December 20, 2011
TO: Edsel G. Jones, via fax 979.696.3040� IVI
FROM: Matt Robinson, AICP, Senior Planner
SUBJECT: HOLIDAY PARK PH II (REZ)
I reviewed the above -mentioned REZONING application and determined it to be incomplete.
The following is the preliminary list of items needed to complete the submittal so that staff may
conduct a thorough review. Please submit the following information by 10 a.m. on any Monday
for review that week:
A PDD rezoning application. Since the requested rezoning is for a PDD, a PDD
application with all supporting documents (Rezoning Map and Concept Plan)
need to be provided.
Please be aware that if this application is not completed before February 13th, it will expire and
a new application and fees will be necessary to continue the rezoning process.
If you have any questions or need additional information, please call me at 979.764.3570.
cc: Ken Earl Havel, via email: earlhavel(@hotmail.com1Q) `NJ
Case file No. 11-00500201 'N
CITY OF COLLEGE STATION
Home of TexasA&M University'
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
February 10, 2012
TO: Edsel G. Jones, via fax 979-696-3040 f�)
FROM: Jason Schubert, AICP
Principal Planner
SUBJECT: HOLIDAY PARK PH II (REZ)
Thank you for the submittal of the requested documents for your REZONING application. This
project will be distributed to staff next week for their review.
cc: Earl Havel, via email; earlhavel@hotmail.com V-R
Case file no. 11-00500201
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
February 21, 2012 „\ � `t 4
TO: Earl Havel via email: earlhavel@hotmail.com ' / f)
FROM: Lauren A. Hovde, Staff Planner i J
SUBJECT: HOLIDAY PARK PH II -- Rezoning
Staff reviewed the above -mentioned rezoning as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address all comments and
submit the following information by Monday, March 5, 2012, 10:00 a.m., for your project to be
placed on the next available Planning & Zoning Commission (P&Z) meeting scheduled for April
5, 2012, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue:
One (1) 24"x36" copy of the revised Rezoning Map and Concept Plan;
Thirteen (13) 1 Vx17" copies of the revised Rezoning Map and Concept Plan;
One (1) copy of the written Metes and Bounds;
Revised application;
One (1) copy of the digital file of the revised rezoning Metes & Bounds on
diskette or e-mail to P&DS_Digital_Submittal@cstx.gov.
If all required items are not received, your project will be not be scheduled on the P&Z agenda.
Your project may be placed on a future agenda once all comments have been addressed and
the appropriate re -advertising fees paid. Please note that this application will expire in 90 days
from the date of this memo, if the applicant has not provided written response comments and
revised documents to the Administrator that seek to address the staff review comments
contained herein.
Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be
accessed at the following web site on Monday the week of the P&Z meeting,
http://www.cstx.gov/pz
If you have any questions or need additional information, please call me at 979.764.3570.
Attachments: Staff Review Comments
cc: Edsel Jones via postal mail/
Case file #11-00500201
1 of 6
STAFF REVIEW COMMENTS NO. 1
Project: HOLIDAY PARK PH II (REZ) — (11-00500201)
PLANNING
Please contact me at your convenience to schedule a facilitation meeting to discuss these
comments.
The following comments are regarding the submitted PDD application:
1. Question 3 Page 3: Please address the compatibility of the proposed PDD with the A-O
property to the southeast the M-2 property to the east.
2. Question 4 Page 3: Please address what makes this property suitable for the proposed
uses.
3. Questions 5 Page 3: Please address the suitability of this property for the uses allowed
under the current zoning.
4. Question 6 Page 3: Please clarify the reason that the uses allowed under A-O, C-3, and AP
are not marketable in this location.
5. FYI... Questions 3 and 4 on page 4 will need to be revised if meritorious modifications are
requested.
6. Question 5 Page 5: The nearby industrial uses are not mentioned in the response.
7. Question 7 Page 5: It appears that there should be a comma between "similar nature" and
,.agricultural'.
8. Question 9 Page 5: Please include information that reflects the addition of General Parkway
as mentioned in Engineering Comment #9.
9. Question 11 Page 6: Please include information that reflects the sidewalks mentioned in
Concept Plan Comment #7.
The following comments are regarding the submitted Concept Plan:
1. According to Section 8.2.G.2.a of the. UDO, the maximum block length in an area
designated as Urban on the Comprehensive Plan Lane Use and Character Map is 660
linear feet. The proposed block, even after the General Parkway addition (as mentioned in
Engineering Comment #9), may exceed this amount. In addition, a public street must be
projected to abutting unplatted property. If waivers are to be sought to these requirements,
they may be included as meritorious modifications in the PDD application. A meritorious
modification must to be accompanied by a community benefit. I will discuss this with you
further during the facilitation meeting. Ll 0 f �u fa/+'°fi
2. A 10-feet wide buffer and a fence will be required along the eastern and southeastern edges
of the property which abut the remaining A-O tracts. This buffer will be required to comply
with Section 7.6 of the Unified Development Ordinance (UDO).
3. Please show the bounds of the required buffers.
4. Spaces 35-37 are less than 15 feet from the recreational area.
5. Please show the bounds of each space to exhibit that each contains 1500 SF of area, that
there is a 10-foot setback between spaces, and that there is a 10-foot setback from the drive
aisles. Also, please distinguish that one parking space is provided within the space
6. Sidewalks will be required along Dowling Road and Holleman Drive at the time of platting.
Sidewalks must be shown on the Concept Plan. The sidewalk°fund option will be available
to request, if desired, for the sidewalk required along Dowling Road.
7. In reference to Engineering Comment # 9, the General Parkway right-of-way will also require
sidewalks and a 50-foot setback.
2of6
8. FYI... Right-of-way dedication will be required along Holleman, Drive at the time of platting.
9. Please label the 50-foot buffer as a 50-foot setback.
10. If the development is to be gated, please include this information and exhibit the bounds of
the fence and gate. Nok
11. The square footage of the recreational area should be 15% of the site. Please provide a
minimum square footage for the recreational area. This information can be added to the
Concept Plan as a note.
12. Please add a note that the site will be artificially lighting.
13. A key map must be added.
14. The title block needs to be amended to include the owner's name, phone number, and
address. It must also include the name of the project, Holiday Park II.
15. Please add a note regarding whether FEMA regulated floodplain exists on the property.
16. Each abutting property should be labeled with its current zoning information.
17. FYI... If the trees are proposed to remain, they must be barricaded according to City
standards prior to any'work on the site.
18. FYI ... Streetscaping and landscaping will be required at the time of site planning.
19. Please add a note stating that each space will be equipped with wastewater disposal,
electric, and access to public water.
20. Please add a note stating that the base zoning for the PDD is C-1 General Commercial.
21. Please add a note that quotes Section 6.32.1 of the UDO, "RV Parks shall allow the for
temporary occupancy of vehicles that are built on a single chassis that are designed to be
self propelled or permanently towable by a light duty truck and are primarily for use as
temporary living quarters for recreational, travel, or seasonal use. Also quote Section 6.3.Z.,
"RV Parks shall permit only seasonal placement and habitation of recreational vehicles. No
recreational vehicle shall remain in an RV Park for more than 120 days in any 12-month
period.
22. A note should be included that states the intended land uses which appear to include RV
Park and an accessory office.
23. A statement must be included that addresses the proposed drainage improvements.
The following comments are regarding the submitted rezoning map: _
1. Please identify the acreage of the A-O portion of the subject tract.
2. Each abutting property should be labeled with its current zoning information.
3. Please label Holleman Drive as a Major Collector.
4. Please show the bounds of Dowling Road right-of-way.
5. The title block needs to be amended to include the owner's, name, phone number, and
address. It must also include the name of the project, Holiday Park II.
Reviewed by: Lauren A. Hovde, Staff Planner Date: February 21, 2012
3of6
TxDOT Comments
1. No Comment. (off state system, no anticipated impact)
Reviewed by: Chad Bohne Date: February 16, 2012
GREENWAYS
1. No comments
Reviewed by: Venessa Garza, Greenways Program Manager Date: February 13, 2012
ENGINEERING COMMENTS NO. 1
1. Please illustrate all existing driveways and culverts along Holleman. Please label any
additional existing driveways and culverts to be removed by developer at the time of site
plan development, as only one driveway access off Holleman will be allowed with the
proposed development.
2. The public sanitary sewer main extended from Wellborn Road direction needs to be
extended as far as the Butler tract having frontage on Holleman Drive. The existing layout
appears to require off -site easements.
3. The sanitary sewer system internal to the site will need to be private and built to building
code standard, please label accordingly.
4. Please illustrate all existing public utilities surrounding the property.
5. Please illustrate how the RV Park will be metered (ie. individual meters, several master
meters or one overall master meter). All service lines beyond the meter are considered
private.
6. The water service lines should not "looped" back to the proposed mains.
7. The 8-inch public main off Holleman should be tied into your public water line loop. One
option might be to tap the 8-inch main off Dowling closer to the intersection at Holleman, run
a parallel line along Dowling, then along the eastern property boundary, pick up the existing
dead end fire hydrant line, then run down the southern property boundary and tie into
Holleman and avoid a duplicate parallel line along Holleman. Meters and hydrants could be
strategically located along this "public loop" in order to meter groups of RV sites off each
meter. All lines after the meters are private and should not be looped.
8. The southwest portion of the subject tract is encroached by a future thoroughfare that aligns
with Saddle Lane per the City's Thoroughfare plan. During platting the subject tract will be
responsible for the right of way dedication and construction of the subject thoroughfares
apron connection to Holleman Drive.
9. After platting and during site plan the following items will be required:
a. All documents required with Site Plan and Development Permit Application
Check Lists.
b. Engineer's Letter of Acknowledgement
c. Engineer's cost estimate
d. Plan and profile for all extension of public mains
e. Engineered fire flow report
f. Engineered drainage report and technical design summary
g. If the detention facility is proposed to discharge off site or changes the existing
sheet flow characteristics that currently exists, an off -site private drainage
improvements and easement would need to be secured in order to facilitate the
conveyance of the storm water discharge
h. Summary of domestic water and waste water demands
i. The subject tract is located in the Steeplechase -Wellborn Sanitary Sewer Impact
Fee Area
4of6
Reviewed by: Josh Norton
Date: February 17, 2012
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION
1. 20' easements along all exterior property lines.
2. Developer provides temporary blanket easement for construction purposes or provides
descriptive easements for electric infrastructure as designed by CSU for electric lines (where
applicable, including street lights)
3. Developer may be responsible for locating easements on site to insure that electrical
infrastructure is installed within easement boundaries.
GENERAL ELECTRICAL COMMENTS
1. Developer installs conduit per CSU specs and design.
2. CSU will provide drawings for electrical installation.
3. Developer provides 30' of rigid or IMC conduit for'riser poles. CSU installs riser.
4. Developer will intercept existing conduit at designated transformers or other existing devices
and extend as required.
5. If conduit does not exist at designated transformer or other existing devices, developer will
furnish and install conduit as shown on CSU electrical layout.
6. Developer pours electric device pads or footings (i.e. transformers, pull boxes etc) per CSU
specs and design.
7. Developer installs pull boxes and secondary pedestals per CSU specs and design (pull
boxes and secondary pedestals provided by CSU).
8. Developer provides digital AutoCAD 2000 or later version of plat and / or site plan. Email to:
wdavis@cstx.gov.
9. Developer provides load data to CSU as soon as it is available to avoid construction delays.
Delivery time for transformers not in stock is approximately 40 weeks.
10. Final site plan must show all proposed electrical facilities necessary to provide electrical
service, i.e. transformer(s), pull box(es), switchgear(s), meter location and conduit routing as
designed by CSU.
11. To discuss any of the above electrical comments please contact Weldon Davis at
979.764.5027.
Reviewed by: Weldon Davis
Date: February 17, 2012
FIRE
1. No combustibles will be allowed on site until all-weather roads and fire hydrants have been
accepted by the City.
2. A site plan shall not show any part of a structure over one hundred and fifty feet (150') from
an approved access road.
3. If a fire lane extends more than one hundred feet (100'), an approved turn -a -round or "T" will
be required.
4. No more than a six percent (6%) grade is allowed on any length of fire lanes.
5. Fire lanes will be constructed using the "Fire Apparatus Turning Radius Template" and have
a fire lane sign at the entrance. Curbs to be marked "Fire lane, No Parking, Tow Away Zone'
with a minimum of four (4") letters.
6. A "Knox Box" security key system is required on all buildings and a Knox Switch is required
on all gated entrances.
5of6
7. Commercial construction requires a fire hydrant within three hundred feet (300') from the
main entrance and within four hundred and fifty feet (450) from any part of a structure.
8. F.D.C. locations will be within one hundred and fifty feet (150') of a fire hydrant and located
on the "road side" of a structure.
9. Single fire access is limited to thirty (30) single-family residential units or one hundred (100)
multi -family residential units.
10. Minimum drive width has to be 20 foot wide for complete coverage of all RVs.
Reviewed by: Jerry Duffey Date: February 17, 2012
SANITATION
1. Sanitation is ok with this project.
Reviewed by: Wally Urrutia Date: February 15, 2012