Loading...
HomeMy WebLinkAboutLetter of AcknowledgementJanuary 26, 2012 Ms. Enka Bridges Graduate Engineer CITY OF COLLEGE STATION P.O. Box 9960 College Station, Texas 77842 RE: Tower Point Infrastructure, College Station, Texas Phase 12A, Lot 3, Block 2 Letter Acknowledging City Standards Dear Ms. Bridges: The purpose of this letter is to acknowledge that the construction plans for the public infrastructure for the above -referenced project, to the best of my knowledge, do not deviate from the B/CS Design Guideline Manual. Any alternate design or construction methodology that was used is listed below: (N/A) I also acknowledge, to the best of my knowledge, that the details provided in the construction plans are in accordance with the Bryan/College Station Standard Details. Sincerely, 30CIATES, INC. P:\23\2005\05040-12\Correspondence\Letters\Letter Acknowledging City Standards.docx. November 18, 2010 Ms. Erika Bridges Graduate Engineer CITY OF COLLEGE STATION P.O. Dox 9960 College Station, Texas 77842 RE: Tower Point Infrastructure, College Station, Texas Phase 12A, Lot 3, Rlock 2 Letter Acknowledging City Standards Dear Ms. Bridges The purpose of this letter is to acknowledge that the construction plans for the public infrastructure for the above -referenced project, to the best of my knowledge, do not deviate from the B/CS Design Guideline Manual. Any alternate design or construction methodology that was used is listed below: (N/A) I also acknowledge, to the best of my knowledge, that the details provided in the construction plans are in accordance with the Bryan/College Station Standard Details. Sincerely, WAt ER P. O RE AND ASSOCIATES, INC. K 'n PP. S Ivan, P.E. A sociate NRiRes18TBPE m gltratln No,56 PA23\2005\05040, i 2\Correspondence\letters\Letter Acknowledging City Standards.docx