Loading...
HomeMy WebLinkAboutPublic Water System Plan ReviewPUBLIC WATER SYSTEM PLAN REVIEW SUBMITTAL FORM (Complete and Attach to Submittal Package) Date: April 12, 2012 TCEQ PWS Identification No.*: Water System Name: Welibor Water System Owner: Wellbo Address: P.O. Box 260, Welit County (system Engineer: Firm Nam Firm Addl No. or Application No.**:11340 division Sec., Phase, Unit, etc. Creek Meadows —Section 3 Ph 1 & Source of Financing: Private istration Number: 88683 * If no PWS Number exists, the owner must submit a business plan, if required, in accordance with §290.39(f) and (g). "* If a required CCN number does not exist, an acceptable application to obtain a CCN number must be made before a project submittal can be technically reviewed. In addition, if a submittal is for a project located outside the CCN area, a CCN amendment application must be submitted before a project may be reviewed for construction approval. Please refer to 30 TAC Chapter 291 for additional information regarding CCNs. If this is a new (proposed) system, you must attach the following with this submittal: NOT APPLICABLE ❑ Attach a list of all water utilities within % mile of the proposed service area boundaries ❑ Copies of formal applications for service from each of the following ❑ any municipality if the system is within its ETJ; ❑ any district or other political subdivision whose corporate boundaries are within'/ mile of the proposed service area boundaries ❑ any other water service provider whose certificated service area boundary is within''/3 mile of the proposed service area boundaries ❑ Documentation that all application requirements including payment of fees were complied with. ❑ Copies of written responses from each of the entities listed above. ❑ Business plan, if required by 30 TAC 290.39(f) & (g). The business plan financial requirements for non -community water systems must confirm capital availability to construct the system according to TCEQ requirements. This would consist of a balance sheet that shows liabilities as well as assets, not just a bank confirmation of a deposit account. Alternatively, if the project is being constructed with loan funds, then a loan commitment letter from the lender specific to that project will suffice. ❑ Justification for constructing a separate system (unless none of the entities listed above exist) ❑ Plans and specifications with an engineering report all sealed by design engineer. Type of Project (please check the appropriate boxes) ✓ Distribution System Modifications ❑ Storage Capacity Modifications ❑ Well completion data on previously approved well ❑ Water Well Construction, Proposed ❑ Pressure Maintenance Facilities Modifications ❑ Proposed Innovative Process Study ❑ Disinfection Facilities or Other Modifications ❑ Ground Water Treatment Plant, New ❑ Preliminary Engineering Report w/o plans ❑ Surface Water Treatment Plant, New ❑ Modification of Surface Water Treatment Plant ❑ Tex. Water Dev. Board Proj. No._ IF THIS SUBMITTAL IS A REVISION OF PREVIOUSLY SUBMITTED PLANS, PLEASE ENTER THE ASSIGNED TCEQ LOG NUMBER: . Please call (512) 239-6960 if you have questions regarding this form. Your cooperation will help us provide better service. Additional helpful information and rules are available at our website: http.//www. tceq.state. tx. us/permitting/waterperm/ud/planrev. html I hereby certify that the above information is, to the best of my knowledge, true and correct. = F of t 5 ........ Xgstlll Rabon A. Metcalf, P.E. April 12, 2012 i......... ET i Printed Engineer's Name Date 58s Revised 9/12/02 I Ilk NA ����` �� t C:\USERS\RABON\RME\PROJECTS\260-0438 OGG-CREEK MEADOWS-S3P1\ENGINEERING\TCEQ FOR3.i-WATER