Loading...
HomeMy WebLinkAboutStaff Comments1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM August 19, 2011 TO: Mitchell & Morgan,LLP; via email: v@mitchellandmorgan.com ✓ t' FROM: Molly Hitchcock, AICP Planning Administrator SUBJECT: LAKERIDGE TOWNHOMES PH 2A (SP) Thank you for the submittal of your SITE PLAN - RESIDENTIAL application. This project will be distributed to staff next week for their review. cc: Lakeridge Living LP; via email: jimbstewart@gmail.com V Case file no. 11-00500129 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979,764.3570 / Fax 979.764.3496 CITY OP Coi.r.a•:ci•: SYAYION Hun fT­A&M Unmrmi,' MEMORANDUM August 25, 2011� TO: Mitchell & Morgan, LLP; via email: v @mitchellandmorgan.com, � C� FROM: Matthew Hilgemeier, Staff Planner SUBJECT: Lakeridge Townhomes Ph 2a (Sp)- Site Plan Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by any Monday at 10:00 a.m. for further staff review: City of College Station Transmittal Letter; Memo providing written responses to all of staff's comments (identify the specific page that each comment was addressed on or the reason for not addressing the comment); Four (4) revised site and one (1) landscaping plan; $47,734 (29 units X $1,646) Parkland Dedication fees prior to issuance of a building permit; Easement Dedication Sheet and required documents (please note that the Site Plan will not be stamped approved until the Blanket Easement, or all other appropriate easements, have been dedicated to the City of College Station). Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please contact Matthew Hilgemeier at 979.764.3570. Attachments: Staff review comments PC: Lakeridge Living LP; via email: iimbstewartna gmail.com Case file #11-00500129 STAFF REVIEW COMMENTS NO. 1 Project: Lakeridge Townhomes Ph 2a (SP) — 11-00500129 PLANNING 1. Site Plan Note # 13 states that there are 29 units in Phase 2A, but the site plan only shows 27 units. Please clarify. 2. Please indicate how the interior island requirements are being met (180 s.f. for every 15 interior parking spaces) 3. Please provide a detail of the sidewalk area outside of Building 9 near the unit labeled "HC Unit". If this area includes an ADA accessible ramp, then handrails must be provided in this area. 4. The planters located outside of Building 9 seem to interfere with the minimum 6-foot sidewalk required for 18-foot spaces. Please revise to show that there is enough room for a 2-foot overhang and 3-foot walk space. 5. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not be made of aware of will constitute a completely new review. Reviewed by: Matthew Hilgemeier, Staff Planner Date: August 25, 2011 LAN DSCAPING/STREETSCAPING/BUFFER 1. Please revise the note regarding groundcover to state that loose rock is not allowed. 2. Street trees can count towards meeting your landscape requirements. Please revise the points table to include points for the Drake Elm (you need these points to meet the requirement that half of the required landscape points come from canopy trees). 3. Please revise the points for the Crepe Myrtle. It should be 40 points for each tree and 120 points total. 4. The total points shown for the Savannah Holly is incorrect. Please revise. 5. Please provide screening around three sides of the electrical transformers so that access to the panel is not blocked. Please keep in mind that there should be a 5-foot clear space around the transformer on all sides. 6. Please show all Fire Department Connections (FDC) on the landscape plan. Please provide a 3-foot clear space around all FDCs, making sure to keep the access area in front of the FDC clear. It appears that some of the canopy and non -canopy trees may be located too close to the FDCs shown on the site plan. Reviewed by: Matthew Hilgemeier, Staff Planner Date: August 25, 2011 MISCELLANEOUS 1. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double -Check Back Flow Device, and installed as per City Ordinance 2394. Page 2 of 5 2. All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. ENGINEERING COMMENTS NO. 1 1. Please submit PUE dedication application. FYI ... This easement will need to be dedicated prior to issuance of CO. 2. What is the status of the sidewalk along FM 2818? 3. Sh.02 - The waterline should be at least 20-ft away from buildings. Please shift waterlines accordingly. 4. Sh.02 - Please move the private storm sewer inlet near Building 10 out of the PUE. 5. Sh.02 - General Note #2 should reference the 2009 BCS Guidelines. 6. Sh.02 - Site Plan Notes #9 & 10 - Please use historical usage or fixture units to calculate water and sanitary sewer demands. 7. Sh.03 - Please provide a detail for the drainage swale to the south of Building 8. 8. Sh.03 - Label the elevations at the beginning of the swale and the top of the proposed grate inlet south of Building 8. 9. Sh.03 - Please add inlet protection at the grate inlet south of Building 8. 10. Sh.03 - Please label the flowline elevation of each parking lot inlet. 11.Sh.03 - FYI ... A separate building permit will be required for retaining walls exceeding 24". 12. Sh.04 - Please label all FDCs, isolation valves, and meters. 13. Sh.04 - Please use City Standard Details for cleanouts and services. 14. Sh.05 - It looks like there are a few spots where the minimum 4-ft cover is not being provided. 15.Sh.05 - Please remove FDCs from PUEs where possible. 16.Sh.05 - At approximate Station 31+32, please cross the waterline above the storm sewer to avoid excess depth. 17.Sh.05 - Verify that all water infrastructure, including fire hydrants, are at least 5.5-ft from the edge of PUEs. 18. Sh.06 - What are the 4" waterlines shown on the profile drawing? 19. Water Report - Please provide model of system under Normal Conditions. Reviewed by: Erika Bridges Date: August 26, 2011 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. All easements on site are existing. Electric facilities will be designed within existing easements. 2. Developer may be responsible for locating easements on site to insure that electrical infrastructure is installed within easement boundaries. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer provides 30' of rigid or IMC conduit for riser poles. CSU installs riser. 4. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. 5. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. 6. Developer pours electric device pads or footings (i.e. transformers, pull boxes etc) per CSU specs and design. 7. Developer installs pull boxes per CSU specs and design (pull boxes provided by CSU). 8. Developer provides digital AutoCAD 2000 or later version of plat and / or site plan. Email to: sweido@cstx.gov. 9. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformer(s), pull box(es), switchgear(s), meter location and conduit routing as designed by CSU. 10.To discuss any of the above electrical comments please contact Gilbert Martinez at Sam Weido at 979.764.6314. Reviewed by: Sam Weido Date: August 24, 2011 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 QTYOP COO.IiGH STATION N mr ofT«�AdM� imiry' MEMORANDUM September 19, 2011 TO: Mitchell & Morgan, LLP; via email: vna.mitchellandmorpan.com✓ FROM: Morgan Hester, Staff Planner SUBJECT: Lakeridge Townhomes Ph 2a (SP) - Site Plan cj.lq•II CC Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. The next submittal will be the third and final review by staff for this round of reviews. If all items have not been addressed on the next submittal, another $932 processing fee will need to be submitted for the subsequent set of three (3) reviews. Please address the comments and submit the following information by any Monday at 10:00 a.m. for further staff review: City of College Station Transmittal Letter Seven (7) complete sets of site civil construction documents for the proposed development with the revised site and landscaping plans attached (one set will be returned to you, please submit additional copies if you want more than one approved set) Four (4) revised site plans One (1) landscaping plan One (1) 11x17 grading and erosion control plan Four (4) revised site and one (1) landscaping plan. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Lakeridge Living LP; via email: iimbstewartCa�camail.comJ Case file #11-00500129 STAFF REVIEW COMMENTS NO. 2 Project: Lakeridge Townhomes Ph 2a (SP) - 11-00500129 LANDSCAPING/STREETSCAPING/BUFFER NO. 2 1. The total number for the Savannah Holly is incorrect. Please revise. Revised by: Morgan Hester, Staff Planner Date: September 19, 2011 ENGINEERING COMMENTS NO. 2 1. What is the status of the sidewalk along FM 2818? It was our understanding that the sidewalk was going to be constructed after TxDOT's construction in this vicinity was completed. Is there a reason for postponing construction until the next phase? 2. (Repeat) Sh.02 — Site Plan Notes #9 & 10 — Please use historical usage or fixture units to calculate water and sanitary sewer demands. Previously the water and sanitary sewer demand calculations were submitted via email. Please address the following questions: - Please justify the use of 80 gpcd for wastewater calculations. - Exhibit #6 from the original water report, submitted with Phase 1 of the project, doesn't seem to use 0.6 gpm/unit for average demands. Please update or clarify. 3. (Repeat) Sh.05 — It looks like there are a few spots where the minimum 4-ft cover is not being provided. There are still areas, besides at the storm crossing, where the minimum 4-ft cover is not being provided. 4. (Repeat) Sh.05 — Verify that all water infrastructure, including fire hydrants, are at least 5.5-ft from the edge of PUEs. The fire hydrant near Building 10 needs to be within a PUE. 5. (Repeat) Sh.06 — What are the 4" waterlines shown on the profile drawing? Specifically the waterlines at Sta. 1+35.60 and Sta. 1+38.45 are not shown crossing the storm sewer in plan view. Please clarify. 6. Water Report — Please provide model of system under Normal Conditions. The model of the Normal System was not attached. Reviewed by: Erika Bridges Date: 9/16/11 ELECTRICAL COMMENTS NO. 2 REQUIRING IMMEDIATE ATTENTION 1. Developer provides temporary blanket easement for construction purposes or provides descriptive easements for electric infrastructure as designed by CSU for electric lines. 2. Developer may be responsible for locating easements on site to insure that electrical infrastructure is installed within easement boundaries. GENERAL ELECTRICAL COMMENTS NO. 2 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer provides 30' of rigid or IMC conduit for riser poles. CSU installs riser. 4. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. 5. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. 6. Developer pours electric device pads or footings (i.e. transformers, pull boxes etc) per CSU specs and design. 7. Developer installs pull boxes per CSU specs and design (pull boxes provided by CSU). 8. Developer provides digital AutoCAD 2000 or later version of plat and / or site plan. Email to: sweido@cstx.gov. 9. Developer provides load data to CSU as soon as it is available to avoid construction delays. Delivery time for transformers not in stock is approximately 40 weeks. 10. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformer(s), pull box(es), switchgear(s), meter location and conduit routing as designed by CSU. 11. To discuss any of the above electrical comments please contact Sam Weido at 979.764.6314. Reviewed by: Sam Weido Date: 9-14-11 SANITATION The dumpster pad on the south — west end of phase 2-A needs to be rotated 15 degrees clockwise in order to give us a straight and clear maneuvering path to the dumpsters. 2. The dumpster pad in the center above bldg 30 of phase 2-A needs to be rotated 10 degrees clockwise in order to give us a straight and clear maneuvering path to the dumpsters. Reviewed by: Wally Urrutia Date: September 13, 2011