HomeMy WebLinkAboutMisc.Subcontract for Stepping Stone School 2020-30-8440-11280
BRAZOS VALLEY LANDSCAPES
P.O. Box 9922
College Station, Texas 77842
Attention: Jacob Maxwell
(979) 690 9086
Complete the landscape and irrigation Work including items incidental to Work as more particularly
described on the Plans and Specifications and additional descriptions as set forth on SCHEDULE I,
SCHEDULE II, and SCHEDULE III, attached hereto and made a part hereof.
See SCHEDULE I, Plans and Specifications, attached hereto and made a part hereof.
See SCHEDULE II, Special Provisions, attached hereto and made a part hereof.
See SCHEDULE III, Project Schedule, attached hereto and made a part hereof.
Fifteen thousand six and 41/100 dollars ($15,006.41).
SCHEDULE II
7. This subcontract includes the following items:
Via. Landscape materials and labor per the plans.
fib. Steel Edging
/c. Landscape Bed Mix
d. Fill and Landscape Bed Mix for planter box along back property line.
ve. Mulch for beds.
*'f. Crushed Granite and fabric underlayment on west side of building.
-/g. Bull Rock and fabric underlayment.
,'h. Stone Retaining wall and landscape mix at front of building.
-/L Boulders
.1j. Six inch (6") diameter drain line with adapters for downspouts per plan.
,/k. Irrigation design and Materials and installation.
If I. Warranty
8. This subcontract does not include the following items:
a. Water Meter
b. 120 Volt Power outlet for irrigation controller.
10. Subcontract Amount derived as follows:
a. Landscape Work $ 10,259.96
1. Sales Tax on Landscape Work $ 846.45
b. Sleeves $ 600.00
c. Irrigation— Design & Completion $ 3,300.00
1. Sales Tax on Sleeves & Irrigation <included>
Subcontract Amount $ 15,006.41
Plans Sent:
• LS.1, Dated 12/2/11
• A0.01, Dated 2/27/12
• South Sidewalk Landscaping Revision, Dated 1/16/12
• Roof Drainage Plan, Dated 3/8/12
Completion Date: 5/7/12
PHILLIPS PAINTING CO.
407 W. THIRD ST.
BRENHAM, TEXAS 77833
(979) 836-9027 • Fax: (979) 836-8526
479_ 203-3600
Proposal Submitted To:
Name
Street.
City _
State _
Phone
propose
PROPOSAL
Work To Be Performed At:
Street
City State
Date of Plans
All me rial is guaranteed to be as specifie , and the above or to be pe ormed in accordance with the drawings
and specifications submitted for above work and completed in a substantial workmanlike manner for the sum of
Dollars [$ .4�a'� j
with payments to be made as follows: i�/ta--'�1 t%��.c?� N'
647. )� 14
H3 T7. S
Any alteration or deviation from above specifications involving extra
costs, will be executed only upon written orders, and will become an
extra charge over and above the estimate. All agreements contingent
upon strikes, accidents or delays beyond our control. Owner to carry
fire tornado and other necessary insurance upon above work. Work-
men's Compensation and Public Liability Insurance o abo a work to
be taken out by ���'
Respectfully submitted
Per
Note -This proposal my be withdrawn by us if not accepted
within days.
ACCEPTANCE OF PROPOSAL
The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do
the work as specified. Payment will be made as outlined above.
Signature
Dafe Signature
23 May. 2012
All Pets Medical and Laser Hospital located at 111 Rock Prairie Road, and t,epping Stone School located at205
Rock Prairie Road hereby agree that the following work will be completed by Stepping Stone School to the.
satisfaction of both partiesmentionedherein..
1.) Stepping Stone School will demolish and dispose of the entire section of existing treated wood fence along the
property line shared by All Pets Medical and Laser Hospital and Stepping Stone School
2.) Stepping Stone School will remove and dispose of the existing oak tree straddling the property line of All Pets
.Medical and Laser Hospital and Stepping Stone School.
3.) Stepping Stone School will construct a continuous six (6) foot high wood fence consisting of 2 sides cedar
pickets and steel posts extending approximately 114' in the direction of Rock Prairie Road from the existing corner
of Stepping Stone School's vinyl fence and along the shared, property line.
4.) Stepping Stone School will return the portion of their site abutting the aforementioned 114' of new fencing to
the pre -construction grade; or lower; and will ensure that there are no gaps along the underside or portions of the
new construction fencethat would jeopardize All Pets ability to provide boarding and treatment services. Apr
The above mentioned work will be completed byStepping Stone School or Its agents on or before June Sth, 2012.
Upon satisfactory completion of all work, All Pets Medical and Laser Hospital will reimburse Stepping:Stone School
the sum of $558 (USD).
By agreeing to the above, All Pets Medical and Laser Hospital agrees to release any claims with the City of College
Station or its agents that would delay the issuance of a Final Certificate of Occupancy for the work completed at
205 Rock Pr irie Road.
ri-4,
Daniel Tur r, Stepifiing Stone School All P led cal and Laser Hospital
o '
Date Title
Date