Waterline Engineers Preliminary Quantity and Cost Estimate
3/22/2012
ITEM
DESCRIPTION
UNIT
QUANTITY
UNIT COST
EXTENSION
1
PREPARATION: REMOVE AND REPLACE FENCE, RETURN
AFFECTED AREA TO PRE -CONSTRUCTION CONDITION OR
BETTER
L.S.
1
$1,000.00
$1,000.00
2
CUT IN 8"X8" TEES - COMPLETE IN PLACE
EA
2
$5,000.00
$10,000.00
3
B" C900 WATERLINE CL200 DR14
L.F.
118
$25.00
$2,950.00
4
8"X11,25 DEG BEND
EA.
1
$250.00
$250.00
5
8"X22.5 DEG BEND
EA.
1
$250.00
$250.00
6
STANDARD FIRE HYDRANTS
EA.
2
$2,750.00
$5,500.00
7
8" GATE VALVE
EA.
2
$500.00
$1,000.00
THE SEAL APPEARNG ON THIS DOCUMENT WAS
AUTHORIZED BY MICHAEL G. HESTER, P.E. ON March 22, 2012
RELEASED FOR PRELIMINARY REVIEW
HESTER ENGINEERING COMPANY Nf-3476
TOTAL ESTIMATED CONSTRUCTION COST = $20,950.00
OF TF�.-9
5• � s
MICHAEL G.•HESTER
69'104 4
We Rent Storage
Waterline Engineers Preliminary Quantity and Cost Estimate
3/22/2012
ITEM
DESCRIPTION
UNIT
QUANTITY
UNIT COST
EXTENSION
1
PREPARATION: REMOVE AND REPLACE FENCE, RETURN
AFFECTED AREA TO PRE -CONSTRUCTION CONDITION OR
BETTER
L.S.
1
$1,000.00
$1,000.00
2
CUT IN 8"X8" TEES - COMPLETE IN PLACE
EA
2
$5,000.00
$10,000.00
3
8" C900 WATERLINE CL200 DR14
L.F.
118
$25.00
$2,950.00
4
8"X11:25 DEG BEND
EA.
1
$25000
$250.00
5
8"X22.5 DEG BEND
EA.
1
$250,00
$250.00
6
STANDARD FIRE HYDRANTS
EA.
2
$2,750.00
$5,500.00
7
8" GATE VALVE
EA.
2
$500.00
$1,000.00
THE SEAL APPEARNG ON THIS DOCUMENT WAS
AUTHORIZED BY MICHAEL G. HESTER, P.E. ON March 22, 2012
RELEASED FOR PRELIMINARY REVIEW
HESTER ENGINEERING COMPANY #f~3476
TOTAL ESTIMATED CONSTRUCTION COST = $20,950,00