Loading...
HomeMy WebLinkAboutCorrespondencePage 1 of 3 Date: May 12, 20 2 To: BEN McGARTY, PLANS REVIEWER BUILDING INSPECTIONS DEPARTMENT GOLLEGE STATION, TEXAS From: Wllllamson Group Archltects Subject: AERORT HEALTH AND WELLNESS - VALUE ENGINEERING MODIRGATIONS Project: Aeroflt Health and Wellness BEN: AFTER BIDDING THE AEROFIT AND IN ORDER TO GET THE PROJECT IN BUDGET, CF-RTAIN VALUE ENGINEERING ITEMS WERE REMOVED FROM THE PROJECT. THE DRAWINGS SUBMITTED FOR PERMITTING "DO NOT' INDICATE THE REMOVAL OF THESE ITEMS. IF YOU REMEMBER WE SUBMITTED FOR A BUILDING PERMIT ON 11/29/11 IN ORDER TO LOCK IN THE 2009 IBC AND THE TAS EFFECTIVE AT THAT DATE. THE PERMIT DRAWINGS SHOULD REFLEGT THOSE CODES. THE FOLLOWING LIST IS A DESCRIPTIVE NARRATIVE OF THESE ITEMS. 1) REFER TO DETAIL SHEET C3.1 - THE JOGGING PATH/ RUNNING TRACK COMPACTED BASE HAS BEEN REMOVED AND THE RUNNING TRACK WILL CONSIST OF 4" OF GRANITE FINES. ALL OTHER DETAILS FOR RUNNING TRACK REMAIN AS SHOWN ON DRAWING, 2) REFER TO LANDSCAPE SHEET 1- THE PAVERS INDICATED AT THE FRONT ENTRY HAVE BEEN REMOVED AND REPLACED WITH STANDARD SCORED CONCRETE. 3) REFER TO SHEET C3.1 - DUMPSTER SCREEN WALL INDICATED ATOP A CONCRETE RETAINING WALL/ FOOTING HAS BEEN CHANGED FROM BRICK TO SPLIT FACED GMU. ALSO SHOWN ON SHEET A4.0 4) REFER TO SHEET G1.2 DETAILS A,B AND G: THE RETAINING WALL AT THE REAR OF THE SITE IS SHOWN TO BE FACED WITH BRICK; SPLIT FACE GMU HAS BEEN SUBSTITUTED FOR THIS BRICK. 5) REFER TO SHEET A1.0- THE SCREEN WALL AT THE LOADING DOCK AND MECHANICAL AREA IS SHOWN TO BE A DOUBLE WYTHE BRICK WALL - SPLIT FACED GMU HAS BEEN SUBSTITUTED FOR THIS BRICK. (5) REFER TO LANDSCAPE DRAWINGS - COURTYARD AND TRELLIS LAYOUT SHEET 1 OF 1; COURTYARD DRAINAGE PLAN SHEET 1 OF 2; COURTYARD DRAINAGE DETAILS WII,b M(SON GROUP ARCHUCTS 100 East 26th Street, Bryan. Texas 77803 (v)979.775,1778 W LGRP@TXCYBER.GOM Page 2 of 3 SHEET 2 OF 2 AND COURTYARD LIGHTING SHEET 1 OF 1— THE WORK SHOWN ON THESE DRAWINGS WAS ELIMINATED FROM THE PROJECT. THIS WORK INCLUDES ALL WORK SHOWN ON COURTYARD PAVING, DRAINAGE, PLANTING, TRELLISWORK, SCREEN WALL, PLANTINGS AND LIGHTING: 7) REFER TO ITEM 6 ABOVE: THE ALUMINUM CANOPY HAS BEEN DELETED FROM THE EAST SIDE OF THE POOL AREA. THE CANTILEVERED AlLUM1NUM-CAtg0PY HAS BEEN DELETED FROM THE SOUTH SIDE OF THE POOL AREA. THESE HAVE BEEN REPLACED WITH ROD BRACED CANOPY COVERS OVER THE DOORWAYS LEADING TO THE POOL AREA BOTH EAST AND SOUTH SIDES OF THE POOL. 8) REFER TO SHEET A4.0- ALL CIRCULAR COLUMN COVERS HAVE BEEN CHANGED FROM CURVED ALUMINUM PANELS TO PAINTED GYPSUM FIBERGLASS REINFORCED CONCRETE CIRCULAR PRECAST COVERS WITH PAINTED FINISH. 9) FLOORING IN VARIOUS ROOMS HAS BEEN CHANGED TO VINYL PLANK FLOORING OR CARPET. 10) THE ELEVATOR SHOWN ON THE DRAWINGS IS SIZED FOR A HOSPITAL BED. THIS ELEVATOR HAS BEEN CHANGED TO A SMALLER SIZE CAB TO ACCEPT AN AMBULANCE STRETCHER. THE ELEVATOR CAB STILL COMPLIES WITH IBC 2009. 11) THE DRAWINGS INDICATED A CAST IRON PIPING FOR ROOF DRAINS. THE V.E. DELETED THE CAST IRON AND REPLACED IT WITH PVC. SINCE THIS BUILDING HAS A PLENUM RETURN AIR THE ONLY PVC WILL BE IN COLUMN WRAPS. THE EXPOSED PIPING IN THE PLENUM WILL REMAIN CAST IRON. 12) THE DRAWINGS INDICATED INSULATION ON ALL DOMESTIC GOLD WATER PIPING. THE V.E. REMOVED ALL THE DOMESTIC COLD WATER PIPE INSULATION EXCEPT AT EXTERIOR WALLS, 13) THE DRAWINGS INDICATED A D.D.C. CONTROL PACKAGE FOR THE HVAG SYSTEM. THIS HAS BEEN CHANGED TO A PROGRAMMABLE THERMOSTAT IN ALL HVAC ZONES. 14) THE DRAWINGS INDICATED VARIABLE FREQUENCY DRIVES ON ALL VAV BOXES. THIS HAS BEEN CHANGED TO ECM MOTORS. 15) THE DRAWINGS INDICATE AN ELEVATED LEVEL OF AESTHETIC CONSIDERATIONS ON ACGESSORIES ON THE FIRE SPRINKLER SYSTEM (IE: SPECIAL HANGERS, SPACING OF HANGERS -ETC). THIS WAS DUE TO THE FACT WE WANTED TO LEAVE OUT THE CEILING IN CERTAIN AREAS. WE SINGE HAVE PLACED A CEILING IN THESE AREAS AND THUS THE AESTHETIC CONSIDERATIONS OF THE EXPOSED FIRE SPRINKLER SYSTEM NO LONGER ARE REQUIRED. THESE CHANGES WILL BE SHOWN ON THE FIRE SPRINKLER SYSTEM SHOP DRAWINGS: THESE DRAWINGS W LLIAM80N GROUP APCHITECTB 100 East 26th Street, Bryan, Texas 77803 (v)979.775.1778 WILGRP@TXGYBER.GOM Page 3 of 3 WILL FULLY COMPLY WITH NFPA CODE REQUIREMENTS. 1G)THE FOLLOWING CHANGES WERE MADE TO THE ELECTRICAL SYSTEM. A) DELETE THE REQUIREMENT FOR CONCRETE ENCASED UNDERGROUND ELECTRICAL CONDUIT. B) CONDUIT SIZES WERE CHANGED FROM 3/4' TO 1/2' IN ALL LOCATIONS EXCEPT THE DATA CONDUITS IN THE 2 STORY BUILDING. C) WALL MOUNTED LIGHTING CONTROL SENSORS WILL BE USED IN LIEU OF CEILING MOUNTED SENSORS. D) STEPDOWN TRANSFORMERS INSIDE THE BUILDING WILL BE STANDARD IN LIEU OF K-RATED TRANSFORMERS. E) AN ALTERNATED LIGHTING PACKAGE HAS REPLACED THE LIGHTING FIXTURES IN THE SCHEDULE ON DRAWINGS. WHILE THESE CHANGES WERE NECESSARY, THEY IN NO WAY GOMPP-OM15E THE LIFE SAFETY STANDARDS OF THE BUILDING'S CODE COMPLIANCE. SHOULD YOU HAVE QUESTIONS, PLEASE CALL. THANKS LEON WILI-AM50N PROJECT ARCHITECT. 5/12/12 IMLL t1M SON GQOLV AQUITECTeS 100 East 20th Street, Bryan. Texas 77803 (v)979.775.1778 W LGRP@TXCYBER.G(