CITY OF COLLFGP. STATION
Hone of Terns AeM University"
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842 ,
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM \ GG
January 13, 2012
TO: Cedar Creek Group; James Follis, via em
folliscolecontructionOwindstream. net
FROM: Jason Schubert, AICP
Principal Planner
SUBJECT: CEDAR CREEK PLAZA (FP)
Thank you for the submittal of your FINAL PLAT - COMMERCIAL application. This project will
be distributed to staff next week for their review.
cc: Cedar Creek Group, via email: mcole o)suddenlinkmail.com
Schultz Engineering; via email: joeschultz84(@verizon.neV
Case file no. 12-00500008
(*tlw'"
CITY OF COLA A .Gl d STATION
Hone ofTeyayA MUuiumity'
January 23, 2012
Planning & Development Services
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570/Fax 979.764.3496
MEMORANDUM
TO: James Follis, Cedar Creek Group, LLC, via email:
folliscoleconstruction(a)windstream.net
FROM: Jason Schubert, AICP, Principal Planner
SUBJECT: CEDAR CREEK PLAZA (FP) - Final Plat
Staff reviewed the above -mentioned final plat as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address all comments and
submit the following information by any Monday by 10:00 a.m. for further staff review and to be
scheduled for a future Planning and Zoning Commission (P&Z) meeting:
One (1) 24"x36" copy of the revised final plat;
Thirteen (13) 1 Vx17" copies of the revised final plat;
Easement Dedication Sheet for Off -Site Easement (must be executed and
returned to the City prior to scheduling this plat for a P&Z Meeting);
Other documents as described in the Engineering Comments;
One (1) copy of the digital file of the final plat on diskette or e-mail to
P&DS—Digital_Submittal@cstx.gov.
Upon receipt of the required documents for the P&Z meeting, your project will be considered
formally filed with the City of College Station. Please note that this application will expire in 90
days from the date of this memo, if the applicant has not provided written response comments
and revised documents to the Administrator that seek to address the staff review comments
contained herein. Your project will not be scheduled for a P&Z meeting until all comments have
been addressed, the appropriate documents submitted, and the necessary easements
executed. Once your item has been scheduled for the P&Z meeting, the agenda and staff report
can be accessed at the following web site on Monday the week of the P&Z meeting.
http://www.cstx.gov/home/index.asp?paqe=2481
Please note that a Mylar original of the revised final plat will be required after P&Z approval and
prior to the filing of the plat. If you have any questions or need additional information, please call
me at 979.764.3570.
Attachments: Staff review comments
cc: Cedar Creek Group, via email: mcolepsuddenlinkmail.com
Schultz Engineering; via email ioeschultz84@verizon.net
Case file #12-00500008
1 of 3
STAFF REVIEW COMMENTS NO. 1
Project: CEDAR CREEK PLAZA (FP) - 12-00500008
PLANNING
1. In the Vicinity Map, rename the portion of Jones -Butler Road north of Rock Prairie as
Holleman Drive South.
2. Revise the Certificate of Ownership and Dedication such that the notary portion reflects the
owner of this plat.
3. Revise the Approval of Planning and Zoning Commission certificate by removing the Attest
by the Secretary.
4. Label/depict the access easement more distinctly as an exhibit or other inset so it more
clearly is shown that it is not the final plat area.
5. Remove the description of the Public Way from the body of the plat and easement exhibit.
Add a note that states the Public Way shall be constructed at the time of site development
and meet the Public Way standards defined in the College Station Unified Development
Ordinance.
6. Remove the PDD zoning label on the plat and easement exhibit. If desired, you may add a
note that states the current zoning is PDD under Ordinance 2011-3360, as amended.
7. An off -site easement is required for consideration and approval of this final plat.
• An Easement Dedication Sheet and all necessary attachments must be executed and
returned to the City prior to the Final Plat being scheduled for a P&Z meeting.
8. Please note that any changes made to the plans that have not been requested by the City of
College Station must be explained in your next transmittal letter.
Reviewed by: Jason Schubert Date: January 23, 2012
ENGINEERING COMMENTS NO. 1
1. Final Plat — Based on Sh.1, it doesn't appear that all of the proposed sidewalk will fit within
the 15-ft PAE.
2. Please submit plans and details for the required public sidewalk along N. Graham Rd.
3. FYI... Additional Development Permit Fee in the amount of 1% of the total public
infrastructure cost will be required.
4. FYI ... Offsite easements will need to be dedicated and public infrastructure built (or surety
provided) prior to the Final Plat being scheduled for a P&Z meeting.
5. Sh.1 — Hay bales or something comparable should be provided in open ditch areas.
6. Sh.2 — Please add an additional valve on the eastern side of Rock Prairie Rd. after the bore.
7. Sh.3 — (Sta.2+67) Should this be an 8x6 tee for the fire hydrant lead?
8. Sh.3 — It looks like the fire hydrant at Sta.5+56 conflicts with the sidewalk location. Please
adjust as needed.
9. Sh.2-3 — Verify that all waterline infrastructure is at least 5.5-ft from the edge of the PUE.
10. Sh.2-4 — Please show and label all proposed PUEs.
11. ShA — The manhole on the Cedar Creek property needs to be in a 20-ft PUE. Please verify.
12. Water Report — The analysis of Fire Hydrant #2 shows that the maximum velocity of 12fps is
being exceeded. Please revise.
13. Water Report — Please analyze how fire flow conditions effect the 4-inch waterline along N.
Graham Rd.
14. Water Report — Please provide analysis for the system under normal conditions and
peak+fire flow conditions.
2 of 3
15. Cost Estimate — Please revise cost estimate to include the required public sidewalk.
Reviewed by: Erika Bridges
Date: January 23, 2012
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION
1. Project is located outside the CSU certification area. CSU will not provide electric service to
this project location.
GENERAL ELECTRICAL COMMENTS
1. To discuss any of the above electrical comments please contact Gilbert Martinez at
979.764.6255.
Reviewed by: Gilbert Martinez Date: January 23, 2012
GREENWAYS
1. No comments.
Reviewed by: Venessa Garza, Greenways Program Manager Date: January 17, 2012
SANITATION
1. Sanitation is ok with this project.
Reviewed by: Wally Urrutia Date: January 19, 2012
TxDOT Comments
1, No Comment (off state system, no anticipated impact)
Reviewed by: Chad Bohne Date: January 19, 2012
3of3
Crry or Cou,ix(A; STATION
Horne of Texas Ae1M University'
1101 Texas Avenue, P.O. Box 9960
'
College Station, Texas 77842
Phone 979.764.3570 1 Fax 979.764,3496
or /
MEMORANDUM
V�
February 6, 2012
TO: James Follis, Cedar Creek Group, LLC,�• via email:
folliscoleconstructionR)windstream.net V
FROM: Jason Schubert, AICP, Principal Planner
SUBJECT: CEDAR CREEK PLAZA (FP) - Final Plat
Staff reviewed the above -mentioned final plat as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address all comments and
submit the following information by any Monday by 10:00 a.m. for further staff review and to be
scheduled for a future Planning and Zoning Commission (P&Z) meeting:.
One (1) 24"x36" copy of the revised final plat;
Thirteen (13) 11"x1T' copies of the revised final plat;
$824.16 for balance of 1% Development Permit fee (based on current cost
estimates);
Four (4) complete sets of civil construction documents for the proposed plat (one
set will be returned to you, please submit additional copies if you want more than
one approved set);
One (1) 11x17 grading and erosion control plan;
Statement that infrastructure will be constructed before proceeding to P&Z or
provide financial surety in the amount of the cost estimate; and
One (1) copy of the digital file of the final plat on diskette or e-mail to
P&DS—Digital_Submittal@cstx.gov.
Upon receipt of the required documents for the Planning & Zoning meeting, your project will be
considered formally filed with the City of College Station. If all comments have not been
addressed your project will not be scheduled for a Planning & Zoning Commission meeting.
Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be
accessed at the following web site on Monday the week of the P&Z meeting:
http://www.cstx.gov/pZ
Please note that this application will expire in 90 days from the date of this memo, if the
applicant has not provided written response comments and revised documents to the
Administrator that seek to address the staff review comments contained herein. Please note that
a Mylar original of the revised final plat will be required after P&Z approval and prior to the filing
of the plat. If you have any questions or need additional information, please call me at
979.764.3570.
Attachments: Staff review comments
cc: Cedar Creek Group, via email: mcole(o)suddenlinkmail.com v
Schultz Engineering; via email: joeschultz84(a)verizon.net�
Case file #12-00500008
Home of Texas A&M University
STAFF REVIEW COMMENTS NO. 2
Project: CEDAR CREEK PLAZA (FP) - 12-00500008
PLANNING
1. Revise the labels of the proposed off -site easements to state Vol. _, Pg. _ instead of
'by separate instrument. These blanks will need to be filled in before the final plat can be
recorded.
2. Provide a statement whether this project will construct public infrastructure and have it
accepted or provide financial surety based on the cost estimates for the public infrastructure
in accordance with LIDO Section 8.6 Construction, Guarantee of Performance, and
Acceptance of Public Infrastructure. Either option must be completed before being
scheduled for P&Z consideration.
3. Please note that the off -site easements documents must be processed by our Legal
Department, signed by the owners, and returned to the City in recordable form before this
item will be scheduled for P&Z consideration.
4. Please note that you may be required to submit paid tax certificates if they are not current
prior to the filing of your plat.
Reviewed by: Jason Schubert Date: February 6, 2012
ENGINEERING COMMENTS NO. 2
1. FYI... Additional Development Permit Fee in the amount of 1% of the total public
infrastructure cost will be required. The balance based on the revised cost estimate is
$824.16.
2. Plat — Please label the 52-ft Public Access Easement off of N. Graham Rd.
3. Sh.5 — Please label each ADA ramp with type and standard detail.
Reviewed by: Erika Bridges Date: February 3, 2012
Home of Texas A&M University