Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Cost Estimate
Redmond Terrace Redevelopment • Engineer's Estimate June 2006 · · · !t!m Description Unit gl.!i!n!iU'. !Jnlt~2sl · Am2ant GENERAL ITEMS 1 Mobilization LS 1 $ 3,768.75 $ 3,768.75 2 Trench Safety LF 345 $ 2.00 $ 690.00 3 Erosion Control LS 1 $ 2,000.00 $ 2,000.00 Subtotal $ 6,458.75 SF 1010 $ 10.00 $ 10,100.00 eAVEMENT ITEMS 4 Pavement Repair Subtotal $ 10,100.00 ·SANITARY SEWER IJEMS 5 8" Sewer Plug EA 2 $ 250.00 $ 500.00 6 4" Sewer Plug EA 1 $ 175.00 $ 175.00 7 Grout Fill 8" Sewerline LF 175 $ 5.00 $ 875.00 8 Remove 8" Sanitary Sewer LF 95 $ 2.50 $ 237.50 9 8" PVC ASTM 03034 Gravity Sanita!)' Sewer with Structural Backfill LF 345 $ 38.00 $ 13,110.00 10 4' Standard Manhole Assembly EA 1 $ 3,000.00 $ a.000.00 . 11 Connect to Existing System EA 2 $ 2,000.00 $ 4,000.00. 12 Pumping EA 1 $ 3,000.00 $ 3,000.00 Subtotal $ 24,897.50 TOTAL $ ,1,456.25 -·~