Loading...
HomeMy WebLinkAboutStaff Report(*t/q" CITY OF COLLEGE STATION PRELIMINARY PLAN for Cedar Creek Plaza 11-00500151 SCALE: 1 lot on 7.245 acres and a 0.119 right-of-way dedication LOCATION: 2862 Graham Rd N ZONING: PDD Planned Development District APPLICANT: Cedar Creek Group, LLC PROJECT MANAGER: Jason Schubert, AICP, Principal Planner jschubert@cstx.gov RECOMMENDATION: Approval Planning & Zoning Commission Page 1 of 4 November 3, 2011 Planning & Zoning Commission Page 2 of 4 November 3, 2011 DEVELOPMENT HISTORY Annexation: Zoning: Site development: COMMENTS Water: 2002 A-O Agricultural Open (upon annexation); PDD Planned Development District (August 2011) Vacant Water service will be provided by Wellborn Special Utility District. The water system will be required to be designed in accordance with the BCS Unified Design Guidelines. Sewer: Sanitary sewer lines are proposed to be extended with site development to tie into an existing 12-inch wastewater main along Rock Prairie Road. The sanitary sewer system will be required to be designed in accordance with the BCS Unified Design Guidelines. Off -site Easements: A public utility easement north of the property will be required for the sanitary sewer main extension. Drainage: Drainage is generally to the southwest within the Hopes Creek Drainage Basin. Flood Plain: There is no FEMA regulated floodplain on the property. Greenways: N/A Pedestrian Connectivity: A 6-foot sidewalk is proposed within a Public Access Easement along N. Graham Road. The Public Way proposed across the property includes 5-foot sidewalks on each side. Bicycle Connectivity: No bicycle facility is proposed though it is anticipated that bicycle lanes will be located along N. Graham Road when it is expanded to current standard in the future. Streets: N. Graham Road is classified as a 2-lane Major Collector on the Thoroughfare Plan, though it is currently constructed to a rural roadway section. Approximately 10 feet of right-of-way is proposed to be dedicated along N. Graham Road to help accommodate its future expansion. In lieu of a public street, a Public Way is proposed to break block length. The Public Way will develop with the site and will be extended to connect N. Graham Road and Rock Prairie Road West across this tract and the property to the northwest. Oversize Request: N/A Parkland Dedication Fees: No parkland dedication is required or proposed with this development. Planning & Zoning Commission Page 3 of 4 November 3, 2011 Impact Fees: The subject property is located within the Steeplechase -Wellborn Sanitary Sewer Impact Fee Area. REVIEW CRITERIA 1. Compliance with Comprehensive Plan and Unified Development Ordinance: The subject tract is designated as Business Park on the Future Land Use and Character Map in the Comprehensive Plan and is located along N. Graham Road, a 2-lane Major Collector on the Thoroughfare Plan. A PDD Planned Development District rezoning with concept plan was approved in August 2011 for this tract in which uses and other development standards were negotiated in relation to the Business Park designation. The proposed Preliminary Plan also complies with Comprehensive Plan in providing additional right-of-way for N. Graham Road and adheres to the PDD Planned Development District and associated concept plan. 2. Compliance with Subdivision Regulations: The proposed Preliminary Plan is in compliance is in compliance with the Subdivision Regulations contained in the Unified Development Ordinance. STAFF RECOMMENDATION Staff recommends approval of the Preliminary Plan. SUPPORTING MATERIALS 1. Application 2. Copy of Preliminary Plat (provided in packet) Planning & Zoning Commission Page 4 of 4 November 3, 2011