Loading...
HomeMy WebLinkAboutStaff Comments(*t/4" CITY OF COLLEGE STATION Home ofTew A&M University' 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 i51 IPiG 0-Akol" October 6, 2011 IV I, I TO: RME Consulting Engineers, via email: rabon(o)rmengineer.com/ Cr FROM: Jason Schubert, AICP V Principal Planner SUBJECT: MDW CENTRE - DETENTION FACILITY (SP) Thank you for the submittal of your SITE PLAN application. This project will be distributed to staff next week for their review. cc: Bert Wheelers, Inc., via email: Garcia .mdwheelercompanies.com✓ Case file no. 11-00500156 ♦ 1101 Texas Avenue, P.O. Box 9960 F 1/ College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 CITY OF COLD iGH STATION HmnraJTnmAd.V Uninemiy MEMORANDUM October 13, 2011 10 � 1 TO: RME Consulting Engineers, via email: rabon()rmengineer.com C FROM: Matt Robinson, AICP, Senior Planner SUBJECT: MDW Centre - Detention Facility (SP) - Site Plan Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by any Monday at 10:00 a.m. for further staff review: City of College Station Transmittal Letter; Memo providing written responses to all of staff's comments (identify the specific page that each comment was addressed on or the reason for not addressing the comment); Two (2) revised site plans; One (1) landscaping plan; Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please contact Matt Robinson at 979.764.3570. Attachments: Staff review comments PC: Bert Wheelers, Inc., via email: garcia(a)mdwheelercompanies.cornv/ Case file #11-00500156 STAFF REVIEW COMMENTS NO. 1 Project: MDW Centre - Detention Facility (Sp)—11-00500156 PLANNING 1. Retaining walls over 6" in height are required to be treated so as to replicate stone, wood or other alternatives. Per sheets C2.1 and C2.2, it appears that the headwall is labeled to be solely concrete. Please revise. 2. Please add a note stating that when full development of the site takes place, the developer will be responsible for the extension of the sidewalk along Lincoln Avenue. 3. The following general notes were not included on the Site Plan, Landscape Plan or General Note section of the Construction Documents. Please add: Provide a general note on the site plan that all roof and ground -mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right-of-way or residential district within 150' of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance. Provide a general note on the site plan that states the following: Exterior building and site lighting will meet the standards of Section 7.10 of the Unified Development Ordinance. The light source shall not project below an opaque housing and no fixture shall directly project light horizontally. Fixtures will be mounted in such a manner that the projected cone of light does not cross any property line. Provide a general note that 100% coverage of groundcover, decorative paving, decorative rock (not loose), or a perennial grass is required in parking lot islands, swales and drainage areas, the parking lot setback, rights -of -way, and adjacent property disturbed during construction. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double -Check Back Flow Device, and installed as per City Ordinance 2394. • All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394, 4. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not be made of aware of will constitute a completely new review. Reviewed by: Matt Robinson LANDSCAPING/STREETSCAPING/BUFFER 1. It appears that some of the landscaping is being Red Lobster landscape plan. Any plantings tha Date: 10/13/11 t In the landscape schedule, it references 1 required street tree, yet none are being provided. Alternatively, upon full development of the site, streetscaping will be provided. Bicolor Iris is not on the approved plant list. Please revise Texas Lilac is considered a non -canopy tree. Please revise and provide additional canopy trees to meet the 50% point total requirement for canopy trees. Reviewed by: Matt Robinson Date: 10/13/11 ENGINEERING COMMENTS NO. 1 1. Please submit Letter of Acknowledgement from www.besunited.net 2. Please submit for building permit for all retaining walls to be constructed that are 24 inches or greater in height. Receiving this building permit is a requirement of site approval. 3. Please revise note on Sheet C1.0A, "Grout fill sump of inlet to flow line of new curb inlet', as it should state "existing" inlet. After further internal discussions the flow line modifications to the existing public inlet box should be done with reinforced concrete and not grout, please revise. 4. Please provide additional detail for the process of removing the existing 30 inch pipe and installing new 36 inch pipe. As the existing and proposed void are overlapping. In order to do this properly the 30 inch pipe needs to be removed and the entire 30 inch void needs to be repaired with reinforced concrete. Then the 36 inch void can be cut and the bottom of the inlet can be brought to the new flow line with reinforced concrete before the 36 inch connection. The concern is that the City may be left with an unreinforced repair on the back wall of the existing public inlet, where the 2 voids did not overlap. 5. (Sheet L1.1A) Please remove note referencing future driveway locations. Future access shall be determined at the time of site development. 6. (Sheet C1.2A) Please identify the water main conflicts with the proposed storm pipe removal and installation. It may also be helpful to illustrate this conflict in profile (Sheet C2.1). 7. As discussed in the drainage report, please identify the emergency spillway swell and rip -rap treatment on the construction documents. 8. Please expand on Section 3.5 of the drainage report explaining that the run-off rates from P1 are larger than previously thought and as a result the ultimate detention pond volume and allowable outfall flow were able to be decreased. 9. Please provide documentation and certification concerning permitting through the United States Corp of Engineers. If this project falls under a Nationwide Permit please specify which permit and how you are meeting its specific thresholds. In addition please identify if this project requires notification or further United States Corp of Engineers involvement. Reviewed by: Josh Norton Date: October 13, 2011 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979,764.3570 / Fax 979.764.3496 CITY 01; C0I.I1 Sd'. ST,rrION Hr,,,,Jn.a,A4bf cb,ro i,' MEMORANDUM December 28,2011 / TO: RME Consulting Engineers, via email: rabon(a)rmengineer.com✓ `) FROM: Matt Robinson, Senior Planner \V " SUBJECT: Mdw Centre - Detention Facility (Sp) - Site Plan Staff reviewed the above -mentioned site plan as requested. Please address the comments and submit the following information by any Monday at 10:00 a.m. for further staff review: City of College Station Transmittal Letter Four (4) complete sets of site civil construction documents for the proposed development with the revised site and landscaping plans attached (one set will be returned to you, please submit additional copies if you want more than one approved set) Two (2) revised site plans One (1) landscaping plan Building permit for retaining wall will need to be submitted prior to approval of the site plan. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764,3570, Attachments: Staff review comments / cc: Bert Wheelers, Inc., via email: Garcia@mdwheelercompanies.com V Case file #11-00500156 STAFF REVIEW COMMENTS NO. 2 Project: Mdw Centre - Detention Facility (Sp) - 11-00500156 PLANNING 1. FYI, the points for Knockout -Roses should be 330. 2. FYI, the total landscape points required for this phase is 999. 3. A building permit for the retaining wall will need to be submitted prior to approval of the site plan. 4. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. Reviewed by: Matt Robinson ENGINEERING COMMENTS NO. 2 Date: 12/28/11 1. Please provide note in plan and profile sheets (C1.2A & C2.1) pertaining to the treatment of the exposed concrete wall, as noted on Sheet C2.2. 2. Please identify the water main / storm conflict in plan view, Sheet C1.2A. Reviewed by: Josh Norton Date: 12/28/11