Loading...
HomeMy WebLinkAboutStaff CommentsCITY OF CO1. LGH, STATION - Home afTexas AeSM Uuiverrlry" 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MMT1161[L1WL111& January 17, 2012 TO: Heath Phillips, via email: heath superiorstructuresayahoo.com FROM: Jason Schubert, AICP Principal Planner SUBJECT: THE BARRACKS II (REZ) Thank you for the submittal of the requested information for your REZONING application. This project will be distributed to staff this week for their review. cc: Case file no. 12-00500006 Al"I"141 i CITY OF COLLEGE EGE STATION Home of Texas A&M University" 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979,764.3496 MEMORANDUM January 27, 2012 TO: Heath Phillips, via email: heath superiorstructures(a)yahoo.com FROM: Matt Robinson, AICP, Senior Planner' SUBJECT: THE BARRACKS II (REZ) — Rezoning Staff reviewed the above -mentioned rezoning as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address all comments and submit the following information by Friday, February 3rd, 10:00 a.m., for your project to be placed on the next available Planning & Zoning Commission (P&Z) meeting scheduled for February 16th, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue: One (1) 24"x36" copy of the revised Concept Plan; Thirteen (13) 11"x17" copies of the revised Concept Plan; One (1) copy of the digital file of the revised rezoning Metes & Bounds on diskette or e-mail to P&DS—Digital—Submittal@cstx.gov. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If all required items are not received, your project will be not be scheduled on the P&Z agenda. Your project may be placed on a future agenda once all comments have been addressed and the appropriate re -advertising fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.gov/pZ If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff Review Comments PC: Kent Laza, Phillips Engineering via email: klaza(a phillipsengineeringbcs.com t/ Case file #12-00500006 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 1 of 2 STAFF REVIEW COMMENTS NO, 1 Project: THE BARRACKS II (REZ) — (12-00500006) PLANNING 1. Please show/shade the areaS that will already be platted (Phase 100). 2. Please label each Commercial Tract uniquely, there are 2 — Commercial Tracts 2 & 3. 3. Notes, 1d, 5a and 5f — staff is comfortable with having an accessory food/beverage and retail service that is linked to the wake board facility being open. Staff would not be supportive of having a stand alone retail sales/service and restaurant as these uses have already been set aside for commercial areas 1-4. 4. Remove the 2nd and 3`d bullet for note 5f. Reviewed by: Matt Robinson Date: 1/26/12 TRANSPORTATION 1. A TIA was submitted as part of the initial PDD request. Densities and land uses were agreed upon as part of the initial PDD. A new TIA or an amended TIA will not be needed if a letter describing how the changes to the land uses and densities will conform to the overall trip generation thresholds that were agreed upon for the initial PDD request that was approved by Council. Reviewed by: Joe Guerra Date: 1/25/12 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. Project location is outside the CSU certification area. CSU will not provide electric service to this project location. GENERAL ELECTRICAL COMMENTS 1. To discuss any of the above electrical comments please contact Gilbert Martinez at 979.764.6255. Reviewed by: Gilbert Martinez Date: 01.23.2012 GREENWAYS 1. No comments Reviewed by: Venessa Garza, Greenways Program Manager Date: January 17, 2012 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 2