Loading...
HomeMy WebLinkAboutCost Estimate1 E 3 4 5 6 7 8 9 10 11 12 17 13 14 15 16 18 19 20 LAKERIDGE TOWNHOMES PH.2B PUBLIC INFRASTRUCTURE - PRELIMINARY COST ESTIMATE 1011412011 Water Line Items 8" PVC Waterline (AWWA C900 CL 200) structural backfill 690.66 LF $40.00 $27,626.40 6" PVC Waterline (AWWA C900 CL 200) in structural embedment 64.98 LF $30.00 $1,949.40 4" PVC Waterline (AWWA C909 CL 200) in structural backfill 234.14 LF $30.00 $7,024.20 8"x8" MJ Tee 2 EA $400.00 $800.00 8"x6" MJ Tee 3 EA $400.00 $1,200.00 8N4" MJ Tee 12 EA $300.00 $3,600.00 8" MJ Gate Valve 11 EA $800.00 $8,800.00 6" MJ Gate Valve 1 EA $750.00 $750.00 4" MJ Gate Valve 6 EA $500.00 $3,000.00 4" MJ Gate Valve with Locking Lid 6 EA $600.00 $3,600.00 8" MJ Plug w/ 2" Blowoff 2 EA $1,200.00 $2,400.00 6" MJ Plug w/ 2" Blowoff 1 EA $1,000.00 $1,000.00 4" MJ Plug 8 EA $200.00 $1,600.00 8"xl1.25deg MJ Bend 3 EA $400.00 $1,200.00 6"x22.5deg MJ Bend 1 EA $350.00 $350.00 4"xl1.25deg MJ Bend 1 EA $300.00 $300.00 1" Domestic Water Meter 4 EA $500.00 $2,000.00 Std. Fire Hydrant Assembly 2 EA $3,750.00 $7,500.00 Connection to existing system 2 EA $2,250.00 $4,500.00 Trench Safety 989.78 LF $1.00 $989.78 Total $80,189.78 City Inspection Fee (1.00% of construction cost) Totallnsp Fee $801.90