Loading...
HomeMy WebLinkAboutStaff CommentsAF4" ffi CITY OF COIJ.ri(il'. STATION Hovre of Texas A&M University` 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM December 28, 2011 TO: Levi Douglass, N Douglass estments Ltd., via email: levi((Ddouglassnissan.com +/ FROM: Jason Schubert, AICP Principal Planner SUBJECT: DOUGLASS USED CARS (SP) 1�1 — )t CD Thank you for the submittal of your SITE PLAN - COMMERCIAL application. This project will be distributed to staff next week for their review. cc: Fred Paine, Kling Engineering & Surveying, via email: fred(a,klingeng.com V/ Case file no. 11-00500210 (W`F� CITYOP COI J LGE STATION HomrejT.AdMUnly W January 9, 2012 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM TO: Levi Douglass, N Douglass Investments Ltd; via email:levi@douglassnissan.com V FROM: Morgan Hester, Staff Planner SUBJECT: Douglass Used Cars (SP)- Site Plan d_ " Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by any Monday at 10:00 a.m. for further staff review: City of College Station Transmittal Letter; Memo providing written responses to all of staff's comments (identify the specific page that each comment was addressed on or the reason for not addressing the comment); Seven (7) complete sets of site civil construction documents for the proposed development with the revised site and landscaping plans attached (one set will be returned to you, please submit additional copies if you want more than one approved set); Two (2) revised site plans; One (1) landscaping plan; One (1) 11x17 grading and erosion control plan; Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please contact Morgan Hester at 979.764.3570. Attachments: Staff review comments PC: Fred Paine, Kling Engineering & Surveying; via email: fred@klingeng.comV' Case file #11-00500210 STAFF REVIEW COMMENTS NO. 1 Project: Douglass Used Cars (SP)—11-00500210 PLANNING 1. Please show that there is a curb bordering the property to the south to separate the parking lot from Ninfa's drive aisle. FYI — If necessary, please coordinate with Ninfa's for use of their driveway for construction purposes. 2. Per Section 7.2.D.E, 180 square feet of landscaped interior islands must be provided for every fifteen interior parking spaces. Please include this in the northern paved area display. 3. Please relocate the proposed sign outside of the PUE along the street frontage. 4. Please label the fire lane. 5. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not be made of aware of will constitute a completely new review. Reviewed by: Morgan Hester, Staff Planner Date: January 6, 2012 MISCELLANEOUS 1. Irrigation system must be protected by a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double -Check Back Flow Device, and installed as per City Ordinance 2394, 2. All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. ENGINEERING COMMENTS NO. 1 1. Please remove site light poles and signage from the PUE's. 2. Verify the location of the 100-yr floodplain and floodway. Based on the recent LOMR and MapMod, it appears that portions of the property should be encumbered by floodplain. 3. According to the as -built drawings, the fire hydrant being relocated is attached to an 8- inch waterline rather than a 6-inch. Please revise. 4. Please remove the proposed water service line along the northern lot line from the PUE. 5. Please provide a plan and profile drawing for the relocated fire hydrant. 6. The referenced existing 24-inch storm sewer and inlet do not appear to be shown. 7. Please clarify why spill curb rather than standard curbing is being proposed along the western side of the parking lot. 8. A TxDOT permit will be required for the proposed driveway removal and additional curb. 9. Please submit a Traffic Control Plan. 10. Please provide details for the proposed flumes. 11. Please add the applicable TxDOT curb detail to the plans. 12. Please provide a drainage letter with a detention exemption request per Section II of the BCS Stormwater Design Guidelines. 13. FYI... Sheet C3.1 indicates grades of almost 16% across parking spaces as well as large changes in grade along the western side of the property. Although this is not fire lane nor public street, we would still recommend not exceeding 6% slopes or sharp changes in slopes without gradual transitions (i.e. vertical curves). Reviewed by: Erika Bridges Date: January 6, 2012 GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer will intercept existing conduit(s) 3-4" PVC at designated transformers or other existing devices and extend as required. 4. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. 5. Developer is responsible for furnishing and installing meter pedestal at location shown on plans. 6. CSU will furnish and install service wire to pedestal location. 7. Developer provides digital AutoCAD 2000 or later version of plat and / or site plan. Email to: sweido@cstx.gov. 8. Developer provides load data to CSU as soon as it is available to avoid construction delays. 9. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformer(s), pull box(es), switchgear(s), meter location and conduit routing as designed by CSU. 10. To discuss any of the above electrical comments please contact Sam Weido at 979.764.6314. Reviewed by: Sam Weido SANITATION Date: January 4, 2012 1. Site plan does not show dumpster pad. I assume they will utilize existing dumpster at current vehicle location. Reviewed by: Wally Urrutia Date: January 6, 2012