TDI-Brooks International Center
Laboratory and Office Building
Site Plan
Projected Peak Hour Vehicle Trips per C-1 zoning.
20,000 sf of laboratory and future office x 3.75 Trips per KSF = 75 Vehicle Trips
These assumed Trip Generations are < 150 Vehicle Trips
Assumed TIA for this Site plan is not required