HomeMy WebLinkAboutStaff Comments1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.35701 Fax 979.764.3496 MEMORANDUM March 29, 2012 / TO: Alton Ofczarzak, TDG Management, LP, via email: monica(a)oakchb.com UUU FROM: Jason Schubert, AICP Principal Planner SUBJECT: WE RENT STORAGE (SP/NRA) I reviewed the above -mentioned SITE PLAN - COMMERCIAL and NON-RESIDENTIAL ARCHITECTURE STANDARDS application and determined it to be incomplete. The following is the preliminary list of items needed to complete the submittal so that staff may conduct a thorough review. Please submit the following information by 10 a.m. on any Monday for review that week: Submit the $600 Development Permit application fee for the site plan. The Development Permit fee for the final plat (12-33) is for the plat -related review and infrastructure. It is my understanding that site -related engineering documents have been submitted during the final plat review but should have been submitted as part of this application. Please be aware that if this application is not completed before Monday, May 21, 2012, it will expire and a new application and fees will be necessary to continue the site development process. If you have any questions or need additional information, please call me at 979.764.3570. cc: Michael Hester, Hester Engineerin�q Company, via email: mhester(7a.hester-enar.com Case file No. 12-00500065 (SP) Case file No, 12-00500066 (NRA) V All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. o Please see L1, Note added Reviewed by: Lauren Hovde, Staff Planner Date: April 18, 2012 ENGINEERING COMMENTS NO. 1 — Site Plan 1. Please show all easements (existing & proposed on- and off -site) and label with volume and page number. o Please see plan. 2. Please verify that the underground electrical infrastructure on the eastern side of the property does not need a PUE. o The underground electrical lines are service lines and an easement is not required. 3. Please verify that the Verizon infrastructure on the western side of the property does not need to be within an easement. o The line is a service line that goes to the cell tower. 4. The average and maximum water demands need to be revised such that the peak demand is equal to the average demand multiplied by 4. o Please see plan, I also revised the sanitary sewer demand. 5. Add a note regarding the existence of FEMA regulated floodplain on the site. o Please see plan. 6. Each fire hydrant needs to be labeled with the required fire flow for that hydrant. o Please see plan. 7. Please add a note indicating fire flow required in accordance with the IFC. Include building size, construction material type, whether or not buildings will be sprinkled, and required fire flow demand in the note. o Please see plan. 8. Please show and label all proposed light poles on the site. o All of the lighting will be attached to be buildings, no light poles to my knowledge. 9. Engineering plans and documents are still under review and may affect the site plan. Reviewed by: Erika Bridges Date: April 17, 2012 ELECTRICAL COMMENTS NO. 2 REQUIRING IMMEDIATE ATTENTION 1. All easements on site are existing. Electric facilities will be designed within existing easements. 2. Developer may be responsible for locating easements on site to insure that electrical infrastructure is installed within easement boundaries. GENERAL ELECTRICAL COMMENTS NO. 2 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer provides 30' of rigid or IMC conduit for riser poles. CSU installs riser. 4. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. 5. if conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. 6. Developer pours electric device pads or footings (i.e. transformers, pull boxes etc) per CSU specs and design. 7. Developer installs pull boxes and secondary pedestals per CSU specs and design (pull boxes and secondary pedestals provided by CSU). 8. Developer provides digital AutoCAD 2000 or later version of plat and / or site plan. Email to: ehorton@cstx.gov. 9. Developer provides load data to CSU as soon as it is available to avoid construction delays. Delivery time for transformers not in stock is approximately 40 weeks. 10. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformer(s), pull box(es), switchgear(s), meter location and conduit routing as designed by CSU. 11. To discuss any of the above electrical comments please contact Eric Horton at 979.764.6280. Reviewed by: Eric Horton Date: April 19, 2012 SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: April 12, 2012 FIRE Comments are pending. - CITY OF COLLEGE STATION _. Home ofTex&A&M University° 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 976.764.3570 / Fax 979.764.3496 MEMORANDUM April 5, 2012 TO: Alton Ofczarzak, TDG Management, LP, via email: monica(a)oakchb.com FROM: Jason Schubert, AICP Principal Planner SUBJECT: WE RENT STORAGE (SP/NRA) I Thank you for the submittal of the required application fee for your SITE PLAN - COMMERCIAL and NON-RESIDENTIAL ARCHITECTURE STANDARDS application. This project will be distributed to staff next week for their review. cc: Michael Hester, Hester Engineering Company, via email: mhesterp-hester-engr.com Case file No. 12-00500065 (SP) Case file No. 12-00500066 (NRA) �i 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.35701 Fax 979.764.3496 CIT) (1) C11I',d 1I %I1�T M-,, 41 ,.a rw l %„ .,,,," MEMORANDUM April 20, 2012 TO: Alton Ofczarzak, TDG Management, LP, via email: monicanoakchb.com FROM: Lauren A. Hovde, Staff Planner SUBJECT: We Rent Storage - Site Plan Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by any Monday at 10:00 a.m. for further staff review: City of College Station Transmittal Letter; Memo providing written responses to all of staff's comments (identify the specific page that each comment was addressed on or the reason for not addressing the comment); Four (4) revised site and one (1) landscaping plan; Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please contact Lauren Hovde at 979.764.3570. Attachments: Staff review comments cc: Michael Hester, Hester Engineering Company, via email: mhester�hester-engr.comen�r.co n Case file #12-00500065 Y n6 dt wd, In car (2 1 STAFF REVIEW COMMENTS NO. 1 Project: We Rent Storage (SP) — 12-00500065 SUBMITTED TO COCS PLANNING April 24, 2012 PLANNING 1. Perimeter site dimensions need to be added to the property. o Please see plan. Parking must be screened according to Section 7.9.D.2 of the LIDO. o Parking is screened by the 8-foot tall fence along Horse Haven Lane and the landscaping? Al0 Md- K) /71—I° Please show the location of the knox box, bike�ks (2), multivw path bench, and ext or wall mounted lights. o Please see plan. t 4. / Please provide the total building square footage to the site plan and label each building with the height (tallest point). o Please see plan. Please provide a detail of the curb and pavement graphic found in the Site Design Standards, inverted U bike rack (2 are required), dumpster enclosure treatment, and exterior light fixtures. o The curb and pavement detail for commercial driveways (Sheet SDD) is in the construction plans? 0 tY o Inverted bike rack was added to sheet SDD (� o Dumpster enclosure added to sheet SDD o Please see architectural plans for exterior light fixture detail. The curb return radii at the driveway entrance needs to be labeled. The driveway also needs to be designated as a fire lane. The fire lane must be striped and labeled as "FIRE LANE -NO PARKING -TOW AWAY ZONE". o Please see plan. Please add a line legend. There appears to be an extra line parallel to the Horse Haven property line. o Please see plan, yes the line was extra line was removed. Please provide the zoning for the subject tract. Also, Single -Family Residential zoning is R- 1, not SF-1 as shown. Please revise. o Please see plan. The handicap space with a wheel stop must be 20 feet long. The useable space must be a minimum of 18 feet in depth. o Please see plan. 1fd. There must be a 180-square foot parking island on the southwest side of the handicap V parking space. Each island needs to be labeled with its square footage. o Please see plan. The drive aisle beside Building F is 13 feet wide. 1 have concern whether this is adequate to accommodate moving trucks. o The Owner is satisfied with this layout. A drive aisle that abuts parking spaces must be at least 23 feet wide to accommodate backing maneuver. o Please see plans. The sidewalk on the south side of Building A needs to be shorted so as to not disrupt the fire lane. o Please see plans. I believe the line you are looking at is the set back line, the sidewalk stops at the back of the curb. Ol-he curb on the east side of Building A needs to continue around the corner to meet the sidewalk ramp. o Please see plan. The 4-foot sidewalk that approaches the entrance gate from the right-of-way needs to be curbed along the driveway. o Please see plan. 16. Please show the full extent of the sidewalk connection on Lot 2. o The continuation of the sidewalk is on sheets MUP and SS-1. Please add a note that We Rent Storage will be considered as one building plot for the purpose of signage, landscaping, and Non -Residential Architectural Standards for building plots over 20,000 square feet in area. o Please see plan. Please be aware that according to the UDO Section 7.1.1-1 Height, the structure shown 50 feet from the properly line adjacent to single family can only build to a height of 25 feet. o Please see building heights on each building. Please add a note that all signage must be permitted separately. o Please see plan. Provide a general note on the site plan that all roof and ground -mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right-of-way or residential district within 150' of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance. o Please see plan. JProvide a general note on the site plan that states the following: Exterior building and site lighting will meet the standards of Section 7.10 of the Unified Development Ordinance. The light source shall not project below an opaque housing and no fixture shall directly project light horizontally. Fixtures will be mounted in such a manner that the projected cone of light does not cross any property line. o Please see plan. FYI ... The 12'x12' dumpster enclosure will not accommodate interior bollards. This space is the minimum interior clearance. 23. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not be made of aware of will constitute a completely new review. LANDSCAPING/STREETSCAPING/BUFFER 2�l Parking must be screened according to Section 7.9.D.2 of the UDO. An option is to double the landscaping points. Currently you have 8901 points outside of the buffer requirement, and 1561 (equivalent to 11 trees or 150 shrubs) additional points would satisfy this requirement. o Please see L1. . Please make sure that all new Live Oaks that are counting for points are within the bounds of the property. There are two that are right on the property line that need to be shifted. o Please see plan. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double -Check Back Flow Device, and installed as per City Ordinance 2394. o Please see L1, note added. 1�1 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 CITY Of COIAHGP.$TATION - H,n,, nj Avm A6N Mme,,x y' MEMORANDUM April 20, 2012 / TO: Alton Ofczarzak, TDG Management, LP, via email: monica(cDoakchb.com N FROM: Lauren A. Hovde, Staff Planner ()){v SUBJECT: We Rent Storage - Site Plan (f i Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by any Monday at 10:00 a.m. for further staff review: City of College Station Transmittal Letter; Memo providing written responses to all of staff's comments (identify the specific page that each comment was addressed on or the reason for not addressing the comment); Four (4) revised site and one (1) landscaping plan; Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please contact Lauren Hovde at 979.764.3570. Attachments: Staff review comments cc: Michael Hester, Hester Engineering Company, via email: mhester(c:Dhester-engr.com✓ Case file #12-00500065 STAFF REVIEW COMMENTS NO. 1 Project: We Rent Storage (SP) — 12-00500065 PLANNING 1. Perimeter site dimensions need to be added to the property. 2. Parking must be screened according to Section 7.9.D.2 of the UDO. 3. Please show the location of the knox box, bike racks (2), multi -use path bench, and exterior wall mounted lights. 4. Please provide the total building square footage to the site plan and label each building with the height (tallest point). 5. Please provide a detail of the curb and pavement graphic found in the Site Design Standards, inverted U bike rack (2 are required), dumpster enclosure treatment, and exterior light fixtures. 6. The curb return radii at the driveway entrance needs to be labeled. The driveway also needs to be designated as a fire lane. The fire lane must be striped and labeled as "FIRE LANE -NO PARKING -TOW AWAY ZONE". 7. Please add a line legend. There appears to be an extra line parallel to the Horse Haven property line. 8. Please provide the zoning for the subject tract. Also, Single -Family Residential zoning is R- 1, not SF-1 as shown. Please revise. 9. The handicap space with a wheel stop must be 20 feet long. The useable space must be a minimum of 18 feet in depth. 10. There must be a 180-square foot parking island on the southwest side of the handicap parking space. Each island needs to be labeled with its square footage. 11. The drive aisle beside Building F is 13 feet wide. I have concern whether this is adequate to accommodate moving trucks. 12. A drive aisle that abuts parking spaces must be at least 23 feet wide to accommodate backing maneuver. 13. The sidewalk on the south side of Building A needs to be shorted so as to not disrupt the fire lane. 14. The curb on the east side of Building A needs to continue around the corner to meet the sidewalk ramp. 15. The 4-foot sidewalk that approaches the entrance gate from the right-of-way needs to be curbed along the driveway. 16. Please show the full extent of the sidewalk connection on Lot 2. 17. Please add a note that We Rent Storage will be considered as one building plot for the purpose of signage, landscaping, and Non -Residential Architectural Standards for building plots over 20,000 square feet in area. 18. Please be aware that according to the UDO Section 7.1.H Height, the structure shown 50 feet from the property line adjacent to single family can only build to a height of 25 feet. 19. Please add a note that all signage must be permitted separately. 20. Provide a general note on the site plan that all roof and ground -mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right-of-way or residential district within 150' of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance. 21. Provide a general note on the site plan that states the following: Exterior building and site lighting will meet the standards of Section 7.10 of the Unified Development Ordinance. The light source shall not project below an opaque housing and no fixture shall directly project light horizontally. Fixtures will be mounted in such a manner that the projected cone of light does not cross any property line. 22. FYI ... The 12'x12' dumpster enclosure will not accommodate interior bollards. This space is the minimum interior clearance. 23. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not be made of aware of will constitute a completely new review. LAN DSCAPING/STREETSCAPING/BUFFER 24. Parking must be screened according to Section 7.9.D.2 of the UDO. An option is to double the landscaping points. Currently you have 8901 points outside of the buffer requirement, and 1561 (equivalent to 11 trees or 150 shrubs) additional points would satisfy this requirement. 25. Please make sure that all new Live Oaks that are counting for points are within the bounds of the property. There are two that are right on the property line that need to be shifted. 26. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double -Check Back Flow Device, and installed as per City Ordinance 2394. 27. All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. Reviewed by: Lauren Hovde, Staff Planner Date: April 18, 2012 ENGINEERING COMMENTS NO. 1 —Site Plan 1. Please show all easements (existing & proposed on- and off -site) and label with volume and page number. 2. Please verify that the underground electrical infrastructure on the eastern side of the property does not need a PUE. 3. Please verify that the Verizon infrastructure on the western side of the property does not need to be within an easement. 4. The average and maximum water demands need to be revised such that the peak demand is equal to the average demand multiplied by 4. 5. Add a note regarding the existence of FEMA regulated floodplain on the site. 6. Each fire hydrant needs to be labeled with,.the required fire flow for that hydrant. 7. Please add a note indicating fire flow required in accordance with the IFC. Include building size, construction material type, whether or not buildings will be sprinkled, and required fire flow demand in the note. 8. Please show and label all proposed light poles on the site. 9. Engineering plans and documents are still under review and may affect the site plan. Reviewed by: Erika Bridges Date: April 17, 2012 ELECTRICAL COMMENTS NO. 2 REQUIRING IMMEDIATE ATTENTION 1. All easements on site are existing. Electric facilities will be designed within existing easements. 2. Developer may be responsible for locating easements on site to insure that electrical infrastructure is installed within easement boundaries. GENERAL ELECTRICAL COMMENTS NO. 2 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer provides 30' of rigid or IMC conduit for riser poles. CSU installs riser. 4. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. 5. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. 6. Developer pours electric device pads or footings (i.e. transformers, pull boxes etc) per CSU specs and design. 7. Developer installs pull boxes and secondary pedestals per CSU specs and design (pull boxes and secondary pedestals provided by CSU). 8. Developer provides digital AutoCAD 2000 or later version of plat and / or site plan. Email to: ehorton@cstx.gov. 9. Developer provides load data to CSU as soon as it is available to avoid construction delays. Delivery time for transformers not in stock is approximately 40 weeks. 10, Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformer(s), pull box(es), switchgear(s), meter location and conduit routing as designed by CSU. 11. To discuss any of the above electrical comments please contact Eric Horton at 979.764.6280. Reviewed by: Eric Horton Date: April 19, 2012 SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: April 12, 2012 FIRE Comments are pending. CITY OF COLLEGE STATION Planning d DmIawnentSeoias 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM May 1, 2012 TO: Alton Ofczarzak, TDG Management, LP, via email: monica(a)oakchb.com/ FROM: Erika Bridges SUBJECT: Engineering Document Comments for We Rent Storage- SP Staff reviewed the above -mentioned engineering documents as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by any Monday by 10:00 a.m. for further staff review and approval of the plans: One (1) set of revised construction documents. Please note that the Development Permit Balance (Public Infrastructure Review and Inspection Fee), will be calculated and requested once the construction documents and engineer's estimates have been reviewed and approved. If you have any questions or need additional information, please call Erika Bridges at 979.764.3570. Attachments: Staff review comments PC: Michael Hester, Hester Engineering Company, via email: mhester(a)hester-engr.com/ Case file #12-00500065 ENGINEERING COMMENTS NO. 2 — Construction Documents 1. S1 — Please add a note referencing the LOMR that removed this lot from the floodplain/floodway. 2. S1 — FYI... It appears that there is a sign being proposed within the right-of-way and PUE. While signage will require a separate permit, the sign may need to be moved outside of the PUE and/or a PIP application required. 3. G1 — The maximum 6% grade along the fire lane is being exceeded. 4. G1 — Verify that the 3:1 maximum grading is not being exceeded around the perimeter. 5. W1 — Please add an additional valve on the existing 8-inch waterline at each tie-in. 6. W1 — It appears that there is only a single bend rather than the two bends referenced on the waterline for fire hydrant #1. 7. W1 — Please adjust the waterlines to provide a minimum 5.5-ft from the center of the waterline to the edge of the PUE. 8. W1 — The guidelines do not permit an 8-inch waterline to be dead -ended with a fire hydrant. Please replace with 6-inch waterlines and revise cost estimate accordingly. 9. SS1 — It looks like a retaining wall is being proposed along the front of the property. Retaining walls will need to be removed or moved outside of the PUE. FYI... Retaining walls will require separate building permits. 10. SS2 — Why is the pipe flowline tying into the headwall approximately 1.5' above the outfall. 11. SS2 — On the Drive C profile, label the inlet in profile view with the inlet flowline and pipe flowline. 12. Water Report — Please indicate the fire flow requirement in accordance with the International Fire Code. 13. Water Report — Provide a WaterCAD analysis with the velocity in all lines under fire flow plus peak hour condition. 14. Drainage Report — Provide a detention exemption letter in accordance with Section II.C.3.b. of the Unified Stormwater Design Guidelines. Reviewed by: Erika Bridges Date: 4/30/12 (*01F4" C:rry or• Coi.i.r:c,�: Sncrion 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM May 1, 2012 TO: Alton Ofczarzak, TDG Management, LP, via email: monicacDoakchb.com FROM: Erika Bridges SUBJECT: Engineering Document Comments for We Rent Storage- SP Staff reviewed the above -mentioned engineering documents as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by any Monday by 10:00 a.m. for further staff review and approval of the plans: One (1) set of revised construction documents. Please note that the Development Permit Balance (Public Infrastructure Review and Inspection Fee), will be calculated and requested once the construction documents and engineer's estimates have been reviewed and approved. If you have any questions or need additional information, please call Erika Bridges at 979.764,3570. Attachments: Staff review comments PC: Michael Hester, Hester Engineering Company, via email: mhesternhester-enar.com Case file #12-00500065 ENGINEERING COMMENTS NO. 2 —Construction Documents I. S1 — Please add a note referencing the LOMR that removed this lot from the floodplain/floodway. o Please see plan, a note was added to S1, please see box "A portion of the lot is in the FEMA floodplain per firm map no 48........D map revised 2/9/2000. "Floodway revised per LOMA 09-06-0200A" 2. S1 — FYI ... It appears that there is a sign being proposed within the right-of-way and PUE. While signage will require a separate permit, the sign may need to be moved outside of the PUE and/or a PIP application required. o There are no signs proposed with the site plan, all signs shown are existing utility signs that will be removed if necessary. The sign for the facility will be submitted separately. 3. G1 —The maximum 6% grade along the fire lane is being exceeded. o Please see plan, the slope was revised to 6%. 4. G1 — Verify that the 3:1 maximum grading is not being exceeded around the perimeter. o Please see the plans, 3:1 is the maximum slope. The slope along the multi use path has been revised and landscaping blocks have been added to break up the 2:1 slope. 5. W1 — Please add an additional valve on the existing 8-inch waterline at each tie-in. o Please see plans 6. W1 — It appears that there is only a single bend rather than the two bends referenced on the waterline for fire hydrant #1. o Please see plans. 7. W1 — Please adjust the waterlines to provide a minimum 5.5-ft from the center of the waterline to the edge of the PUE. o Please see plans. 8. W1 — The guidelines do not permit an 8-inch waterline to be dead -ended with a fire hydrant. Please replace with 6-inch waterlines and revise cost estimate accordingly. o Please see plans. 9. SS1 — It looks like a retaining wall is being proposed along the front of the property. Retaining walls will need to be removed or moved outside of the PUE. FYI... Retaining walls will require separate building permits. o This is not a retaining wall it is keystone style landscape stones and they are just to decrease the slope in the area. 10. SS2 — Why is the pipe flow line tying into the headwall approximately 1.5' above the outfall. o This is how the hydraulics of the storm sewer worked out. The system is designed on friction flow and the pipe has the required capacity. This saves depth on the line. Also the drop will act as an energy dissipater. 11. SS2 — On the Drive C profile, label the inlet in profile view with the inlet flowline and pipe flowline. o Please see plan. 12. Water Report — Please indicate the fire flow requirement in accordance with the International Fire Code. o I have added the fire flow requirements to sheet S-1 and the report. 13. Water Report — Provide a WaterCAD analysis with the velocity in all lines under fire flow plus peak hour condition. o Please see report 14. Drainage Report — Provide a detention exemption letter in accordance with Section II.C.3.b. of the Unified Stormwater Design Guidelines. o See attachment Reviewed by: Erika Bridges Date: 4/30/12 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 011 ,1 C(,I II(a $l l'I NIn MEMORANDUM May 3, 2012 TO: Alton Ofczarzak, TDG Management, LP, via email: monicaftoakchb.com FROM: Lauren Hovde, Staff Planner SUBJECT: We Rent Storage - Site Plan Comments #2 Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. The next submittal will be the third and final review by staff for this round of reviews. If all items have not been addressed on the next submittal, another $932 processing fee will need to be submitted for the subsequent set of three (3) reviews. Please address the comments and submit the following information by any Monday at 10:00 a.m. for further staff review: City of College Station Transmittal Letter Seven (7) complete sets of site civil construction documents for the proposed development with the revised site and landscaping plans attached (one set will be returned to you, please submit additional copies if you want more than one approved set) Two (2) revised site plans One (1) landscaping plan One (1) 1 1x1 7 grading and erosion control plan Four (4) copies of the elevations Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Michael Hester, Hester Engineering Company, via email: mhester hester-enor.com Steven Byrne via email: sbvrne1016 cDgmail.com Case file #12-00500065 STAFF REVIEW COMMENTS NO. 2 Project: We Rent Storage (SP)-12-00500065 5-16-12 PLANNING 1. Sheet SDD and SS-1 were not resubmitted for review. The original SDD did not include a bAfe rack detail and the doweled -in curb needs to be replaced with a 6" monolithic curb. o Please see sheet SDD. ,e fire lane needs to arked as "No Parking -Fire Lane- Tow Away Zone". o Please see S-1 ,3! Please provide the to are footage of all buildings. o/ Please see S-1 "The building height provided is taller than allowed by the PDD zoning district, but this is currently being addressed through the elevation revisions. Please wait to resubmit until the revised heights are known. V9111Please see S-1 he bike pad must be 9'x6' in area. Please see sheet SDD & S-1 �6J lease contact Steve Smith, Deputy Fire Marshal, regarding the greater than 6% fire lane slope. o This was revised please see G-1 that was submitted 5-3-12. tii A knox switch needs to be provided for the gate. o Please see S-1. 8. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. Reviewed by: Lauren A. Hovde ENGINEERING COMMENTS NO.3 Date: May 3, 2012 1. Please show all easements (existing & proposed on- and off -site) and label with volume and page number. The 20' PAE on the east side of the property still needs the volume and page to be labeled. o Please see S-1 2. Please verify that the Verizon infrastructure on the western side of the property does not need to be within an easement. There should be some sort of private easement/agreement giving Verizon access across this property. o Mr. Ofczarzak (Owner) is working to get this issue resolved with the utilites. 3. The average and maximum water demands need to be revised such that the peak demand is equal to the average demand multiplied by 4. The water demands still need to be adjusted to provide a different value for average and maximum demands. o Please see S-1. 4. Add a note regarding the existence of FEMA regulated floodplain on the site. Please clarify whether the floodplain line shown is 100-year floodplain or floodway. There Is one label that references a "revised floodway," so if this is floodway the rip rap and turf map will require a letter certifying that it will be installed at grade and have no impact on channel function. o Please see S-1 for the revised note, the floodplain is delineated from the BFE's as shown on the FEMA FIRM Map 163C & the floodway is delineated from the revised LOMR 09-06-0200A. The floodplain and the floodway are the same line due to the BFE's. Also please see sheet SS-2, profile Drive C, the profile shows that the concrete headwall and rock rip rap are above the BFE and will not impact channel function. Reviewed by: Erika Bridges Date: 5/4/12 4*00rq" CITY OFi.OLLEGF 5" WHON f'fannvg t'r 17€evinrrweo Srrrim 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM May 17, 2012 TO: Alton Ofczarzak, Managing Member, TDG Mgmt; via email monica@oakchb.com FROM: Erika Bridges SUBJECT: Engineering Document Comments for We Rent Storage Staff reviewed the above -mentioned engineering documents as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by Monday, DATE, at 10:00 a.m. for further staff review and approval of the plans: One (1) set of revised construction documents. Please note that the Development Permit Balance (Public Infrastructure Review and Inspection Fee), will be calculated and requested once the construction documents and engineer's estimates have been reviewed and approved. If you have any questions or need additional information, please call Erika at 979.764.3570. Attachments: Staff review comments PC: Michael Hester, PE, Hester Engineering; via email mhester@hester-engr.com Case File No. 12-500065 ENGINEERING COMMENTS NO. 4—Construction Documents (Repeat) S1 — FYI... It appears that there is a sign being proposed within the right-of-way and PUE. While signage will require a separate permit, the sign may need to be moved outside of the PUE and/or a PIP application required. Please clearly label the existing planter box/landscaping along Horse Haven Ln. o No signs are proposed on the site plan, the only signs shown are existing. 2. (Repeat) G1 — The maximum 6% grade along the fire lane is being exceeded. There are still a few areas where 6% is being exceeded. Please note that a maximum grade of 6% is required in all directions along a fire lane. o Please see sheet G-1 3. (Repeat) W1 — Please add an additional valve on the existing 8-inch waterline at each tie-in. A valve is also required within 5-ft of the fire hydrants. Since both mains serving the fire hydrants exceed 15 feet, additional valves within 5-ft of the hydrants needs to be included. o Please see sheet S-1 (Repeat) SS1 — It looks like a retaining wall is being proposed along the front of the property. Retaining walls will need to be removed or moved outside of the PUE. FYI... Retaining walls will require separate building permits. Even if the "keystone walls" are only constructed with landscape blocks, they are still acting as retaining walls and will need to be moved outside of PUEs. If these areas can be graded at a maximum of 4:1 without a landscape wall they may remain in the proposed location. o This is a landscape wall to lessen the slope and will not exceed 16" in height. 5. (Repeat) Water Report— Provide a WaterCAD analysis with the velocity in all lines under fire flow plus peak hour condition. The WaterCAD tables need to show the velocity in each waterline segment when the system is analyzed with fire flow and peak domestic demands concurrently. o Please see attached revised water report. Velocities were added to the pipe report 6. (Repeat) Drainage Report — Provide a detention exemption letter in accordance with Section II.C.3.b. of the Unified Stormwater Design Guidelines. The exemption letter needs to also reference which of the 4 referenced conditions this project meets in order to be exempt from the detention requirement. If none of these conditions apply, then detention is required for the site. o Find revised letter attached, the exemption was added to the letter Reviewed by: Erika Bridges Date: 5/17/12 Attached: Revised G-1 (7 copies) Revised water report Revised Detention letter (*Orq" CITY OF COLLEGE STATION Planning &Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM V May 17, 2012 TO: Alton Ofczarzak, Managing Member, TDG Mgmt; via email monica@oakchb.comtl" FROM: Erika Bridges SUBJECT: Engineering Document Comments for We Rent Storage Staff reviewed the above -mentioned engineering documents as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by Monday, DATE, at 10:00 a.m. for further staff review and approval of the plans: One (1) set of revised construction documents. Please note that the Development Permit Balance (Public Infrastructure Review and Inspection Fee), will be calculated and requested once the construction documents and engineer's estimates have been reviewed and approved. If you have any questions or need additional information, please call Erika at 979.764.3570. Attachments: Staff review comments PC: Michael Hester, PE, Hester Engineering; via email mhester@hester-engr.com Case File No. 12-500065 N ENGINEERING COMMENTS NO. 4 — Construction Documents 1. (Repeat) S1 — FYI ... It appears that there is a sign being proposed within the right-of-way and PUE. While signage will require a separate permit, the sign may need to be moved outside of the PUE and/or a PIP application required. Please clearly label the existing planter box/landscaping along Horse Haven Ln. 2. (Repeat) G1 — The maximum 6% grade along the fire lane is being exceeded. There are still a few areas where 6% is being exceeded. Please note that a maximum grade of 6% is required in all directions along a fire lane. 3. (Repeat) W1 — Please add an additional valve on the existing 8-inch waterline at each tie-in. A valve is also required within 5-ft of the fire hydrants. Since both mains serving the fire hydrants exceed 15 feet, additional valves within 5-ft of the hydrants needs to be included. 4. (Repeat) SS1 — It looks like a retaining wall is being proposed along the front of the property. Retaining walls will need to be removed or moved outside of the PUE. FYI... Retaining walls will require separate building permits. Even if the "keystone walls" are only constructed with landscape blocks, they are still acting as retaining walls and will need to be moved outside of PUEs. If these areas can be graded at a maximum of 4:1 without a landscape wall they may remain in the proposed location. 5. (Repeat) Water Report — Provide a WaterCAD analysis with the velocity in all lines under fire flow plus peak hour condition. The WaterCAD tables need to show the velocity in each waterline segment when the system is analyzed with fire flow and peak domestic demands concurrently. 6. (Repeat) Drainage Report — Provide a detention exemption letter in accordance with Section II.C.3.b. of the Unified Stormwater Design Guidelines. The exemption letter needs to also reference which of the 4 referenced conditions this project meets in order to be exempt from the detention requirement. If none of these conditions apply, then detention is required for the site. Reviewed by: Erika Bridges Date: 5/17/12