HomeMy WebLinkAboutTIAWALTER P MOORE
April 7, 2011
Lauren Hovde, Staff Planner
City of College Station Planning and Development
1101 Texas Avenue South
College Station, Texas 77842
Re: Traffic Impact Analysis for Lot 7, 8, 18, and 3C
Tower Point Development
College Station, Texas
Walter P Moore Project Number 23-05040-14
Dear Ms. Hovde:
This letter is to provide an assessment of the relative traffic impact associated with four lots within
the large retail parcel of the Tower Point Development, located on the northwest corner of Highway
6 and Highway 40 in College Station. This assessment builds upon the previously submitted traffic
impact analysis for Tower Point developed by Walter P Moore and submitted to the City of College
Station in December 2009. Background traffic volumes, lane configurations along roadways and at
intersections and driveways, and anticipated land uses of other parcels are assumed to be
unchanged from the previous TIA. Trip distributions are also assumed to be unchanged.
Since the analysis in the TIA was for the AM and PM peak hours of the roadways, the rates for the
adjacent street were used. The rates shown in this letter are consistent with the rates used in the
previous TIA which was approved in February 2010 for the complete development. It should be
noted that Trip Generation does not provide rates for the AM peak hour of the adjacent street since
most retail establishments do not have a high AM peak hour volume. For this reason, an average
trip generation rate of 0.3 for the AM peak hour and the ITE rates for the PM peak hour of the
adjacent street were used. This report will compare the trip generation values for the previously
assumed land use for this parcel with the proposed land use.
This letter report addresses four lots. In the previous TIA, three parcels in question were identified as
lots 7, 8, and 18. The parcel identified as Lot 30 was not identified in the previous TIA. This parcel is
located off of Arrington Road, north of the detention pond. Three of the proposed lots surround the
HEB development south of the roundabout at Arrington Road, and one is located to the north of the
roundabout. The locations of the lots relative to the Tower Point development are shown in Figure 1.
1301 MCKINNEY, SUITE 1100
HOUSTON, TEXAS 77010
PHONE: 713.630.7300 FAX 713.630.7396 i
WWW.WALTERPMOORE.Com
've�J
Ms. Lauren Hovde
City of College Station
April 7, 2011
Page 2
Proposed Lot 30
High Turnover Sit
Down Restaurant
Analysis
sed Lot 7
(Fas:tF:W Restaurant Proposed Lot E
_ Drive-in Bank
Proposed Lot 18
Fast Food Restaurant
Figure 1
Location of the Proposed Developments
Within the Tower Point Development
The previously assumed land use for Lots 7 and 8 were "High -Turnover Sit -Down Restaurant" (ITE
Land Us Code 932). Now, Lot 7 is proposed to be a "Fast Food Restaurant with Drive -through" (ITE
Land Use Code 934) and Lot 8 is proposed to be a "Drive-in Bank" (ITE Land Use Code 912). Lot
18 was previously assumed to be a "Tire Store" (ITE Land Use Code 848) and is proposed to be a
"Fast Food Restaurant with Drive -through" (ITE Land Use Code 934). Lot 30 is intended to be a
"High -Turnover Sit -Down Restaurant" (ITE Land Use Code 932). The sizes of the planned lots are as
follows; Lot 7 is 4,500 square feet, Lot 8 is 3,640 square feet, Lot 18 is 2,950 square feet, and Lot
30 is 7,506 square feet. Table 1 shows a comparison of the previously defined land uses and square
footage and the proposed developments.
Ms. Lauren Hovde
City of College Station
April 7, 2011
Page 3
TABLE 1
Comparison of Land Use and Square Footages
Tower Point
College Station, Texas
Land Use
S uare Foota e
Parcel
December 2009 TIA
Current Letter
December
Current Letter
4/7/2011
2009 TIA
4/7/2011
Lot 7
High -Turnover Sit-
Fast Food Restaurant
5,600
4,500
Down Restaurant
with Drive Through
Lot 8
High -Turnover Sit-
Drive-in Bank
5,600
3,640
Down Restaurant
Lot 18
Tire Store
Fast Food Restaurant
7,500
2,950
with Drive Through
Lot 30
n/a
High -Turnover Sit-
n/a
7,506
Down Restaurant
To complete a study for a proposed development, the number of trips expected to be generated by
the planned facilities must be determined. The number of trips generated by the development
during an average weekday and for weekday peak hours is based on factors such as the land use
type and size of the building. Standard rates from the Institute of Transportation Engineers (ITE)
publication, Trip Generation Manual, 8h Edition, were used to determine the amount of traffic
generated by the various land uses in the proposed development.
Trip sharing among all the parcels associated with the large retail parcel of Tower Point was
assumed to be 10%. A comparison of the anticipated trip generation between the previous report
and the proposed conditions is presented in Table 2.
Ms. Lauren Hovde
City of College Station
April 7, 2011
Page 4
TABLE 2
Comparison of Net Vehicular Trip Generation Estimates
Tower Point
Collecle Station, Texas
Weekday
A,M,
Peak
P.M.
Peak
Gross ITE
Net Vehicle
Gross ITE
Net Vehicle
Size
Shared
Land Use
and
Trip
Gross
Net
Net
Trips
Trips
Trips
Trips
(ITE Code)
Units
Factor
ITE
Trips
Trips
Enter
Exit
Enter
Exit
Enter
Exit
Enter
Exit
Assumed Land Use from December 2009 Traffic Impact Analysis
Lot 7 - High
Turnover Sit-
5,600
Down
SF
0
10%
712
641
34
31
31
28
37
25
33
23
Restaurant
(932)
Lot 8 - High
Turnover Sit-
5,600
Down
SF
0
10%
712
641
34
31
31
28
37
25
33
23
Restaurant
(932)
Lot 18 - Tire
7,500
10%
187
168
14
8
13
7
13
18
12
16
Store (848)
SF
Lot 30
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
Subtotal
18,700
-
1,611
1,450
81
71
75
63
86
69
78
62
Proposed Land Use
Lot 7 - Fast
Food
4,500
10%
2,233
2,010
113
109
102
98
79
73
71
66
Restaurant
SF
(934)
Lot 8 - Drive
3,640
10%
539
485
25
20
23
21
47
47
42
42
in Bank (912)
SF
Lot 18 - Fast
Food
2,950
10%
1,464
1,318
74
72
67
65
52
48
47
43
Restaurant
SF
(934)
Lot 30 - High
Turnover Sit-
7,506
Down
SF
10%
954
859
45
41
41
37
50
34
45
31
Restaurant
(932)
Subtotal
18,596
ST
-
5,190
4,672
258
241
233
221
228
202
205
182
CHANGE
104
0%
3,579
3,222
177
170
158
158
142
133
127
120
Ms. Lauren Hovde
City of College Station
April 7, 2011
Page 5
The development has had changes to the land uses in the past. To accurately assess the impact to
the roadways it is important to look at the changes in the development cumulatively. Table 3
provides a cumulative summary of previous TIA letters highlighting the land use changes.
TABLE 3
Summary of Past Land Use Changes
Tower Point
College Station, Texas
TIA
Land Use
Increase or Decrease in Total Trips (Net)
Letter
Lot
Previous
Current
Total
AM trips
PM trips
Enter
I Exit
Enter
Exit
trips
July 7,
28
Specialty Retail
Specialty Retail
-80
0
0
-2
-3
2010
(814)
(814)
March
1
15
Fast Food
Specialty Retail
1,289
73
70
47
42
2011
Restaurant (934)
(814)
Current
High Turnover
Fast Food
letter
7
Sit -Down
Restaurant (934)
+1,369
+71
+70
+38
+43
Restaurant (932)
Current
High Turnover
Drive in Bank
letter
8
Sit -Down
(912)
-156
-8
-7
+9
+19
Restaurant (932)
Current
18
Tire Store (848)
Fast Food
+1150
+54
+58
+33
+27
letter
Restaurant (934)
Current
High Turnover
letter
30
n/a
Sit -Down
+859
+41
+37
+45
+31
Restaurant (932)
Total
1 +1853
+85
+88
+76
+75
As seen above in Table 3, the changes in land use that have occurred generate less than 100 net
trips in either peak hour. This is less than what is typically needed to require a new traffic impact
study.
Summary
The proposed land uses are anticipated to generate more trips than the land use assumed in the
previous TIA. One major source of these new trips is the tire store being replaced with a fast food
restaurant. However, the tire store land use is anticipated to relocate to Lot 20, which would replace
a planned fast food restaurant with drive through. The new development at Lot 30 is the other
development contributing to the additional generated trips. This development is expected to
generate less than 50 entering or exiting trips in the peak hour.
As the developer continues to make agreements for individual parcels, land uses are being adjusted
to create a better overall development. Since some land uses are still being adjusted it is possible
that the total change in trips could decrease or equal what is shown in the original TIA. It is our
understanding that the developer will continue to provide TIA update letters to reflect future changes
as they occur.
Ms. Lauren Hovde
City of College Station
April 7, 2011
Page 6
Please let me know if you have any questions or need additional information.
Yours very truly,
WALTER P. MOORE AND ASSOCIATES, INC.
Jennifer L. Peek, P.E., PTOE, PTP
Principal
CC: Andy Weiner, Weiner Development Corporation
Mike Coontz, Weiner Development Corporation
Kevin Sullivan, P.E., Walter P Moore
P:\23\2005\05040-14\Design & Studies\Reports\Mutliple Lot TIA Letter.doc
Document Incomplete:
Not intended for permit or Construction
Engineer: Jennifer L. Peek, P.E.
P.E. Serial No. 90254
Date: April 7, 2011
Walter P. Moore and Associates, Inc.
JJ a
P-re ) )b
WALTER P MOORE
September 14. 2011
Lauren Hovde, Staff Planner
City of College Station Planning and Development
1101 Texas Avenue South
College Station, Texas 77842
Re: Traffic Impact Analysis for Lots 7, 8, and 18
Tower Point Development
College Station, Texas
Walter P Moore Project Number 23-05040-14
Dear Ms. Hovde:
This letter is to provide an assessment of the relative traffic impact associated with three lots within
the large retail parcel of the Tower Point Development, located on the northwest corner of Highway
5 and Highway 40 In College Station. This assessment builds upon the previously submitted traffic
Impact analysis for Tower Point developed by Walter P Moore and submitted to the City of College
Station in December 2009. Background traffic volumes, lane configurations along roadways and at
intersections and driveways, and anticipated land uses of other parcels are assumed to be
unchanged from the previous TIA. Trip distributions are also assumed to be unchanged.
Since the analysis In the TIA was for the AM and PM peak hours of the roadways, the rates for the
peak hours of the adjacent streets were used. The rates shown in this letter are consistent with the
rates used in the previous TIA which was approved in February 2010 for the complete development
It should be noted that Trip Generation does not provide rates for the AM peak hour of the adjacent
street since most retail establishments do not have ahigh AM peak hour volume. For this reason,
an average trip generation rate of 0.3 for the AM peak hour and the ITE rates for the PM peak hour
of the adjacent street were used. This report compares the trip generation values for the previously
assumed land use for these three lot with the proposed land use.
This letter report addresses three lots. In the previous TIA, the three lots in question were Identified
as lots 7, 8, and 18, The lots surround the HEB development south of the roundabout at Arrington
Road. The locations of the lots relative to the Tower Point development are shown in Figure 1.
43
1301 MOKINNEV. SUITE 1100
HOUSTON, TEXAS 77010
PHONE: 713,630.7300 FAx.713.630.7306
www. WALTE RP MOOR E.00M
Ms. Lauren Hovde
City of College Station
September 14, 2011
Page 2
`r Lot 7 Proposed
Fast Food Restaurant
:Hu _
Analysis
Lot 8 Proposed _
Drive-in Hank
1 ♦
Z 4K 4 n
wh. miF 1.
:nL i
t
Lot 18 Proposed
Fast Food Restaurant /
ru
( `r
Figure 1
Location of the Proposed Developments
Within the Tower Point Development
The previously assumed land use for Lots 7 and 8 was "High -Turnover Sit -Down Restaurant" (ITE
Land Use Code 932). Now, Lot 7 is proposed to be a "Fast Food Restaurant with Drive -through"
(ITE Land Use Code 934) and Lot 8 is proposed to be a "Drive-in Bank" (ITE Land Use Code 912).
Lot 18 was previously assumed to be a "Tire Store" (ITE Land Use Code 848) and is now proposed
to be a "Fast Food Restaurant with Drive -through" (ITE Land Use Code 934). The sizes of the lots
are as follows; Lot 7 is 4,500 square feet, Lot 8 is 3,640 square feet, and Lot 18 is 2,950 square
feet. Table 1 shows a comparison of the previous and the proposed developments.
Ms. Lauren Hovde
City of College Station
September 14, 2011
Page 3
TABLE 1
Comparison of Land Use and Square Footages
Tower Point
College Station, Texas
Land
Use
S uare Footage
Parcel
December 2009 TIA
Current Letter
December
Current Letter
9/14/2011
2009 TIA
9/14/2011
High -Turnover Sit-
Fast Food Restaurant
Lot 7
Down Restaurant
with Drive Through
5.600
4,500
Lot 8
High -Turnover Sit-
Drive-in Bank
5,600
3.640
Down Restaurant
Lot 18
Tire Store
Fast Food Restaurant
7,500
2,950
with Drive Through
To complete a study for a proposed development, the number of trips expected to be generated by
the planned facilities must be determined. The number of trips generated by the development
during an average weekday and for weekday peak hours is based on factors such as the land use
type and size of the building. Standard rates from the Institute of Transportation Engineers (ITE)
publication, Trip Generation Manual, 9' Edition, were used to determine the amount of traffic
generated by the various land uses in the proposed development.
Trip sharing among all the parcels associated with the large retail parcel of Tower Point was
assumed to be 10%. A comparison of the anticipated trip generation between the previous report
and the proposed conditions is presented in Table 2.
Ms. Lauren Hovde
City of College Station
September 14, 2011
Page 4
TABLE 2
Comparison of Net Vehicular Trip Generation Estimates
Tower Point
Colle e Station, Texas
Weekday
A.M.
Peak
P.M.
Peak
Gross 1TE
Net Vehicle
Gross ITE
Net Vehicle
Size
Shared
Land Use
and
Trip
Gross
Net
Trips
Trips
Trips
Trips
(ITE Code)
Units
Factor
RE
Vehicle
Trips
Trips
Enter
Exit
Enter
LlEAt
Enter
Ewt
Enter
Exit
Assumed Land Use from Oecember2O09 Traffic Impact Analysis
- High
5,6000
Sit -Down
SF
10%
712
641
34
31
31
28
37
25ant
932)
- High
F
5,600
Sit -Down
SF10%
712
641
34
31
31
28
37
25ant
932
Tire Store
7,50010%
187
168
14
8
13
7
13
18
12
16
48)
SF
Subtotal
1 8F 0
-
1,611
1,450
82
70
75
63
87
68
78
62
Proposed Land Use
Lot 7 - Fast Food
4,500
10%
2,233
2,010
113
109
102
98
79
73
71
66
Restaurant (934)
SF
Lot 8 - Drive in
3,640
10%
539
485
25
20
23
21
47
47
42
42
Bank (912)
SF
Lot 18-Fast Food
2,950
10%
1,464
1,318
74
72
67
65
52
48
47
43
Restaurant (934)
SF
Subtotal
11,0F90
-
4,236
3,813
212
201
192
184
178
168
160
151
CHANGE
-7,610
Ory°
2,625
2,363
130
131
117
121
91
100
82
89
The development has had changes to the land uses in the past. To accurately assess the impact to
the roadways it is important to look at the changes in the development cumulatively. Table 3
provides a cumulative summary of previous TIA letters highlighting the land use changes.
Ms. Lauren Hovde
City of College Station
September 14, 2011
Page 5
TABLE 3
Summary of Past Land Use Changes
Tower Point
College Station, Texas
Land Use
Increase or Decrease in Total Trips Net
TIA Letter
Lot.
Previous
Current
Total
AM trips
PM trips
Enter
Exit
Enter
Fait
trips
July 7,
28
Specialty Retail (814)
Specialty Retail
_80
0
0
-2
-3
2010
814
March 16,
15
Fast Food Restaurant
Specialty Retail
2011
934
814)
-1,289
-73
-70
-47
-42
Current
7
High Turnover Sit-
Fast Food
letter
Down Restaurant 932
Restaurant 934
+1,369
+71
+70
+38
+43
Current
8
High Turnover Sit-
Drive in Bank
letter
Down Restaurant 932
9i
-166
-8
-7
+9
+19
Current
letter
18
Tire or (848)
Fast Food
Restaurant 934
+1150
+54
+58
+33
+27
Total
+994
+44
1 +51
+31
+44
As seen above in Table 3, the changes in land use that have occurred generate less than 100 net
trips in either peak hour. This is less than what is typically needed to require a new traffic impact
study.
Summary
The proposed land uses are anticipated to generate more trips than the land use assumed in the
original TIA. One major source of these new trips is the tire store being replaced with a fast food
restaurant. However, the tire store land use is anticipated to relocate to Lot 20, which would replace
a planned fast food restaurant with drive through.
As the developer continues to make agreements for individual parcels, land uses are being adjusted
to create a better overall development. Since some land uses are still being adjusted it is possible
that the total change in trips could decrease or equal what is shown in the original TIA. It is our
understanding that the developer will continue to provide TIA update letters to reflect future changes
as they occur.
Please let me know if you have any questions or need additional information.
Yours very truly,
WALTER P.
MOORE AND ASSOCIATES, INC.
021
�/ g--
Randolph V.
Schulze, P.E., PTOE, PTP
Principal
CC: Andy Weiner, Weiner Development Corporation
Mike Coontz, Weiner Development Corporation
Kevin Sullivan, P.E., Walter P Moore
P:\23\2005\05040-14\ensign 8 Studies\Reports\Lot 7,8, 18 TIA Letter.doo
Walter P. Moore and Associates, Inc.
TBPE Finn Rerlstration No. 1856
SCHULZE