HomeMy WebLinkAboutLetter Acknowledging City StandardsNovember 16, 2011
Mr. Josh Norton, P.E.
City of College Station
1101 Texas Avenue
College Station, Texas 77842
Re: Letter Acknowledging City Standards
Brazos Fellowship Addition
226 Southwest Parkway East
College Station, Texas
Gessner Engineering Job No.: 11-0361
Dear Mr. Norton:
The purpose of this letter is to acknowledge that the construction plans for the
water, sanitary sewer, streets and drainage for the above -referenced project, to
the best of my knowledge, do not deviate from the B/CS Design Guideline
Manual. Alternate design or construction methodology that was used includes:
• The existing site features do not meet current B/CS Design
Guideline requirements.
I also acknowledge to the best of my knowledge, that the details
provided in the construction plans are in accordance with the
Bryan/College Station Standard Details.
Sincerely,
GESSNEF.,ENONEERING, F-7451
Jere/ rs, P.E., C.F.M. t*'�
i JEREMY N. PET;4 PETERS
RS R
�S ".......... .
I100217 i
Kyle M`. Zapalac, M.E., E.I.T. I'�131k ssj-. aSEN����-��
Gessner
Engineering
2501 Ashford Drive
Suite 102
College Station,Taas 77840
P.O. Box 10763, 77842-0763
979.680.8840
FAX 979.680.8841
2204 S. Chappell Hill St.
Brenham, Texas 77833
979.836.6855
FAX 979.836.6847