Loading...
HomeMy WebLinkAboutTIA RequirementTIA Requirement TDI-Brooks International Center Laboratory and Office Building Site Plan Projected Peak Hour Vehicle Trips per C-1 zoning. 20,000 sf of laboratory and future office x 3.75 Trips per KSF = 75 Vehicle Trips These assumed Trip Generations are < 150 Vehicle Trips Assumed TIA for this Site plan is not required it-130 q-77VI TIA Requirement TDI-Brooks International Center Laboratory and Office Building Site Plan Projected Peak Hour Vehicle Trips per C-1 zoning. 20,000 sf of laboratory and future office x 3.75 Trips per KSF = 75 Vehicle Trips These assumed Trip Generations are < 150 Vehicle Trips Assumed TIA for this Site plan is not required