Loading...
HomeMy WebLinkAboutLetter of AcknowledgementCorisai/rFrag �o.�pw•c April 12, 2012 Erika Bridges, E.I.T. Graduate Civil Engineer City of College Station 1101 Texas Avenue South College Station, TX 77842 RE: Creek Meadows — Section 3, Phase One Acknowledgement of City Standards RME No. 260-0438 Erika Bridges: 7607 Eastmark Drive, Ste. 252 <77840> P.O. Box 9253, College Station, TX 77842 Off/Pax: (979) 764-0704 email: civil@rmengineer.com The purpose of this letter is to acknowledge that the construction plans for the public infrastructure improvements, for the above referenced project, to the best of my knowledge, do not deviate from the latest B/CS Design Guideline Manual. With the exception of the following items: 6• All segments of sanitary sewer line installed for this phase of construction, do not meet the minimum flow velocity of 2.0 ft/s at peak flow conditions. The design of these lines comply with minimum size, type and slope (per TCEQ requirements), however, the low number of dwelling units discharging to these lines prevent peak flows from reaching a flow velocity of 2.0 ft/s; d• Proposed storm sewer located in areas that will be subjected to vehicular loadings (including fire truck loading) are designed with Reinforced Concrete Pipe (Class 4). This design standard will withstand the stated loadings even when the cover over the pipe is less than two -feet (2'); ❖ Proposed storm sewer does not increase in pipe size as the runoff travels downstream. The exception to this drainage system is at the very upstream limit as it crosses under Creek Meadow Boulevard North. When this portion of the street was construction, Spring of 2007, it was uncertain what pipe size would be required therefore a 36" pipe was installed. The Drainage Study for this section/phase revealed that only a 30" pipe would be necessary. Therefore there is one segment of pipe that does not increase in size as it proceeds downstream. Also at this connection there is not a 0.1' drop through the junction box. Existing conditions prohibited this from being accomplished. I also acknowledge, to the best of my knowledge that the details provided in the construction plans are in accordance with the B/CS Standard Details. C131-260-0438-1,04 Page 1 of 2 7607 Eastmark Drive, Ste. 252 <77840> P.O. Box 9253, College Station, TX 77842 Off/Fax: (979) 764-0704 CnrtuilFrag ��p,.e.c email: civil@rmengineer.com Please do not hesitate to call if you have any questions. Sincerely, .� ZE OF TEkq, Na; E��= ,� �2 ►2 Rabon A. Metcalf, P.E. No. 88583 Texas Firm Registration No. F-4695 rabon@rmengineer.com CD1-260-0438-L04 Page 2 of 2