Loading...
HomeMy WebLinkAboutEngineer's Cost EstimateNovember 16, 2011 Mr. Josh Norton, P.E. City of College Station Engineering Department 1101 Texas Avenue College Station, TX 77842 Re: Engineer's Cost Estimate Brazos Fellowship Addition 226 Southwest Parkway East College Station, Texas Gessner Engineering Job No.: 11-0361 Dear Mr. Norton: Based on current estimations for direct material and direct labor costs, the prime cost of the public infrastructure for the above referenced project is estimated to be $2,822.00. Values used to determine this estimate are included in the attached table. This estimate does not include indirect costs due to overhead or indirect manufacturing expenses. Please contact us if you have any questions or if we can be of further assistance. Sincerely, GESSNE. N EERING, F-7451 —,�gOfTF 11 l Jere Peers, P.E., C.F.M. i II Or �4... j �.................. Gessner iP JEREMY N. PETERS / ...........................;...., Engineering ^ 2� f. 100217 i (s Kyle M. Zapalac, M.E., E.I.T. !CENSEaG���r� 1 SIONAI.E - 2501 A hlurd Drive ```��"� Suite 102 Attached: Estimated Cost Table College Station,'[exas 77840 CO. Box 10763,77842-0763 979.680.8840 FAX 979.680.8841 2204 S. Chappell Hill St. Drenham,"Iexas 77833 979.836.6855 FAX 979.836,6847 Probable Estimate of Public Sitework Construction Costs Brazos Fellowship Addition Gessner Engineering, LLC GE Job # 11-0361 SANI7ARl(SEWl;F2= -`;" , Item Quantity Units Unit Cost Total 6" Commercial Service 1 EA $ 1,000.00 $ 1,000.00 6" PVC SS 7 LF $ 45.00 $ 315.00 6" Cleanout 1 EA $ 1,500.00 $ 1,500.00 Trench Safety 7 EA $ 1.00 $ 7.00 Total $ 2,822.00