HomeMy WebLinkAboutPublic Way LetterSchultz Engineering, LLC
September 28, 2011
Planning & Development Services
City of College Station
1101 Texas Avenue
College Station, TX 77840
Re: Preliminary Plan — Cedar Creek Plaza
The proposed Preliminary Plan for Cedar Creek Plaza varies slightly from the
Concept Plan. The Public Way through this tract connects to the adjacent
Subdivision in the center of a lot, causing that lot to not be developable. Also, if the
Public Way was extended in a straight line to Rock Prairie Road West, it would not
meet driveway separation distance from General Parkway.
I have met with the adjacent landowners, the Mikeska's, and they requested the
alignment of the Public Way be revised as shown on the attached sketch. 1 feel this
alignment change is minor and the intent of the Concept Plan is still achieved.
Also, the Mikeska's requested the extension of the public sewer and water lines to
Cedar Creek Plaza be located on either side of the fixture public way shown on the
sketch. Easements for the water and sewer lines will be dedicated by separate
instruments once it has been confirmed by staff that this alignment for the public
way and utility lines are acceptable.
If you have any questions, please do not hesitate to call.
Very truly yours,
Schultz Engineering, LLC.
Joe Sc Itz, P.E.
Civil Engineer
P.O. Box 11995 • College Station, Texas 77842
schultzengineeringllc.com
Office: 979.764.3900
Fax: 979.764.3910
., EXISTING
SEWER L,..c
tss.e'
ROCK PRAIRIE ROAD
J15.fi'
I f
EXISTING 8" SEWER LINE
I�
FUTURE
42' PUBLIC
ACCESS EASEMENT
�: I\ Y � I
PROPOSED 8° Q
SEWER LINE NI p
PROM
m m cv 15' P .E.
I�IW
aI PROPOSED 12"
L 3 I 1 WATER LINE
m
1 I�
I
PROPOSED 04 N I LOT 4
15' P.U.E. CK 1
LOT 5
BLOCK 1
N/F
F
ZONED A-0 I I CTEC, LTD. N/F D.
IN�I II I ZONED A-0 I ZO C A-0
ROCK PRAIRIE
\ \�� EST BUSINESS PARK,
\ PHASE 1
\\\ML 4966/66
N 42°25'59" E - 623:3k
.37' 42.00' 48.
42 PU C
ACCESS
SEMENT