HomeMy WebLinkAboutStaff Report(*0rq" CITY OFCOLLEGE LLEGE. STATION PRELIMINARY PLAT for Tower Point 11-00500202 SCALE: 27 lots on 128.17 acres LOCATION: 961 William D. Fitch Pkwy (northwest corner of SH 40 and SH 6) ZONING: C-1 General Commercial, 26 lots A-O Agricultural Open, 1 lot (detention pond) OV Corridor Overlay, 23 lots APPLICANT: Chuck Ellison, The Ellison Firm PROJECT MANAGER: Lauren A. Hovde, Staff Planner Ihovde@cstx.gov RECOMMENDATION: Staff recommends approval of the Preliminary Plat, which is amending the previously approved Preliminary Plat in order to add one additional lot to Phase 12. Planning & Zoning Commission Page 1 of 4 January 19, 2012 Planning & Zoning Commission Page 2 of 4 January 19, 2012 DEVELOPMENT HISTORY Annexation: 1983 and 1993 Zoning: A-0 Agricultural Open to C-1 General Commercial (2001); R-4 Multi -Family to C-1 General Commercial and A-P Administrative Professional — Decatur Drive Property (2005) Corridor Overlay (2006). Preliminary Plat: This property was included in the 1997 Master Plan of the Crowley Tract and first preliminary platted as Tower Point in 2006. The Preliminary Plat was revised in 2008, September 2009, November 2009, and again in 2010. The proposed Preliminary Plat amends Phase 12 to add an additional lot. Site development: To date, lots with a recorded final plat include Phase 1 A, Phase 1 B, Phase 2, Phase 3, Phase 4, Phase 5, Phase 8A, Phase 11A, and Phase 11 B which are not included in the scope of this Preliminary Plat. The remaining land is vacant with an established regional detention pond. COMMENTS Water: There are existing 24" waterlines along the SH 6 Frontage Rd. and William D. Fitch Pkwy. There are also 12" waterlines along Arrington Rd. and Decatur Dr. Domestic water service and fire protection are required to be extended to all lots. Sewer: There are existing 12", 15", 21 ", and 27 sanitary sewer trunk lines through the property. A public sewer main is required to be extended to all lots. Streets: Arrington Road and Decatur Drive have been constructed as two-lane major collectors as a Capital Improvement Project. Off -site Easements: None at this time. Drainage: There is an existing regional detention facility. Flood Plain: FEMA designated floodplain for Spring Creek is located on this property. A LOMR reflecting current floodplain conditions has been prepared and submitted to FEMA for review. Finished Floor elevations have been determined for the lots impacted by the floodplain. Greenways: N/A Pedestrian Connectivity: Developments within Tower Point are required to meet pedestrian connectivity requirement found in Section 7.9 of the Unified Development Ordinance related to building plots over 50,000 square feet. Planning & Zoning Commission Page 3 of 4 January 19, 2012 Bicycle Connectivity: A bike lane is provided along Arrington Road. Oversize Request: None requested. Impact Fees: The majority of the property is located in the Spring Creek Sewer Impact Fee Area (97-01). Currently, the Impact Fee for this area is $98.39 per Living Unit Equivalent. Impact Fees are due at time of Building Permit. Multi -Use Path: A blanket Public Access Easement on the detention pond lot shall be dedicated to the City in preparation for a 30' Public Access Easement that will be determined during the design and construction of a multi -use path as shown on the Bicycle, Pedestrian, and Greenways Master Plan. REVIEW CRITERIA 1. Compliance with Comprehensive Plan and Unified Development Ordinance: The proposed preliminary plat is in compliance with the Comprehensive Plan. Variances to block length requirements found in Section 8.2.A.10.b were approved with the September 2009 Preliminary Plat. The approval granted the following: • State Highway 6 - variance of 200 feet • State Highway 6 - variance of 550 feet • William D. Fitch Parkway - variance of 180 feet • Arrington Road —variance of 120 feet • Arrington Road —variance of 1494 feet • Arrington Road —variance of 1378 feet Additionally, variances to the sidewalk requirements found in Section 8.2.13.13 pertaining to State Highway 6 Frontage Road and William D. Fitch Parkway were approved in September 2009, with the condition that alternate means of pedestrian and bicycle connectivity is provided. This condition will be addressed by requiring each phase of the Tower Point development, regardless of size, to meet requirements found in Section 7.9 relating to pedestrian connectivity in building plots over 50,000 square feet. Since the proposed changes to the Preliminary Plat do not affect any of the above - referenced variances, each previously approved variance will remain valid and current. 2. Compliance with Subdivision Regulations: The Preliminary Plat is in compliance with the Subdivision Regulations. STAFF RECOMMENDATION Staff recommends approval of the Preliminary Plat. SUPPORTING MATERIALS 1. Application 2. Copy of Preliminary Plat (provided in packet) Planning & Zoning Commission Page 4 of 4 January 19, 2012