Loading...
HomeMy WebLinkAboutMisc.Subcontract for Stepping Stone School 2020-30-8440-11280 BRAZOS VALLEY LANDSCAPES P.O. Box 9922 College Station, Texas 77842 Attention: Jacob Maxwell (979) 690 9086 Complete the landscape and irrigation Work including items incidental to Work as more particularly described on the Plans and Specifications and additional descriptions as set forth on SCHEDULE I, SCHEDULE II, and SCHEDULE III, attached hereto and made a part hereof. See SCHEDULE I, Plans and Specifications, attached hereto and made a part hereof. See SCHEDULE II, Special Provisions, attached hereto and made a part hereof. See SCHEDULE III, Project Schedule, attached hereto and made a part hereof. Fifteen thousand six and 41/100 dollars ($15,006.41). SCHEDULE II 7. This subcontract includes the following items: Via. Landscape materials and labor per the plans. fib. Steel Edging /c. Landscape Bed Mix d. Fill and Landscape Bed Mix for planter box along back property line. ve. Mulch for beds. *'f. Crushed Granite and fabric underlayment on west side of building. -/g. Bull Rock and fabric underlayment. ,'h. Stone Retaining wall and landscape mix at front of building. -/L Boulders .1j. Six inch (6") diameter drain line with adapters for downspouts per plan. ,/k. Irrigation design and Materials and installation. If I. Warranty 8. This subcontract does not include the following items: a. Water Meter b. 120 Volt Power outlet for irrigation controller. 10. Subcontract Amount derived as follows: a. Landscape Work $ 10,259.96 1. Sales Tax on Landscape Work $ 846.45 b. Sleeves $ 600.00 c. Irrigation— Design & Completion $ 3,300.00 1. Sales Tax on Sleeves & Irrigation <included> Subcontract Amount $ 15,006.41 Plans Sent: • LS.1, Dated 12/2/11 • A0.01, Dated 2/27/12 • South Sidewalk Landscaping Revision, Dated 1/16/12 • Roof Drainage Plan, Dated 3/8/12 Completion Date: 5/7/12 PHILLIPS PAINTING CO. 407 W. THIRD ST. BRENHAM, TEXAS 77833 (979) 836-9027 • Fax: (979) 836-8526 479_ 203-3600 Proposal Submitted To: Name Street. City _ State _ Phone propose PROPOSAL Work To Be Performed At: Street City State Date of Plans All me rial is guaranteed to be as specifie , and the above or to be pe ormed in accordance with the drawings and specifications submitted for above work and completed in a substantial workmanlike manner for the sum of Dollars [$ .4�a'� j with payments to be made as follows: i�/ta--'�1 t%��.c?� N' 647. )� 14 H3 T7. S Any alteration or deviation from above specifications involving extra costs, will be executed only upon written orders, and will become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry fire tornado and other necessary insurance upon above work. Work- men's Compensation and Public Liability Insurance o abo a work to be taken out by ���' Respectfully submitted Per Note -This proposal my be withdrawn by us if not accepted within days. ACCEPTANCE OF PROPOSAL The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. Signature Dafe Signature 23 May. 2012 All Pets Medical and Laser Hospital located at 111 Rock Prairie Road, and t,epping Stone School located at205 Rock Prairie Road hereby agree that the following work will be completed by Stepping Stone School to the. satisfaction of both partiesmentionedherein.. 1.) Stepping Stone School will demolish and dispose of the entire section of existing treated wood fence along the property line shared by All Pets Medical and Laser Hospital and Stepping Stone School 2.) Stepping Stone School will remove and dispose of the existing oak tree straddling the property line of All Pets .Medical and Laser Hospital and Stepping Stone School. 3.) Stepping Stone School will construct a continuous six (6) foot high wood fence consisting of 2 sides cedar pickets and steel posts extending approximately 114' in the direction of Rock Prairie Road from the existing corner of Stepping Stone School's vinyl fence and along the shared, property line. 4.) Stepping Stone School will return the portion of their site abutting the aforementioned 114' of new fencing to the pre -construction grade; or lower; and will ensure that there are no gaps along the underside or portions of the new construction fencethat would jeopardize All Pets ability to provide boarding and treatment services. Apr The above mentioned work will be completed byStepping Stone School or Its agents on or before June Sth, 2012. Upon satisfactory completion of all work, All Pets Medical and Laser Hospital will reimburse Stepping:Stone School the sum of $558 (USD). By agreeing to the above, All Pets Medical and Laser Hospital agrees to release any claims with the City of College Station or its agents that would delay the issuance of a Final Certificate of Occupancy for the work completed at 205 Rock Pr irie Road. ri-4, Daniel Tur r, Stepifiing Stone School All P led cal and Laser Hospital o ' Date Title Date