Loading...
HomeMy WebLinkAboutCompliance LetterMITCaHE�LL MORGAN September 19, 2011 Erika Bridges City of College Station Planning and Development Services P.O. Box 9960 College Station, TX 77842 Re: Lakeridge Townhomes Ph. 2B(SP) — Water, Sewer & Drainage Compliance Letter Dear Erika, Wafer Phase 2B was designed in accordance with the overall waterline design for the Lakeridge Townhomes. The fire flow report previously submitted with Phase 1A dated January 2010 anticipated the construction of Phase 2 and models a fire flow of 1500 gpm at Building 18 and maintains adequate velocity and pressure within the system. The original Phase 2 is now being split into Phase 2A and 2B. Because of this split, the original loop for Phase 2 will be completed in Phase 2B. Exhibit 8, attached, shows the original loop that will be constructed with the Phase 2 project (Line 4027 around to line 4019). The Phase 2B modeling run completes the loop at line 4022 and 4027. With a fire flow of 1500 gpm on node 59322, the maximum velocity occurs in line 4000 and is 5.9 fps and the minimum pressure is 70 psi occurring at node 59322. This pressure and velocity in the system meets the minimum design standards. Exhibit 9 attached is the Average Day Run with Phase 2B complete. All waterlines for Phase 2B were designed in accordance with the City of College Station Unified Development Standards. Sewer Phase 2B was designed in accordance with the overall sanitary sewer design for the Lakeridge Townhomes. A master sewer layout was designed for the entire project and Phase 2B is following that layout, sizing and depth. Drainage Similarly Phase 2B was designed in accordance with the overall drainage design for the Lakeridge Townhomes. The detention pond and storm sewer system within Lakeridge was sized for ultimate development which included Phase 2B. There is one new storm sewer system being constructed with Phase 2B and we have attached the inlet sizing, HGL calculations and drawings for that system. All impervious cover being constructed within Phase 2B was accounted for in the overall drainage report for Lakeridge Townhomes dated January 2010. As seen on the attached Exhibit 6.1, the HGL's have been calculated for both the 10 and 100 year storm events. These HGL's can also be seen on the storm sewer plan & profile sheet also attached. Exhibits 7.1 and 7.2 illustrate the sizing of the storm inlets and grate inlet. Both IN24 and IN25 are sized as 5 foot inlets and have less than 8" of ponded depth at the inlet during a 100-year storm event. The grate inlets, GT29, GT29A and JB30, are sized as an EJIW V5728 511 UNIVERSITY DRIVE EAST, SUITE 204 • COLLEGE STATION, TX 77840 • T. 979,260.6963 • F. 979.260.3564 CIVIL ENGINEERING • HYDRAULICS HYDROLOGY UTILITIES • STREETS • SUE PLANS. • SUBDIVISIONS info@mitchellandmorgan,com w .mitchellandmorgan.com with 2.57 sq in of open area which allows only .82', 0.62' and 1.03' respectively of ponded depth over the inlet during the 100-year storm event. have any questions or comgpVtlfxb�jLfeel free to call our office at 979-260-6963. 77689 Veronica Ay. Mo P.E., naging MaPartne Cc: File EXHIBIT 8 Analysis Type: Steady State Project Description: Peak Day Conditions, Phase 2 complete, Fireflow of 1500 gpm on Node 59322 59326 EXHIBIT 8 Time Level: 0; 0 day 0:00 in Number of Junctions: 25(Selection) Junction ID Flevation Demand Grade Pressure [ft] ( ]BPm] (ft] (psi) ( r-- -- -I 35312 308.000 0.000 494.507 80.814 t _ 59301 0.000 494.094 80.634 ^�308.000 59302 _ 311.000 5.650 492.299 78.557 59303 - ( 309.000 0.000 -- 492.303 �79.425 5-930 f 308.000 ( 6.680 492.620 79.996 59305 309.000 0.000 491.926 79.262 r- - 59306 310.000 6.680 (490.226 78.092 r- - 59307 1 314_000 11.820 487.782 75.300 _ 59308 (314.000 (11.820 �487.755 75.288 59309 ( 315.000 0.000 487.715 74.837 _ 59310 ( 315.500 0.000 487.688-� 74.609 r 59311 316.500 0.000 1487.667 74.167 E _59- 312 317.750 6 680 488.426 73.954 59313 1312.000 ( 0_000 ( 490.991 77.557 59314 309.000 �0.000 492.102 79.338 59318 317.000 0.000 ( 484.844 72.727 59320 1314.500- 13.360 486.406 74.487 59321 317,500 0000 484.844 72.510 59322 319.500 1500.000 482.748 70.735 59323 318.000 0.000 483.986 71.922 59324 318.000 16.440 485.106-� 72.407 59325 318.250 0.000 485.925 i ( 72.653 59326 318.500 0.000 I486.347I72.728 59334 314 875 i 13 360 489.785 75,788 - 59335 i 318.500 ( 6.680 483.792 71.621 EXHIBIT 8 Results -Pipes Number of Pipes: 26(Selection) Pipe ID ( Node 1 Node 2 Diameter Length Roughness l Flow Velocity Headloss [in] [ftl [millift] [gpm] [ft/s] [it] 3997 35312 [59301 12.000 68.370 130.000 1599.170 4.537 0.413 3998 �59302 ( 59303 4.000 140_322 140.000 _5.650 -0.144 0004� 3999 1 59303 59301 1 8.000 234.743 �140.000 I-672.077 4.290 ( 1.791 4000 59301 1 59304 8.000 �106.460 140.000 927.093 [5.917 1.473 4001 ( 59304 159305 1 8.000 1 50.825 1 140.000 920.413 5.875 1 0.694 4002 �9305 59306 8.000 �124.542 140.000 920.413 1 5.875 T1.701 4003 159306 59307 8.000 �181.383 140.000 913.733 5.832 2.444 4004 59307 59308 8.000 59.338 140.000 144.472 0.922 0.026 4005 159308 59309 8.000 107.870 140.000 132.652 0.847 0.041 4006 59309 59310 1 8.000 1 71.557 140.000 132.652 0.847 0.027 4007 159310 I59311 18.000 54.617 140.000 132.652 10.847 0.021 4008 59311 59312 8.0007106.905 1 140.000 F-646 387 4.126 0.759 009 59312 �59334 �8.000 1 187 883 1 140.000 1-653.067 1 -4.168 1-359 4010 59313 1 59314 8.000 147.907 140 000 -666 427T 4.254 11.111 - 4011 �59314 - �59303 1 8.000 26.817 140.000 1 666.427 J4.254 0.201 I 4019 , 59307 (59320 8.000 ( 144.4961 140 000 757.440 1 -1 4.835 �1.375 III 4020 59320T9321 8000 169.613 (140.000 744.081 (4.749 11562 �- - 4021 1 59321 59318 �8.000 r 53.777 1 140.000 -0.000 - 1-0.0000 0.000 4022 �59321 (59335 _- 1 8 000 __- 114.189 -- 140.000 4.749- 1.052 4023 1 99322 59323 �8.000 1 128.439 140.000 r�744.081 1-762.599 �4.868 1 1.238 __. 4024 59323 59324 8.000 116.150 140.000 762 599- 4.868 L 120 4025 59324 59325 8.000 81.659 140.000 -779 039 -4.972 0.819 4026 159325 ( 59326 ( 8.000 42.083 1 140.000 1 779.039 -4.972 0.422 r4027 59326 1 59311 1 8.000 131.660 1 140.000 -779 039 1 _4.972 1.320 4037 59334 59313 8.000 160.626 140.000 666.427 1 4.254 1.206 4038 59335 59322 8.000 r 115.267 140.000 737 401 4.707 1.044 EXHIBIT 8 EXHIBIT 9 Analysis Type: Steady State Project Description: Average Day Conditions, Phase 2 complete 59326 EXHIBIT 9 Time Level: 0; 0 day 0:00 hr Number of Junctions: 25(Selection) Junction ID I Elevation ( Demand Grade Pressure [ft] ( IZ;pm] IN [Psil 35312 ) 308.000 0.000 ( 499.310 82.894 C 59301 _ 1308.000 0.000 , 499.307 ( 82.893 - 59302 - - - 311.000 15 650 - -- 499.292 ( 81.587 59303 309.000 0.000 499.296 82.455 308.000 6.680 499.299 82.890 59305 - , 309.000 -�59304 0.000 ( 499.296 ( 82.455 f 59306 - ( 310.000 6.680 - 499.288 82.019 59307 314 00-0 ( 11 820 ( 499 280 1 80.282 59308 T --- 314 000 11.820 �499.280 - 80.282 59309 315.000 0.000 ( 499.280 79.848� r59310 315.500 0.000 499.280 179.632 59311 - ) 316.500 0.000 499.280 79.198 59312 ) 317.750 �6.680 -� 499.281 1 78.657 59313 312.00�000 499.290 81.153 i 59314 309.000 ) 0_000 499.295 82.455� 59318 317.000 0.000 -� 499.278 78.981 59320 -- 314.500 13.360 - T 499.278, - 80.064 J 59321 ( 317.500 0.000 499.278, 78-764 59322 -� 319.500 �0.000 499.278 77.898 59323 318 000 1 0.000 499.278 ) 78.548 59324 318.000 16.440 499.278 78.548 59325 1318.250 0.000 499.278 .) 178.440- 59326 318.500 ( 0.000 499.279 78.331 59334 314.875 13.360 499.284 79.904 59335 --- 318.500 6.680 - 499.278 78.331 ' EXHIBIT 9 Number of Pipes: 26(Selection) Pipe ID Node 1 (Node 2 Diameter Length Roughness l Flow Velocity Headloss [in] [ft] [nulhft] [gpm] [ft/s] ( [ft] �I 3997 35312 59301 12.000 68.370 130.000 99.170 0.281 0.002 3998 �59302 59303 4.000 140 322 140.000 5.650 0 144 J0.004 3999 59303 59301 8 000 234.743 140.000 -43.182 -0.276 0.011 4000 59301 59304 1 8.000 1 106.460 140.000 55.988 0.357 0.008 4001 ( 59304 ] 59305 8.000 50.825 140.000 49.308 0.315 0.003 4002 ( 59305 1 59306 8.000 124.542 140.000 49.308 0.315 0.008� - 4003 59306 59307 8.000 161.363 140.000 42.628 0.272 0.008 4004 59307 59308 8000 (59.338 140.000 10.445 0.067 0.000 4005 r59308 �59309� 8.000 107.870 140.000 j-1.375 -0.009�0.000 4006 59309 T59310 8.000 T71.557 140.000 (-1.375 -0.009 III 0.000 4007 59310 59311 8.000 54.617 140.000 ( -1.375 0.009 0.000 4008 59311 59312 8.000 106.905 140.000 -17 492 0 112 0.001 4009 59312 99334 8.000 187.883 140.000 -24.172 -0.154 0.003 4010 59313 59314 1 8.000 147 907 140.000 37.532 0.240 0.005 4011 59314 ( 59303 8.000 26.817 140. 000 37.532 0.240 0.001 4019 59307 59320 ( 8.000 144.496 �140.000 20.363 III 0_130 �0A02 4020 59320 ( 59321 1 8.000 169.613 140.000 7.003 0.045 0.000 4021 59321 59318 8.000 53.777 140.000 0.000 0.000 0.000 - 4022 j5932� 59335 8.000 114.189 1 140.000 7.003 - 0045 �0.000 4023 59322 59323 1 8.000 128.439 140.000 0.323 0 002 0.000 4024 59323 �9324 8.000 116.150 140.000 (0.323 0_002 0 000 4025 159324 59325 8.000 81.659 140.000 16.117 -0.103 0.001 4026 -- 59325 1 59326] 8.000 42.083 I ( 140.000 -16.117 0.103 �0.000 4027 59326 59311 8.000 ( 131.660 140.000 -16.117 -0.103 ( 0.001 4037 159334 4037 59334 59313 8.000 160.626 140.000 -37.532 -0.240 0.006 4038 59335 59322 8.000 T 115_267 1 140,000 0_323 0.002 0.000 EXHIBIT 9 hi) adid � 3 "" , weansumoa MMMM le IDH ^M.M M. (ll).`. Mazm�rnw;;ar adid weeilsdn le lOH (11) waaJiSUMOO 1m N N N O Ip ; im N V m m O t,. b g i d e a JeWJON Aq IJH v ($) WeaJlSdn O ;v N 0) O) r n 4ldea a6 V V IeWJoN Rq IE)H (il) WealleUMOQ [O Aq -10H (ll) weaJisdp .?, (q l It o m c1q r� tq s,auluuuW v+vi 6q I0H --rwi�� Ill) o gldap 19WJON lil) sso]peaH M M rn M r •... V t0 M O lfJ s,auluueW_. '3 �'000000 �O edols uonopd ''o 0 o O o o„ o "rmmr (SIO):. edid Jed mold (ui) iawe Ja �Q v '•+ o 0 0 a -,iNNMmMM,;.N 4-t000000��:o ','00000 '^O c- �000000 o ,>�M�Maomr • u� N O) N m �.;. N (u) glaual Ol0 � V (ll) WeaJISUMOO N OJ `' V c'i r N O N d' M � OJ "," ai edid 7d-'. m P' O V N f0 N M'; V (il) weaJi9dp v a d l d l j M M M (9 M M M 683 WiZ q�LLLLLL LLLLO ULL Q— — — — �� Q luawaas add y — y: MNN N >:M d=ZZN y LL LL. 0Zm LL IL LL tiZ y It O3 y y EXHIBIT 7.1 LAKERIDGE TOWNHOMES PHASE 2B INLET CAPACITY 10-YEAR STORM IN24 IN31 Q = 4.60 cfs Q = 3.40 cfs clog = 10% clog = 10% Q clogged = 5.06 cfs Q clogged = 3.74 cfs y = 0.83 ft y = 0.83 ft L= 223 ft L= 1.65 ft SUMP CURB: Q = 3.0*L*y^1.5 L= Q/(3.0*y^1.5) GT29 GT29A Q = 2.80 cfs Q = 2.10 cfs clog = 25% clog = 25% Q clogged = 3.5 cfs Q clogged = 2.625 cfs h = 0.50 ft h = 0.50 ft Req. Open Area= 0.82 ft2 Req. Open Area= 0.82 ft2 SUMP GRATE M r _ >(10_.Year rn)777777 JB30(Temp grate) Q = 3.50 cfs clog = 25% SUMP GRATE., Q clogged = 4.375 cfs Q = 4.82*A*h^0.5 h = 0.50 ft A = Q/(4.82*y^0.5) Req. Open Area= 1.03 ft2 Note* Recessed inlets curb opening = Height of curb +depression y = 6"+4"=equal 10" EXHIBIT 7.2 LAKERIDGE TOWNHOMES PHASE 213 INLET CAPACITY 100-YEAR STORM WSE IN24 IN31 Q = 6.60 cfs Q = 4.90 cfs clog = 10% clog = 10% Q clogged = 7.26 cfs Q clogged = 5.39 cfs Chosen L= 5.00 ft Chosen L= 5.00 ft Flowline= 317.67 ft Flowline= 319.48 ft Y = .; :762 ft y= 0ft 51 WSE= 318.28 ft WSE= 319.99 ft SUMP GRATE „v; r ,;,{100 Year.";Storm) =,,_„ GT29 GT29A Q = 4.10 cfs Q = 3.10 cfs clog = 25% clog = 25% Q clogged = 5.13 cfs Q clogged = 3.88 cfs Inlet Selected= V5728 Inlet Selected= V5728 Open Area Open Area Selected= 2.57 ft2 Selected= 2.57 ft' T/G= 319.13 ft T/G= 319.09 ft h= 0.17ft h= -0.10ft WSE= 319.30 ft WSE= 319.19 ft (100Year=Storm) J1330(Temp grate) Q = 5.10 cfs clog = 25% Q clogged = 6.38 cfs Inlet Selected= V5728 Open Area Selected= 2.57 ft2 T/G= 318.45 ft In = 0.26 ft WSE= 318.71 ft Note* SUMP CURB: Recessed inlets curb opening = Q = 3.0*L*yA1.5 Height of curb +depression L= Q/(3.0*yA1.5) y = 6"+4"=equal 10" SUMP GRATE: Q = 4.82*A*hA0.5 A = Q/(4.82*yA0.5) October 17. 2011 Erika Bridges City of College Station Planning and Development Services P.O. Box 9960 College Station, TX 77842 Re: Amended Lakeridge Townhomes Ph. 2B(SP) — Water, Sewer & Drainage Compliance Letter Dear Erika, Water Phase 2B was designed in accordance with the overall waterline design for the Lakeridge Townhomes. The fire flow report previously submitted with Phase 1A dated January 2010 anticipated the construction of Phase 2 and models a fire flow of 1500 gpm at Building 18 and maintains adequate velocity and pressure within the system. All buildings will be constructed as TYPE V-B construction with an automatic fire sprinkler system and the largest building requires a fire flow of 1500 gpm. The original Phase 2 is now being split into Phase 2A and 2B. Because of this split, the original loop for Phase 2 will be completed in Phase 2B. Exhibit 8, attached, shows the original loop that will be constructed with the Phase 2 project (Line 4027 around to line 4019). The Phase 2B modeling run completes the loop at line 4022 and 4027. With a fire flow of 1500 gpm on node 59322, the maximum velocity occurs in line 4000 and is 5.9 fps and the minimum pressure is 70 psi occurring at node 59322. This pressure and velocity in the system meets the minimum design standards. Exhibit 9 attached is the Average Day Run with Phase 2B complete. All waterlines for Phase 2B were designed in accordance with the City of College Station Unified Development Standards. Sewer Phase 2B was designed in accordance with the overall sanitary sewer design for the Lakeridge Townhomes. A master sewer layout was designed for the entire project and Phase 2B is following that layout, sizing and depth. Drainage Similarly Phase 2B was designed in accordance with the overall drainage design for the Lakeridge Townhomes. The detention pond and storm sewer system within Lakeridge was sized for ultimate development which included Phase 2B. There is one new storm sewer system being constructed with Phase 2B and we have attached the inlet sizing, HGL calculations and drawings for that system. All impervious cover being constructed within Phase 2B was accounted for in the overall drainage report for Lakeridge Townhomes dated January 2010. 511 UNIVERSITY DRIVE EAST, SUITE 204 COLLEGE STATION, TX 77840 • T. 979.260.6963 • E. 979.260.3564 /1l CIVIL ENGINEERING • HYDRAULICS HYDROLOGY MILMES • STREETS • SITE PLANS • SUBDIVISIONS \1 " Ili info@mitchellandmorgan.com w .mitchellandmorgan.mm As seen on the attached Exhibit 6.1, the HGL's have been calculated for both the 10 and 100 year storm events. These HGL's can also be seen on the storm sewer plan & profile sheet also attached. Exhibits 7.1 and 7.2 illustrate the sizing of the storm inlets and grate inlet. Both IN24 and IN25 are sized as 5 foot inlets and have less than 8" of ponded depth at the inlet during a 100-year storm event. The grate inlets, GT29, GT29A and J1330, are sized as an EJIW V5728 with 2.57 sq in of open area which allows only .82', 0.62' and 1.03' respectively of ponded depth over the inlet during the 100-year storm event. If you have any questions or comments, please feel free to call our office at 979-260-6963. Veronica J.B. r an, �E , C.F.M. .�nyri�na,ts. Managing Parther U �y9`• 77 Cc: File