Loading...
HomeMy WebLinkAboutCost Estimate-�� The Cityof �`\ Colllege Station, Texas Embracing the Past Exp[oring the Future. P.O. Box"60 1101 Texss Avenue I College Stiolm TX n842 (979)7M-3500 www.Ci.CoBegestatwn.lx.us 17 December 2003 Mr. Rabon Metcalf, PE Post Office Box 9253 College Station, Texas 77842-9253 RE: Normand Street Extension Deposit Dear Mr. Metcalf: The City is In receipt of the College Station Medical Center's check in the amount of $135,000 for the future extension of Normand Street through right-of-way recently dedicated by the Med. The funds have been deposited in the City's Street Capital Account for use when the Normand extension Is constructed. This letter will serve as your receipt for the funds. Please contact me if you have any questions. Sincerely, Kelly E. Templin, AICP Director of Development Services Enclosure a: Glenn Brown, Assistant City Manager, Mr, Mark Smith, PE, Director of Public Works Home of Texas A& Urdversity Home of the George Bush Pmeidentad Library and Museum Engineer's Cost Estimate NORMAND DRIVE EXTENSION (38t H.M.A.C. STREET SECTION) COLEGE STATION, TEXAS 10-Nov-03 1 � Caos6uetim Sletiugd Caoamxtiao 1 u $6,MW S6.000.00 C 2 Barricades, Sipes&l (]oaad 1 IS $5100000 $5100ow 3 Erosim, SMimmletioeCoolM dgzdmg 1 IS $1,000A0 $1,00000 4 FiPoxmk Bxaretim('Polle Naued 011) I'M CY 58.50 $14,450.00 6 EmbeokmmlPmponag8slut 1,400 CY $10.00 f14,000.00 N9m16vroRStrmeW 6 FsvEwok Embeokmoa(IoFm4 d Pml Grading) no CY 57.00 $I,400.00 (F natM Mtlerial an Sik) 2 gmtoRad CmaarSihwad (]ucNtlmlilC Rx 375 IS $IOAC $3,75100 ) 8 6"3Eiak geiufazceO Caoaele ApOw 250 SY $30.00 V1soscso 9 6°gmced Sga$vd Coomart]vb@GuOa 750 IN $9.00 $0000A0 10 8" look CCmpmtNI lime Sladlimd SubgaJe(M 1,375 SY $4.75 $6,531.25 Iiwby Wcgbt) 11 6" lack C®paaolUnemnalose (]yps A, Gmh 1,175 SY U..75 $5,931M 12 )��C°mpo°Ietl Not -mix AspM1eltCmude (type 1,1Z SY X75 $7593.75 13 Slmm Sner Omwuge lmgonmeac 1 IS $25,000.00 S:SM.N 14 Seippio Symbol;@Scene 1 IS $1,900D0 Y1,900A0 15 Ekmtrieel Poles, Bme@£doves 2 M skow.00 $12,000.00 16 Coo0u0— s@Appucrenmlw 1 IS W(10.00 0,000.00 CONSMUCIIONCOST— $125,05Q25$9.94335 TOTALCONBTEI)CTIONCOIR= 51JSpu0.00C01-144018MU w ]at SCHULTL ENGINEERING, I.I.C. 2730 Longmire Drive, Suite A College Station, Texas 77845 Firm No. 12327 Normand Drive- Med Tract Engineer's Preliminary Estimate of Construction November 22, 2011 Ian Deecdplim Unit Ed�Oed Unit Peke Total named Ikw wn. Overhead aM Co,wmclioo Slaklpg LS I S 5, atto JSU2"�00 ontml-m Islas in plea LS 1 5 2,Swoo Wry mat Sim Preparation ISl3 2^00 emoval and Ralikeenunt, amplate in Place WEZ&�dd�f�p LS 115 2,mK.00 M.500 pe and Irrigation Slaves-2-a- PVC, rm,pkte in place 18 60 $ 10.00 5600 d and Hydromulch, compkrc in plea BY 2,500 $ 0.60 $1.500 &Sedimant Control-SWPPP ImplennMtian&Maiatmma, Sib Seahmtam Ex' gad FWw etc. mm Ids in lea LS1 T 2,500.00 $2,500 8 Reeve Existing Lleb&Cmar LP 105 $ 10.00 $1,050 9 Remove P.xiding Sidewalk SP 510 T 2.50 $1,295 Ounmal Itand somma1 119,43 elrmtL nvtmwm law 10 Bxavation&Oredln .emoPltle in Place I M 1 S 12,000.00 1 S12,000 11 Mggg& Imomoratian ofliw 8" decN ampkle in phase SV 1 2,350 S 2.50 1 M,8I5 12 Hydreted Lime, complete in plea Ties 1 35 3 160.00 1 $5,600 13 q heJ Liwsthm Ban Notarial -8" thid complete iaplace SV 1,935 $ 13.50 $26,123 14 HMAC-Type D Pavewta3" thick - inclaics pin eat, empkte is plan BY1935S 534,MO 15 Comrete Cmb& Dumr(Standard), complete in puce LF$9,430 16 Can sxa 8hkvmik&Romps- 4" thick, complete in plea SP$21.470 gemRrad Cocnt 9avwoeM-Apmm- 6" Thik wl Morolilic Sgndam Curb mm Iele in lace SP$10,010 18 ADA Regain -Detectable Waving Sargon, chaplain in Place EA 32,400 StmlCaaalrvdion Items Submgl $127,738 Page 2 of 2 Slays Sewer Consonants Items l9 24"RCP Pipe, wmPlete io plea l9euc1un18nckfilU LF 1405 60.W $S,400 20 CuN least wide,uwnplebht piece EA 2 S i,800.W §5,fA0 21 lCurb lnbt. l0'wide, complain in phre Pd 2 S I,g00.o0 S].6W 22 lConscame Headwalls I EA 2 S 1,500.W S3,W0 2l JTV Testing mul impatient, compete in Fine, I LF 140 S 3.% §4W 91eru Sewer Cmnslruetion Items 5obmh $ZM1, Mbeanneos Items P Cootluil Por ElecMcal3:rvlce LS 1 $ 5,000.00MS7,5W 25 Conduit for Svcet Ligbb IS 1 $ I,000,00 26 Street Lights EA 3 $ 2,500.00fl SMetNomeSilnr LS 1 S 5000028 Pavement Mvkirgeeul SMping LS I S Ic000029 Conslmaion Woman Times LS 1 S 2.M.00Mlreebeom Hens Subbnl Cameral Ilene Subtotal 319,42E SInN Conslrualbt Items Sublonl SI22g315 Snrs Sewer Construction Items Subtotal 525,090 Mbvellnneem Items Subtotal $17,000 Cenenslbn Total sIg9,29 Performance and Payment Decades 2.5%) 94,751 15%Cendngsry RUBS Total&Omated Coat S222Jf2 Not Included, 1. Demolition & Modifications to Existing Parking tot, Driveways & Detention Pond 2. Removal Is Modifications t0 Existing landscaping & Irrigation System 3. Engineering, Surveying and Construction Management 4. Fees repilred for dedicator of additional right of way oremements by College Station Medical S. Indirect costs For planning and development JI�w tab I 9CHULR FNGMEOIEERING, LLC. Page 2 of 2