & Browne Engineering, via email: kevinm(a)mcclurebrowne.com Case file #12-00500013 •(lelol ZZWE6$) iiun jad gyg' l,$ le }lwjad 6uippnq a }o aouenssi ay; of joud anp aq Ilim uogeolpaa pueXed '£ (aoual a pue ,01•) ;sea ay} of 6uiuoz L-d ay; }suie6e pue ( jagnq pauolsuawlp f •sylplm aslle anup A -(laa; aienbs 09L si azls puelsi wnwiuiw) suollelnopm pue o6elool aienbs puelsl Bumped 'yr -(6upued 6ulpnloui) sNoeglas pauolsuawlp lie .6 _q}dap leayl Aemanup .i -Aemanup ay} joi Ilpej wnlaj gjno .a (glplm Aem-10-146u 4ilm) iaajiS yinow;Jea -p •auel Gig _0 •sialaw Ailllin -q -sluelpAq an} .e :Iagel aseald Z uoilewjojui Allllln .f •eaje asead pue eaje ails leiol I -sluawasea Ile jo; jagwnu 96ed pue awnloA q •suolsuawip jalawuad yllm loeil loafgns aigua ayi -6 'luawanadwi mau Aue wojl ,OZ oull asead ; -4lsuep ails pasodoid .a `i46i94 6uiplinq P •abelool ajenbs 6uiplmq .0 -dew AaA •q .maje gjjou e :ppe aseald • I• •uogejedajd ueld ailS ul In;dlay aq f(ew inq 'malAeJ dfi0 jo; possaippe eq of paiinbai iou We sluawwoo aseal •pJeog malAaa u6isaa ay; Aq pamalAW eq Illm gaiym o6e3loed ueld aiiS posodoid ay; Jo; aye sivawwoo 6ulmo1101 ayi •pejoldwoo sem nnainaj Ajeuiwllaid a `paniwgns ivawnoop ayi uo paseg �oolq alig ayi of legwnu euoyd pue 'ssaippe 'aweu ,sieumo Apedad pue speoildde ayi ppe aseald •saipadoid 6upnge PUB loafgns ayi 101 papinad aq of speau uogewjo;w buigeld pue 'digsjaumo '6uluoz ayi O 'p1e08 malnaa u61saa ayi iq mainaj ueld ails of joud uoissiwwo0 6wuoZ pue 6wuueld ayi Aq panadde aq ;snw }nq 'malnaJ jo; palilwgns uaaq seq uogeoildde field leUi3 V -pannbei si peji pefgns ayi 10 6uliield 'lenadde ueld ails of joud pjeog malnaZl u6isaa ayi Aq panoadde PUB pamainai aq isnw jouave pue 'ueld adeospuel `veld ails ayi 'pagwgns aq of peau Ilim uolleol)dde pieog memab ubisaa aleiedes a 'uolsslwwo0 6u1u0z pue 6uluueld ayi w01; Ienadde leld Ieuld pue liwJad asg Ieuoliipu00 ayl;o Ienadde Ilouno0 A110 6wmollo=l liouno0 Kilo Aq uodn paloe pue pamainGU aq Ilim ueld ld9ouo0 siyl 'louls10 luewdolanaa pauueld Gad a 6uilsenbei uegm pannbaj ueld 1daouo0 a elgwasej pinogs ivawnoop si41 seaje 6uhljed pue u011e001 6ulplinq ayi 6ulmoys ueld ailS lenldaouo0 e liwgns aseald JNINNVId (E6000900-Z0—(dno) SOaNOO INIOd NOOIV3 aoafoid 6 'ON SIN3WWOO M31A3a 33VIS ENGINEERING COMMENTS NO. 1 1. If the subject tract is proposed to be subdivided, each platted lot will need to have access to public water and sanitary sewer mains, as well as meet fire flow requirements per the BCS United Design Guidelines. 2. Once the proposed project has completed the zoning (CUP) and platting process, a full site plan and development permit application must be submitted including all required engineering construction documents and reports. 3. FYI — As this tract does not have direct access to Wolf Pen Creek, additional drainage analysis will be required in order to evaluate the conveyance of storm water to the main channel of Wolf Pen Creek, specifically the culvert beneath Holleman Drive. 4. Please label 10-foot electrical easement (v894, p656) along Dartmouth. Reviewed by: Josh Norton Date: March 8, 2012 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. All easements on site are existing. Electric facilities will be designed within existing easements. 2. Developer provides temporary blanket easement for construction purposes or provides descriptive easements for electric infrastructure as designed by CSU for electric lines (where applicable, including street lights) 3. Developer may be responsible for locating .easements on site to insure that electrical infrastructure is installed within easement boundaries. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer provides 30' of rigid or IMC conduit for riser poles. CSU installs riser: 4. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. 5. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. 6. Developer pours electric device pads or footings (i.e. transformers, pull boxes etc) per CSU specs and design. 7. Developer installs pull boxes and secondary pedestals per CSU specs and design (pull boxes and secondary pedestals provided by CSU). 8. Developer provides digital AutoCAD 2000 or later version of plat and / or site plan. Email to: ehorton@cstx.gov. 9. Developer provides load data to CSU as soon as it is available to avoid construction delays. Delivery time for transformers not in stock is approximately 40 weeks. 10. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformer(s), pull box(es), switchgear(s), meter location and conduit routing as designed by CSU. 11. To discuss any of the above electrical comments please contact Eric Ho13on at 979.764.6280. Reviewed by: Eric Horton. Date: 2/29/12 SANITATION 1. The dumpster enclosures are designed for to hold 8-300 gallon containers. Sanitation is okay with this project. Reviewed by: Wally Urrutia Date: March 8, 2012 ZLOZ `8 gojew :ale(] Jauueld }}e;g 'apnoH -y uajnel :Aq pamaina�j -u6is9p ul Ruo;ouow pione o};uawaiinbai ay; sapnloul siyl •aoueuipJO ;uawdolana(1 pal;lug ay; ;o g-g•yg,g uol}oes y;im eoueildwoo ul eq ;snw 6ulpllnq ayl -malnaU 8-80 Jo; ueld a;ig ay} Auedw000e pue pameinaa aq;snw asa41 •sepe6e; Joua)xa ay; Jo; apew suoi}oales ay} jo; saldwes leua;ew pue joloo;iwgns aseald - LZ •malnaJ 82ia Jo; ueld al!S ay} Auedw000e o} paglwgns eq }snw eoueuipio juawdolanaa paglun ay} ;0 9•L pue ovv,g"g uol;oag gloq gjIm }ueildwoo si ley; ueld adeospuel `d -OZ 176£Z 'ON aoueulpJO 41lO jad se uol;elle;sul uodn passe; pue polle;sul aq }snw saoinap mold N0e8 II`d -6L -aoinaa mold Noeq Noa4O-aignoa a jo 'aoinaa mold Noeq aldiouud ainssaad peonpa-1 a 'joNeeig wnnoen ainssaid a Aq pa}oa;ad aq }snw wa}sAs uoge6pil '8L ,10e-1; }oafgns ay} uo uleldpool; pa;eln6aj VA3d ;o eouesge jo aouesaud ay; buipie6ai uogewio;ul apinwd aseald LL •eouewpio luewdolanaa paglua ay;;o 0 L-L u01409g pue 1314sia NaaiO uad;IoM ay; o; ogioads spiepue}s y;im Aldwoo Illm 6w;y6p joua;xe }eql a;ou a ppe aseald 'gL ,jo;ej;slulwpy ay; Aq panadde sangewa}le jaglo jo 'Nouq 'auo}s elgwesaj o} pa;eau; jo pauaaios aq }snw 146194 leol}Jan ui „g JOAO a}aaouoo leoi}Jan }ey; 6ul}e}s a;ou a ppe aseald 'gL a•aouejeadde pagiun a ule}ulew o; aleos pue anpa}lyae 6ulpllnq ay; y}im paleuip-l000 aq peys 6ulua0J3s Yong -apeJ6 anoge }aa; any;ulod a ww; palnseew ';ol }oafgns eqj jo ,09L uigpm pu}sip leguapisaj jo Clem-jo-jg6u ollgnd Cue woj; alglsln aq o; sou se os pa;elosl Jo maln was paueajos aq pegs }uawdlnbe leoluegoew pa}unow-puna6 pue;oa lle '}ou}sip MaajO uad Mom ay; o} of;loads }uawaimbai 6uluaaaos o; uoi}ippe uh. '6uge}s a}ou leJ9u96 a apinad '4L ;old 6ulpllnq auo pajaplsuoo aq lllm buigeld sannbai;eql pei; 96jel leudio ayl "'IA=l '£L •u6isep pa;soMns ay; si sloe, f1 pa}Panul uy •popuawwooai aje suoi;epoww000e aNiq '}ou;sia M991O uad;loM eqj jo am}eu ay; o; anp 'JanamoH -spefwd Rpwe;-glnw jo; pajinbausou si buiNjed aloAoi8 -ZL -juaw;eau; ainsoloua ja;sdwnp pasodad eqj jo Ilesap a ppe aseald 'L L 'spJelloq ;o apls}no ',ZLx.ZL do aouejealo joua;ui wnwiulw a aney }snw aunsoloua ja}sdwnp goe3 -OL .Aem;o-jg6u ay; o;w sloofoad;egl Nlemapis ay; ol. saoeds 6wpued ay} 6uole suns }eql Nlemaps aq; was uoi}oauuoa Nlemapis a apinad aseald 'Oaa ay; o} 6uipJo00e sou;sla NaaJO uad ;loM ay; ul paPaUip se '0L4ej; ueu;saped a}epoww000e of -6 weld a3lS 1e10440 ay; was panowa eq pinogs L-y }aayS uo sliesap pue sa}ou pa;elaj 6ulpllnq a41 '8 veld adeospue-1 pue 'suogenala 'ueld 93lS ay} o} jagwnu auoyd pue 'ssajppe 'aweu ,sieumo Apadad pue sjueoildde ay} ppe aseald I woapaq jad saoeds g L si oi;ej ay; 'eaje ul 199; ajenbs 0£ L uegj ssal aje }eql s}lun woorpaq Z ou ale ejegj aouiS •saoeds 6uiNjed g£L saimbai a;ls posodad siyl 'g -Aliedad ay};o uoi}Jod way}nos ay; o; aisle anup a }oafad o} se os paubsep aq pinoys a;is eqj ';aai;g glnowpea was;wod sseooe auo amaoaj Illm;oei; }oafgns ja6jel eqj •g '9lgi69l;ou si uoi;eoildde ay; uo s;uaw;sanul fdf jo; ain;eu6is ayl -s}uaw;sanul fdf jo; Auedwoo ay;;o ;leyaq uo ubis o} lenpinipui ue jo; R}uoy}ne pue uoi}ejodjooul;o sajoipV ay};iwgns aseald O CITY OF COILL^'GL STATION Howe of Texas A&M University` 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM May 22, 2012 TO: Travis Martinek, via email: travis(a)clarkewyndham.com FROM: Lauren A. Hovde, Staff Planner SUBJECT: FALCON POINT CONDOS — Conditional Use Permit Site Plan Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by any Monday at 10:00 a.m., your project will be placed on the next available Planning & Zoning Commission (P&Z) meeting: One (1) 24"x36" copy of a Conceptual Site Plan Thirteen (13) 11"x17" copies of a Conceptual Site Plan If all comments have not been addressed on your revised site plan, your project will not be scheduled on a P&Z agenda. Please note that this application will expire in 90 calendar days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.gov/p If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff Review Comments cc: Paul Clarke, via email: pclarkeaclarkewyndham.com McClure & Browne Engineering, via email: kevinmamcclurebrowne.com Case file #12-00500013 STAFF REVIEW COMMENTS NO. 1 Project: FALCON POINT CONDOS (CUP) — (12-00500013) PLANNING Repeat- Please submit a Conceptual Site Plan showing the building location and parking areas. This document should resemble a Concept Plan required when requesting a PDD Planned Development District. This Concept Plan will be reviewed and acted upon by City Council. / will call shortly to clarify the items that need to be removed. 2. Repeat -Please submit the Articles of Incorporation and authority for an individual to sign on behalf of the company for JPJ Investments. The signature for JPJ Investments on the application is not legible. This is needed for the CUP application. ENGINEERING COMMENTS NO. 2 1. Please label 10-ft electrical easement (V.894, P.656) along Dartmouth. 2. Please label the 30-ft PUE (V.911, P.637) and the 20-ft PUE (V.454, P.364) along the eastern side of the property. 3. Please show and label Dartmouth including right-of-way and pavement widths. 4. FYI — If the subject tract is proposed to be subdivided, each platted lot will need to have access to public water and sanitary sewer mains, as well as meet fire flow requirements per the BCS United Design Guidelines. 5. FYI — Once the proposed project has completed the zoning (CUP) and platting process, a full site plan and development permit application must be submitted including all required engineering construction documents and reports. 6. FYI — As this tract does not have direct access to Wolf Pen Creek, additional drainage analysis will be required in order to evaluate the conveyance of storm water to the main channel of Wolf Pen Creek, specifically the culvert beneath Holleman Drive. Reviewed by: Erika Bridges Date: 5/21/12 FALCON POINT — CONDITIONAL USE PERMIT RESPONSE TO STAFF REVIEW COMMENTS NO. 2 aA_ldldlll(6 1. See revised Conceptual Site Plan. 2. See attached signature for David Jarvie. Also, refer to attached Power of Attorney and signature authority documents. JPJ Investments is not a corporation; therefore, the entity will not have an Articles of Incorporation document. JPJ Investments is a basic joint venture between David Jarvie, Greg Jarvie, James Jarvie (deceased... Greg Jarvie, executor), and Chris Pesek. ENGINEERING / G ( See revised Conceptual Site Plan. Y. $6)L , 2� (/56 (not Q• L4 i � ` `I 2. See revised Conceptual Site Plan. 3. See revised Conceptual Site Plan. 4. This item will be dealt with through the Final Plat application process. 5. This item will be dealt with during the full site plan/construction plan review. 6. This item will be dealt with during the full site plan/construction plan review. 5/30/2012 Page 1 of 1