HomeMy WebLinkAboutStaff Comments1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM September 22, 2011 TO: Joe Gattis, PE, GATTIS Engineering, via email: ioeCaDgattisengineering.com� FROM: Jason Schubert, AICP Senior Planner SUBJECT: CORNERSTONE APARTMENTS (REZ) I reviewed the above -mentioned REZONING application and determined it to be incomplete. The following is the preliminary list of items needed to complete the submittal so that staff may conduct a thorough review. Please submit the following information by 10 a.m. on any Monday for review that week: Proof of authority for Greg Jasper to sign the zoning application on behalf of the Jasper Construction, Ltd. Please be aware that if this application is not completed before November 14, 2011, it will expire and a new application and fees will be necessary to continue the rezoning request process. If you have any questions or need additional information, please call me at 979.764.3570. cc: Jasper Construction, Ltd., via email: gregiasper@verizon.net V Case file No. 11-00500146 CITY OF COLLEGE STATION Home ofTew A&M UniveniV' 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764,3570 / Fax 979.764.3496 MEMORANDUM October 3, 2011 / TO: Joe Gattis, PE., Gattis Engineering, via email: ioe(o)gattisenaineerinp.com V FROM: Jason Schubert, AICP Principal Planner SUBJECT: CORNERSTONE APARTMENTS (REZ) Thank you for the submittal that completes your REZONING application. This project will be distributed to staff this week for their review. cc: Greg Jasper, Jasper Construction, Ltd.; via email: oregjasper()a verizon.netf Case file no. 11-00500146 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM October 10, 2011 TO: Joe Gattis, PE, Gattis Engineering via email: joe@gattisengineering.co m FROM: Lauren A. Hovde, Staff Planner SUBJECT: 4050 HOLLEMAN DR SOUTH (REZ) — Rezoning Staff reviewed the above -mentioned rezoning as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address all comments and submit the following information by Monday, October 17, 2011, 10:00 a.m., for your project to be placed on the next available Planning & Zoning Commission (P&Z) meeting scheduled for November 3, 2011, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue: One (1) 24"x36" copy of the revised Rezoning Map; Thirteen (13) 11"x1 T copies of the revised Rezoning Map; One (1) copy of the digital file of the revised rezoning Metes & Bounds on diskette or e-mail to P&DS_Digital_Submittal@cstx.gov. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If all required items are not received, your project will be not be scheduled on the P&Z agenda. Your project may be placed on a future agenda once all comments have been addressed and the appropriate re -advertising fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.gov/pz If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff Review Comments PC: Greg Jasper, Jasper Construction, Ltd. via email: gregjasper@verizon.net Case file #11-00500146 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 1 of 2 STAFF REVIEW COMMENTS NO. 1 Project: 4050 HOLLEMAN DR SOUTH (REZ) — (11-00500146) PLANNING 1. On the rezoning map, please revise the abutting properties to show their current zoning district. Each abutting property, except Great Oaks is zoned A-O Agricultural -Open. 2. Also, the owners of the property across Holleman to the northeast appear to now be John Daniel German and Barbara Joyce Hogan. 3. Please add the applicant's name to the rezoning map. 4. The following comments are for the application: 1. Question 1: There is no existing multi -family in the area currently. Townhouses are considered to be attached single-family uses. The information provided for this question relates to future changes, but the question is asking about what changes have already occurred. 2. Question 3: Townhouses are a single-family use. 3. Question 4: Please explain why the proposed use is suitable to the site. This is where it is appropriate to discuss the site characteristics and surrounding uses (not multi -family). Mentioning the right-of-way dedications, as shown, is appropriate, but more information is needed. 5. As previously mentioned during the Pre -Application Conference on August 10, 2011, Staff is concerned with the density that R-6 would allow on the subject property which is bordered to the west and south by the Restricted Suburban land use designation. Please provide an estimate of the proposed density so that the proposal may be better evaluated. Reviewed by: Lauren A. Hovde, Staff Planner Date: October 10, 2011 To make the November 3rd P&Z Commission meeting, public notice must be ready by October 12th. Please inform me as soon as possible if you intend to make this meeting so that ads can be prepared for public notice of the rezoning and public hearing. ENGINEERING COMMENTS NO. 1 1. FYI - The subject tract is located just south of a 12-inch sanitary sewer main as it crosses Holleman Drive and heads east, this main gravity flows into the Bee Creek Trunk Line. This respective trunk line's sub -basin currently serves many developments along FM2818, from areas east of Wellborn Road, to the Carters Creek Wastewater Treatment Plant. Much of the existing trunk line was constructed in 1973 and was shown to have several surcharging line segments in the 2011 HDR Sanitary Sewer Collection System Master Plan Update. The City is currently in the process of initializing a capital improvement project in anticipation of the ultimate build -out demand anticipated for the subject sewer shed area. 2. FYI - The subject tract is located within the Wellborn Water service area. Future platting and development of the tract will have to provide adequate fire flow to support the proposed use. 3. FYI - Development of the subject tract will be required to mitigate post development flows and follow the BCS Storm Water Design Guidelines. 4. FYI - Per the City's thoroughfare plan there is a 2 Lane Minor Collector which is proposed along the northern property boundary of this property. Reviewed by: Josh Norton Date: October 7, 2011 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 2 (*t1"" CITY OF COLLEGE STATION Planning d Uenelopmmtit Set vice, 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM December 19, 2011 TO: Joe Gattis, via email; 'oe t @gattisengineering.com FROM: Josh Norton SUBJECT: Engineering Document Comments for Cornerstone Apartments (REZ) Staff reviewed the above -mentioned engineering documents as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by Monday, DATE, at 10:00 a.m. for further staff review and approval of the plans: One (1) set of revised construction documents. Please note that the Development Permit Balance (Public Infrastructure Review and Inspection Fee), will be calculated and requested once the construction documents and engineer's estimates have been reviewed and approved. If you have any questions or need additional information, please call Josh at 979.764.3570. Attachments: Staff review comments PC: Greg Jasper, Jasper Construction, Ltd. Via email; gregjasper@verizon.net tl ' Case File No. 11-00500146 ENGINEERING COMMENTS NO. 2 2. 3. El FYI - The subject tract is located just south of a 12-inch sanitary sewer main as it crosses Holleman Drive and heads east, this main gravity flows into the Bee Creek Trunk Line. This respective trunk line's sub -basin currently serves many developments along FM2818, from areas east of Wellborn Road, to the Carters Creek Wastewater Treatment Plant. Much of the existing trunk line was constructed in 1973 and was shown to have several surcharging line segments in the 2011 HDR Sanitary Sewer Collection System Master Plan Update. The City is currently in the process of initializing a capital improvement project in anticipation of the ultimate build -out demand anticipated for the subject sewer shed area. FYI - The subject tract is located within the Wellborn Water service area. Future platting and development of the tract will have to provide adequate fire flow to support the proposed use. FYI - Development of the subject tract will be required to mitigate post development flows and follow the BCS Storm Water Design Guidelines. FYI - Per the City's thoroughfare plan there is a 2 Lane Minor Collector which is proposed along the northern property boundary of this property. Reviewed by: Josh Norton Date: December 19, 2011