Loading...
HomeMy WebLinkAboutCost EstimatesRay Behling To: Kevin McGraw Cc: Jeff Helminski Subject: Hike & Bike Trail, College Station, TX The final cost forthe Hike & Bike Trail is as listed below. 1. Architectural Design $ 4,877.50 2. Civil Design $ 19,000.00 3. Construction $ 293,495.00 4. CVC Development fee $ 3,000.00 $ 320,372.50 R" ve"v Senior Development Manager Campus Village Communities 919 W University Drive, Suite 700 Rochester, MI 48307 (248) 609-0409 Direct (248)609-0438 Fax behlingr@cami)usvillage.com r 0 B R 1 E O'Brien & Assoc Inc 5310 Harvest Hill Suite 136 LB 161 Dallas, TX 75230 972-788-1010 CVCS, LLC Invoice number 29093-HRN-0610 Mr. Kevin McGraw Date 06/25/2010 Go Caddis Development Group 4520 N. Grand River Avenue Project: 29093 College Station Apartments Lansing, MI 48906 College Station, TX Billing period through 062010 DESIGN & STUDY OF MULTIPLE ALIGNMENT FOR THE HIKE/BI KE TRAILS ADDITIONAL SERVICES Additional Services Billed Hours Amount David Hoff Billable Time 47.50 2,375.00 Scott Speer Billable Time 38.50 2,502.50 ADDITIONAL SERVICES subtotal 86.00 4,877.50 Invoice total 4,977.50 DUE UPON RECEIPT THANK YOU CVCS, LLC Invoice number. 29093-HRN-0610 Invoice date: 06/25/2010 Page 1 ❑M❑ Kimley-Horn and Associates, Inc. CADDIS DEVELOPMENT GROUP ATTN: KEVIN T. MCGRAW 4520 N. GRAND RIVER AVENUE LANSING, MI 48906 Please send payments to: KIMLEY-HORN AND ASSOCIATES, INC. P.O. BOX 951640 DALLAS,TX 75395-1640 Federal Tax Id: 56-0885615 LUMP SUM KHA Ref # 064422500.1-4241327 Invoice No: Invoice Date: Invoice Amount: Project No: Project Name: Project Manager: Client Reference: 064422500-0710 Jul 31, 2010 $72,755.23 064422500 CAMPUS VILLAGE WILLIAMSON, SARAH For Services Rendered through Jul 31, 2010 Description Contract Value % Complete Amount Earned to Date Previous Amount Billed Current Amount Due TIA FOR REZONING 7,800.00 100.00% 7,800X0 7,800.00 0.00 PRELIMINARY ENGINEERING 7,500.00 100.00% 7,500.00 7,500.00 0.00 CITY SITE PLAN SUBMITTAL 28,000.00 100.00% 28,000.00 16,000.00 12,000.00 DRAINAGE DESIGN TECH. REPORT 6,000.00 100.00% 6,000.00 6,000.00 0.00 TxDOT DRIVEWAY PERMIT APPLICATION 20,000.00 100.00% 1 20,000.00 10,200.00 9,800.00 SITE CIVIL CONST. DOCUMENTS 78,000.00 100.00% 78,000.00 70,200.00 7,800.00 SWPPP 2,000.00 100,00% 2,000.00 2,000.00 0.00 RECORD DRAWINGS 2,000.00 0.00% 0.00 0.00 0.00 HIKE & BIKE TRAIL 19AM.00 100.00% 19,000.00 14,250.00 4,750.00 SIDEWALK & SS EXHIBITS 2,500.00 100.00% 2,500.00 0.00 2,500.00 DEVELOPMENT PERMIT INTERIM SUBMITTALS 3,000.00 100.00% 3,000.00 0.00 3,000.00 LOT LINE CHANGE 4,500.00 100.00% 4,500.00 0.00 4,500.00 OFFICE EXPENSE 6,012.00 100.00% 6,012.00 5,358.00 654.00 Subtotal 186,312.00 98.93% 184,312.00 139,308.00 45,004.00 Total LUMP SUM 45,004.00 COST PLUS MAX KHA Ref # 064422500.3-4241334 Description Contract Value. Amount Billed to Date Previous Amount Billed Current Amount Due REZONING SUBMITTAL 16,000.00 15,990.00 15,990.00 0.00 SUB/MTGS/APVLS/PERMIT 29,000.00 28,972.50 18,980.00 9,992.50 FRANCHISE UTILITY COORD. 5,000.00 4,990.00 2,460.00 2,530.00 OFFICE EXPENSE 1,500.00 : 1,512.80 1,497.20 15.60 Subtotal 51,500.00 ! 51,465.301 38,927.201 12,538.10 Amount in Excess of Contract Value (12.80) 0.00 (12.80) Total Amount Billable 51,452.50 38,927.20 12,525.30 If you have questions or mncems regarding dris invoice, please call Jason A/corn at (977) 770-1386. 6VM 1 ANDRES CONSTRUCTION SERVICES Campus Village College Station Hike & Bike Trail ! Actual Construction Cost 8/1/2011 Item # Description Unit QQt rr Unit Cost Cost 1 Surveying Hrs 65 $125.00 $8,088 2 Earthwork / demo SF 28,582 $0.17 $4,999 3 Erosion control rip rap on creek bank SF 660 $12.18 $8,040 4 50% Campus Village retaining walls ($62,560 total) LF 286 $109.37 $31,280 5 Creek side retaining wall LF 221 $96.31 $21,285 6 50% Retaining wall railing ($16,445 totaq LF 227 $36.21 $8,220 7 Concrete trail SF 28,582 $3.99 $114,000 8 Scored and stained concrete at ramps / crosswalks SF 3,500 $5.03 $17,600 9 Common bermuda hydromulch SF 36,199 $0.10 $3,620 10 Decomposed granite Q 4" depth Ton 25 $138.00 $3,450 11 Filter fabric SF 1,285 $0.50 $643 12 Curlex SF 2,418 $0.25 $605 13 Landscape mobilization / Install EA 1 $2,500.00 $2,500 14 Temp. irrigation EA 1 $9,971.00 $9,871 15 Trail signage EA 15 $312.65 $4.690 16 Fitness equipment EA 1 $23,043.81 $23,044 Subtotal $261,933 Contractor OH & Indirect Expenses $20,955 Contractor Fee $10,608 Total Cost $293,495 3710 RAWLINS SUITE 1510, DALLAS, TEXAS, 75219 (214) 521-2118 fax (214) 521-4620 e-mail: mail@andresconstmction.com