Loading...
HomeMy WebLinkAboutDomestic Water ReportDecember 22, 2011 Mr. Stephen Maldonado Jr. City of College Station Water Services Department 1101 Texas Avenue College Station, TX 77842 Re: Domestic Water Report Brazos Fellowship Addition 226 Southwest Parkway East College Station, Texas Gessner Engineering Job No.: 11-0361 Dear Mr. Maldonado: The peak water demand was calculated in accordance with the 2009 International Plumbing Code, Tables E103.3(2) and E103.3(3). The additional fixture unit count of 191.25 was determined for this building, and values are shown below in Table One. Fixture Number Load Factor Total Value Water Closet 13 10 130 Urinal 3 10 30 Lavatory 10 2 20 Shower 1 4 4 Sink 1 4 4 Sink Service I 3 3 Drinkin Fountain 1 0.25 0.25 Total 191.25 Table One: Fixture Units The peak water demand (based on 200 fixture units) for the domestic service line and meter is 90 gallons per minute, and the average water demand is 22.5 gallons per minute. The existing building and proposed addition will be serve by the existing service and water meter. The existing meter and service is capable to serving the demand. Please contact us if you have any questions or if we can be of further assistance. Sincerely, GESSN EN NEERING, F-7451 Jer ters, P.E., C.F.M. Gessner Engineering 2501 Ashford Drive Suite 102 College Station,71exas 77840 P.O. Box 10763, 77842-0763 979.680.8840 FAX 979.680.8841 i b,,'. At 2204 S. Chappell Hill St. JEREMY N . ETE1S / ... '10021 7' ..Q".'' Brenham,7exas 77833 t -..!-CENS*! . ;.pr of979.836.6855 FAX 979.836.6847