Loading...
HomeMy WebLinkAboutStaff Comments(*OF"" CITY OF COLLEGE STATION Home ofT"&AeiM Unioeaity' 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM September 30, 2011 q . �D • ( TO: Cedar Creek Group, via email: folliscoleconstruction(a)windstream.net// FROM: Jason Schubert, AICP Planning Administrator SUBJECT: CEDAR CREEK PLAZA (PP) Thank you for the submittal of your PRELIMINARY PLAT application. This project will be distributed to staff next week for their review. cc: Schultz Engineering, via email: joeschultz84@verizon.net Case file no. 11-00500151 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM October 12, 2011 TO: Cedar Creek Group, via email: folliscoleconstruction(o)windstream.netl/ FROM: Jason Schubert, AICP, Principal Planner SUBJECT: CEDAR CREEK PLAZA (PP) - Preliminary Plan Staff reviewed the above -mentioned Preliminary Plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Tuesday, October 18, 2011, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for Thursday, November 3, 2011, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue: One (1) 24" x 36" copy of the revised Preliminary Plan; and Thirteen (13) 11" x 17" copies of the revised Preliminary Plan. Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If all comments have not been addressed, your project will be pulled from the scheduled Planning & Zoning Commission agenda. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.qov/pz Please note that a Mylar original of the revised preliminary plan will be required after P&Z approval and prior to processing subsequent final plats. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments / cc: Schultz Engineering, via email: joeschultz84(Qverizon.netv Case file #11-00500151 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review.1 of 2 STAFF REVIEW COMMENTS NO. 1 Project: CEDAR CREEK PLAZA (PP) — (11-00500151) PLANNING 1. Is future head -in parking facing North Graham Road anticipated? If so, the proposed 25-foot private cross access easement should be moved further away from North Graham Road to where the drive aisle would likely be located. 2. Please verify the cross section of the proposed drive aisle for the Public Way with minimum 3 feet of green space and minimum 5-foot wide sidewalks on each side fit within the proposed Public Access Easement. Reviewed by: Jason Schubert Date: October 12, 2011 NOTE: Any changes made to the plans which have not been requested by the City of College Station, much be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City will constitute a completely new review. ENGINEERING COMMENTS NO. 1 1. Please verify that all waterlines, including fire hydrants, are at least 5.5-ft from the edge of the proposed PUE. 2. Please label the detention pond as "Private." 3. Please verify that an offsite drainage easement will not be needed for pond discharge. 4. Add a note indicating that Wellborn SUD will be serving the property. 5. Label the horizontal curve radius of the public way. 6. Please add a note that offsite easements will be obtained with the final plat for the extension of water and sanitary sewer infrastructure. 7. Label the portion of the Public Way that will be built with future development. Reviewed by: Erika Bridges Date: October 6, 2011 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. Project location is outside of College Station Utilities certification area. CSU will not provide electric service to this project. GENERAL ELECTRICAL COMMENTS 1. To discuss any of the above electrical comments please contact Gilbert Martinez at 979.764.6255. Reviewed by: Gilbert Martinez SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: October 6, 2011 Date: October 5, 2011 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review.2 of 2 a CITY OF COT.T.FGP STATION Home of Texas A&M University' 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM S October 26, 2011 TO: Cedar Creek Group, via email: folliscoleconstruction()windstream.net/ FROM: Jason Schubert, AICP, Principal Planner SUBJECT: CEDAR CREEK PLAZA (PP) - Preliminary Plan Staff reviewed the above -mentioned Preliminary Plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Thursday, October 27, 2011, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for Thursday, November 3, 2011, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. One (1) 24" x 36" copy of the revised Preliminary Plan; and Thirteen (13) 11" x 17" copies of the revised Preliminary Plan. Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If all comments have not been addressed, your project will be pulled from the scheduled Planning & Zoning Commission agenda. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.qov/Pz Please note that a Mylar original of the revised preliminary plan will be required after P&Z approval and prior to processing subsequent final plats. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Schultz Engineering, via email: ioeschultz84(Qverizon.net✓ Case file #11-00500151 STAFF REVIEW COMMENTS NO. 2 Project: CEDAR CREEK PLAZA (PP) - 11-00500151 PLANNING 1. No further comments. Reviewed by: Jason Schubert Date: October 19, 2011 ENGINEERING COMMENTS NO. 2 1. (Repeat) Label the horizontal curve radius of the public way. - The minimum horizontal curve radius for a public way is 200-ft. Please revise. 2. (Repeat) Please verify that an offsite drainage easement will not be needed for pond discharge. - FYI ... Based on the contour data for the adjacent site, it looks like a drainage easement will be needed with site development to convey the drainage through the adjacent site. Reviewed by: Erika Bridges Date: October 24, 2011