Loading...
HomeMy WebLinkAboutLetter Acknowledging City StandardsNovember 16, 2011 Mr. Josh Norton, P.E. City of College Station 1101 Texas Avenue College Station, Texas 77842 Re: Letter Acknowledging City Standards Brazos Fellowship Addition 226 Southwest Parkway East College Station, Texas Gessner Engineering Job No.: 11-0361 Dear Mr. Norton: The purpose of this letter is to acknowledge that the construction plans for the water, sanitary sewer, streets and drainage for the above -referenced project, to the best of my knowledge, do not deviate from the B/CS Design Guideline Manual. Alternate design or construction methodology that was used includes: • The existing site features do not meet current B/CS Design Guideline requirements. I also acknowledge to the best of my knowledge, that the details provided in the construction plans are in accordance with the Bryan/College Station Standard Details. Sincerely, GESSNEF.,ENONEERING, F-7451 Jere/ rs, P.E., C.F.M. t*'� i JEREMY N. PET;4 PETERS RS R �S ".......... . I100217 i Kyle M`. Zapalac, M.E., E.I.T. I'�131k ssj-. aSEN����-�� Gessner Engineering 2501 Ashford Drive Suite 102 College Station,Taas 77840 P.O. Box 10763, 77842-0763 979.680.8840 FAX 979.680.8841 2204 S. Chappell Hill St. Brenham, Texas 77833 979.836.6855 FAX 979.836.6847