Loading...
HomeMy WebLinkAboutCorrespondenceKeith Tinker From: Eric Horton Sent: Thursday, April 11, 2013 9:27 AM To: Keith Tinker Cc: Gilbert Martinez Subject: RE: WE Rent Storage We have no issues. Thanks, Eric Horton. From: Gilbert Martinez Sent: Thursday, April 11, 2013 7:33 AM To: Eric Horton Subject: FW: WE Rent Storage Please respond to Tinker. Thanks. From: Keith Tinker Sent: Wednesday, April 10, 2013 3:24 PM To: Donnie Willis; Gilbert Martinez Subject: WE Rent Storage If you have any outstanding issues please let me know and I will add them to the punch list. Keith Tinker From: Donnie Willis Sent: Thursday, April 11, 2013 12:09 PM To: Keith Tinker Subject: RE: WE Rent Storage Keith, I went by there today and they are not close to having finished the landscaping. The big thing is the area south of the site, the sloped area where their equipment is parked. I can work this one myself it you want orjust put a general statement of re -vegetation and I will follow-up. From: Keith Tinker Sent: Wednesday, April 10, 2013 3:24 PM To: Donnie Willis; Gilbert Martinez Subject: WE Rent Storage If you have any outstanding issues please let me know and I will add them to the punch list. Hester Engineering Company 7607 Eastmark Drive, Suite 253-B College Station, Texas 77840 979-693-1100 mhester@hester-engr.com May 8, 2012 Erika Bridges, EIT CoCS Development Services Department P.O. Box 9960 College Station, Texas 77842 979-764-3570 Re! We Rent Storage No impact on channel function certification letter This letter certifies that the rip rap and turf mat to be Installed at the outfall of the storm sewer system will be installed at grade and have no impact on channel function. Sincerely, Pe Michael G. Hester. P.E. Hester Engineering Company 7607 Eastmark Drive, Suite 253-B College Station, Texas 77840 979-693-1100 mhester@hester-engr.com May 3, 2012 Erika Bridges, EIT CoCS Development Services Department P.O. Box 9960 College Station, Texas 77842 979-764-3570 Re: We Rent Storage Detention exemption letter in accordance with Section II.C,3.b. of the Unified Stormwater Design Guidelines I have conducted a topographic review and field investigation of the existing and proposed flow patterns for storm water runoff from (Ae Rent Storages to the main stream of (Wolf Pen Creek). At build -out conditions allowable by zoning, restrictive covenant, or plat note, the storm water flows from the subject subdivision or site project will not cause any increase in flooding conditions to the interior of existing building structures, including basement areas, for storms of magnitude up through the 100-year event. Sincerely, Michael G. Hester, P.E. Hester Engineering Company #f-3476 7607 Eastmark Drive, Suite 253-B College Station, Texas 77840 979-693-1100 mhester@hester-engr.com May 18, 2012 Erika Bridges, EIT CoCS Engineering Division P.O. Box 9960 College Station, Tx 77840 979-764-3570 Re: We Rent Storage Detention Exemption Letter Erika, Section II.C.3.b Unified Stormwater Design Guidelines. I have conducted a topographic review and field investigation of the existing and proposed flow patterns for stormwater runoff from (We Rent Storage) to the main strem of (Wolf Pen Creek). At build -out conditions allowable by zoning, restrictive covenant, or plat note, the stormwater flows from the subject subdivision or site project will not cause any increase in flooding conditions to the interior of existing building structures, including basement areas, for storms of magnitude up through the 100-year event The exemption that applies to this development: (4). Draining to Designated Streams At locations included in the drainage watersheds of certain streams stipulated as not requiring detention in Table B-2** in Appendix B, provided Type 2 Detention is not needed for managing property -to property stormf low. The actual table showing the Detention requirements by watershed is Appendix B Table B-1 (see attached). Sincerely Michael G. Hester, P.E. **Table B-2 Appendix is °Minimum Floor Elevations Along Selected Named Regulatory Watercourses" ? Attachment: CoCS Stormwater Design Guidelines Appendix B Table B-1 Erika Bridges From: Erika Bridges Sent: Tuesday, May 01, 2012 2:17 PM To: 'Michael G. Hester, P.E.' Cc: Lauren Hovde Subject: We Rent Storage Easements Mike, I'm processing the applications for the Temp. Blanket and Blanket Access Easements, and I need a copy of the recent (within 90 days) deed or title insurance policy. Please submit a hard copy as soon as possible. Thanks, Erika Bridges, EIT, CFM Graduate Civil Engineer Planning & Development Services 1101 Texas Avenue, College Station, TX 77842 (979)764-3570 City of College Station Home of Texas A&M University