Loading...
HomeMy WebLinkAboutStaff CommentsCITY OF COI=-Gr STATION Home ofTexruAerM Unieersiry' p 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 (� Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM January 9, 2012 TO: James M. Brooks, Ph. D., via email: drlmbrooks(ilaol.com y FROM: Jason Schubert, AICP Principal Planner SUBJECT: TDI BROOKS OFFICE BUILDING (SP) Thank you for the submittal of your SITE PLAN - COMMERCIAL application. This project will be distributed to staff this week for their review. cc: GE03, Inc., via email: IimbrooksCciltdi-bi.com Schultz Engineering, LLC., Joe Schultz, via email: ioeschultz84CO).verizon.net Arkitex Studio, Mike Record, via email: mrs oC7arkitex.com Case file no. 12-00500001 Case file no. 12-00500002 (*- 1� CITY Or COf EGI: STATION Name ofT A&M U"iLmiq' January 17, 2012 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM TO: James M. Brooks, PH. D; via email: drjmbrooks@aol.com FROM: Morgan Hester, Staff Planner SUBJECT: TDI Brooks Office Building (SP)- Site Plan Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by any Monday at 10:00 a.m. for further staff review: City of College Station Transmittal Letter; Memo providing written responses to all of staff's comments (identify the specific page that each comment was addressed on or the reason for not addressing the comment); Seven (7) complete sets of site civil construction documents for the proposed development with the revised site and landscaping plans attached (one set will be returned to you, please submit additional copies if you want more than one approved set); Two (2) revised site plans; One (1) landscaping plan; One (1) 11x17 grading and erosion control plan; Easement Dedication Sheet and required documents (please note that the Site Plan will not be stamped approved until the Blanket Easement, or all other appropriate easements, have been dedicated to the City of College Station). Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please contact Morgan Hester at 979.764.3570. Attachments: Staff review comments PC: GE03, Inc; via email: jimbrooks@tdi-bi.com Schultz Engineering, LLC, Joe Schultz; via email: joeschultz84@verizon.net Arkitex Studio, Mike Record; via fax 979.775.8224 Case file #12-00500001 STAFF REVIEW COMMENTS NO. 7 Project: TDI Brooks Office Building (SP)—12-00500001 PLANNING 1. Please change the horizontal scale in the title block to read 1=20'. 2. The curb needs to be removed for the ADA ramp. Please revise. 3. Provide a general note on.the site plan that states the following: Exterior building and site lighting will meet the standards of Section 7.10 of the Unified Development Ordinance. The light source shall not project below an opaque housing and no fixture shall directly project light horizontally. Fixtures will be mounted in such a manner that the projected cone of light does not cross any property line. 4. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not be made of aware of will constitute a completely new review. Reviewed by: Morgan Hester, Staff Planner Date: January 13, 2012 LAN DSCAPING/STREETSCAPING/BUFFER 1. Please show how the streetscape points are being determined, specifically, how is linear footage being measured? 2. Chaste Tree counts come to 36 and Prairie Flameleaf Sumac counts come to 21. Please revise. 3. Please provide a building plot note that states,"TDI Brooks International Center is to be considered one building plot for the purpose of signage, Non -Residential Architectural Standards, and landscaping in accordance with ordinances regarding building plots over 50,000 square feet in area." 4. Per UDO Section 7.5.D.3, "Three hundred additional landscape points shall be required for every 50 linear feet of frontage on a right-of-way." Please show a calculation that this requirement is being met. 5. Per UDO Section 7.9.E.3.a, "The minimum required landscape points for a site shall be double (2 x minimum landscape points) of that required for developments of less than 50,000 gross square feet in area. Please show a calculation that this requirement is being met. Reviewed by: Morgan Hester, Staff Planner Date: January 13, 2012 ENGINEERING COMMENTS NO. 1 Proposed easements will need to be dedicated via separate instrument prior to CO or the final plat needs to be updated to reflect the changed easement locations. Please submit an NOI. FYI... The plat for this subdivision will need to be filed prior to approval of the site plan. Provide an updated Water and Fire Flow report for this project. Provide an updated Detention Pond analysis. C1/C2 — Please clearly label the proposed water meters and valves. 7. C1/C2 — Please indicate that the waterline is existing. 8. C2 — Please label the isolation valve. 9. C2 — Please show the 2-ft proposed contours. 10. C2 — Show how Building #2 is tying into the OSSF system. 11. C2 — Show the fire lane signage on the Legend or label each sign. 12. C4 — The drainage swale paths should be reflected by the proposed contours. 13. C4 — Please label the longitudinal slopes of the proposed swales. Reviewed by: Erika Bridges Date: January 13, 2012 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. Project location is outside CSU certification area. CSU will not provide electric service to this location. GENERAL ELECTRICAL COMMENTS 1. To discuss any of the above electrical comments please contact Gilbert Martinez at 979.764.6255. Reviewed by: Gilbert Martinez Date: January 10, 2012 SANITATION 1. Need to show dumpster pad on site. Reviewed by: Wally Urrutia Date: January 12, 2012