HomeMy WebLinkAboutStaff Comments1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM December 21, 2011 V fvA t,2`Z��(t TO: Charles A. Ellison via email: chuck@ellisonlaw.com FROM: Matt Robinson, AICP Senior Planner SUBJECT: TOWER POINT SUBDIVISION (PP) I reviewed the above -mentioned PRELIMINARY PLAT application and determined it to be incomplete. The following is the preliminary list of items needed to complete the submittal so that staff may conduct a thorough review. Please submit the following information by 10 a.m. on any Monday for review that week: The title report provided is dated December 14, 2010 and does not Save and Except all properties that have been final platted. Please submit a current report. Please be aware that if this application is not completed before February 13, 2012, it will expire and a new application and fees will be necessary to continue the platting process. If you have any questions or need additional information, please call me at 979.764.3570. 2.21-11 cc: College Station Marketplace, L.P. via email: and weiner weinerdevelo ment.com Kling Engineering & Surveying via email: stewartCcDklingeng.com Case file No. 11-00500202 Crry or, CO,LLE07 SnyriON Home r fTexds AdM University" 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM January 6, 2012 TO: Charles A. Ellison via email: chuck@ellisonlaw.com FROM: Lauren A. Hovde, Staff Planner SUBJECT: TOWER POINT - Preliminary Plan Staff reviewed the above -mentioned Preliminary Plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Wednesday, January 11, 2012, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for January 19, 2012, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. One (1) 24" x 36" copy of the revised Preliminary Plan; and Thirteen (13) 1 V x 17" copies of the revised Preliminary Plan. Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If all comments have not been addressed, your project will be pulled from the scheduled Planning & Zoning Commission agenda. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.gov/pz Please note that a Mylar original of the revised preliminary plan will be required after P&Z approval and prior to processing subsequent final plats. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: College Station Marketplace, L.P. via email: andyweiner(oweinerdevelopment.com Kling Engineering & Surveying via email: stewart(a)klingeng.com Case file #11-00500202 STAFF REVIEW COMMENTS NO. 1 Project: TOWER POINT (PP) — (11-00500202) ENGINEERING COMMENTS NO. 1 1. The preliminary plat is not reflecting the recent changes on Lots 4 & 5 of Phase 10A: " 20-ft PUE along rear of Lot 4 " PAE & PUE on lot line between lots 4 & 5 Reviewed by: Erika Bridges Date: January 4, 2012 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. Developer provides temporary blanket easement for construction purposes. 2. Developer provides descriptive easements for electric infrastructure as designed by CSU for electric lines and facilities. 3. Developer may be responsible for locating easements on site to insure that electrical infrastructure is installed within easement boundaries. GENERAL ELECTRICAL COMMENTS 1. Developer provides and installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical routing and installation. 3. In the event that construction plans differ from CSU design then the CSU design will take precedence over that plan. 4. Developer provides 30' of rigid or IMC conduit per riser for riser poles. CSU installs riser. 5. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. 6. If existing conduit is not suitable for use on current project the developer will furnish and install conduit as shown on CSU electrical layout. 7. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. 8. All conduit installation will be inspected by CSU representative before trench is covered. 9. Developer pours electric device pads or footings (i.e. transformers, pull boxes etc) per CSU specs and design. 10. Developer installs pull boxes and secondary pedestals per CSU specs and design (pull boxes and secondary pedestals provided by CSU). 11. Developer provides digital AutoCAD 2000 or later version of plat and / or site plan. Email to: q martinez(a_)cstx. A ov. 12. Developer provides load data to CSU as soon as it is available to avoid construction delays. Delivery time for transformers not in stock is approximately 40 weeks. 13. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformer(s), pull box(es), switchgear(s), meter location and conduit routing as designed by CSU. 14. To discuss any of the above electrical comments please contact Gilbert Martinez at 979.764.6255. Reviewed by: Gilbert Martinez Date: 01.04.2012