Loading...
HomeMy WebLinkAboutStaff CommentsY CITY OF COLLEGE STATIODI 'Rome ofTexrtrAdM Univeriiy' 1101 Texas -Avenue, P.O. Box 9960 - College Station, Texas 77842 Phone 979.764.3670 / Fax 979.764.3496 - MEMORANDWM July 21, 2011 / 2 TO: Jason Fikes, via email: Lson(cDamchurch.net�/ FROM:Molly Hitchcock, AICP Planning Administrator SUBJECT: LINCOLN HOUSE OF HOPE (9P) I reviewed the above -mentioned SITE PLAN -COMMERCIAL application and determined it to be incomplete. The following is the preliminary list of items needed to complete the submittal so that staff. may conduct a thorough review. Please submit the following information by 10 a.m. on any Monday for review that week: A complete Non -Residential Architectural Standards Building Review Application and. fee. ,The meritorious modifications' granted for the building through the PDD rezoning will be incorporated into the architectural review, A complete Development Permit Application and fee. The Development Permit application is part of the. Site Plan application.. In addition, to the fee, the following is still required to complete the development permit portion: The Property Owner's.certification onPage4 of 11 of the application, •. A letter claiming exemption to the drainage report. Note: the grading plan was not submitted with this application. This information will be required with the first round of staff review comments. Please be aware that if1his application is not completed before September 2, 2011, it will expire and a. new application and fees will be necessary to continue the site planning process. If you have any questions or need additionaHnformation, please call me at 979.764.3570:.. cc: Jeff Robertson, McClure &.Br ne:Engineering/Surveying, Inc., via email: ieffr(o)mcclurebrowne.com Brazos Valley Community Service Center,. via mail Case file No. 11-00500108 I 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM July 29, 2011 TO: Jason Fikes, via email: jasonCcr�amchurch.net 1' 20 FROM: Matt Robinson, AICP, Senior Planner SUBJECT: LINCOLN HOUSE OF HOPE (SP) Thank you for the submittal that completes your SITE PLAN - COMMERCIAL application. This project will be distributed to staff next week for their review. cc: Jeff Robertson, McClure & Br�pe Engineering. Surveying, Inc, via email 0effr@mcclurebrowne.com �,1 Brazos Valley Community Service Center, via Case file no. 11-00500108 ✓ Case file no. 11-00500117 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 CITY of COU.I iGH STATION Hon" op Ab mn.Iv MEMORANDUM August 9, 2011 C-� \ 1 TO: Jason Fikes, via email: iason(cDamchurch.net/ Crl/ FROM: Matt Robinson, AICP, Senior Planner SUBJECT: Lincoln House Of Hope (SP) - Site Plan Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by any Monday at 10:00 a.m. for further staff review: City of College Station Transmittal Letter; Memo providing written responses to all of staff's comments (identify the specific page that each comment was addressed on or the reason for not addressing the comment); Two (2) revised site plans; One (1) landscaping plan; One (1) 11x17 grading and erosion control plan; Easement Dedication Sheet and required documents (please note that the Site Plan will not be stamped approved until the Blanket Easement, or all other appropriate easements, have been dedicated to the City of College Station). Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please contact Matt Robinson at 979.764.3570. Attachments: Staff review comments PC: Jeff Robertson, McClure and Brown Engineering via em I: IeffrOmcclurebrowne.corr / Dale Christian via email: DaleO,'effersonchristian.net � Brazos Valley Community Service Center, via mail Case file #11-00500108 STAFF REVIEW COMMENTS NO. 1 Project: Lincoln House Of Hope (Sp)—11-00500108 PLANNING 1. Provide the topography on the site plan. 2. Provide building height. 3. Provide a note stating that the building will not be sprinkled. 4. Provide a note that all signs are permitted separately. 5. Please label the proposed fence as a 6' wood cedar fence as identified in the PDD zoning ordinance. 6. Provide a general note on the site plan that all roof and ground -mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right-of-way or residential district within 150' of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance. 7. Provide a general note that decorative lighting is permitted on the structure. 8. Provide a general note on the site plan that states the following: Site lighting will meet the standards of Section 7.10 of the Unified Development Ordinance. The light source shall not project below an opaque housing and no fixture shall directly project light horizontally. Fixtures will be mounted in such a manner that the projected cone of light does not cross any property line. 9. Please contact Raymond Olson in the Fire Marshall's Office for any fire related comments. 10. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not be made of aware of will constitute a completely new review. Reviewed by: Matt Robinson Date: 8/9/11 LAN DSCAPI NG/STREETSCAPING/BU FFER 1. Show existing vegetation along northern property line. It was identified in the PDD zoning ordinance that the existing vegetation would be preserved and utilized as a buffer. 2. Minimum landscape point requirements for any development is 800 points. There are currently only 660 being provided. 3. Per the PDD zoning ordinance, buffer plantings should be provided where physically possible. This would include along the southern property line and the rear yard. 4. 5. Provide a general note that 100% coverage of groundcover, decorative paving, decorative rock (not loose), or a perennial grass is required in parking lot islands, swales and drainage areas, the parking lot setback, rights -of -way, and adjacent property disturbed during construction. Reviewed by: Matt Robinson Date: 8/9/11 Page 2 of 3 ENGINEERING COMMENTS NO. 1 1. Please label the slope of the sanitary sewer service line. 2. Please label the existing sanitary sewer cleanout. 3. The minimum sanitary sewer commercial lead size is 6-inch. 4. Please label the existing water meter size. 5. Please provide a fire flow letter. 6. The minimum radius on the driveway is required to be 25'. 7. Please add the Commercial Driveway standard detail (ST2-03) to the site plan. Reviewed by: Erika Bridges Date: 8/8/11 SANITATION 1. Sanitation assumes this location will utilize a 90 gallon roll -out container. Reviewed by: Wally Urrutia Date: August 4, 2011 TxDOT Comments 1. No Comment (off state system, no anticipated impact) Reviewed by: Chad Bohne Date: August 2, 2011 1101 Texas Avenue, P.O. Box 9960 1/ College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 (Yrr uo Col f j o 3vcru>x rr�„ �� �r�.r n;m,,..nr 1._.r *-1koil] r August 17, 2011 \ TO: Jason Fikes, via email: Jason@amchurch.net 1� FROM: Matt Robinson, AICP, Senior Planner \� v SUBJECT: Lincoln House Of Hope (Sp) - Site Plan Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. The next submittal will be the third and final review by staff for this round of reviews. If all items have not been addressed on the next submittal, another $932 processing fee will need to be submitted for the subsequent set of three (3) reviews. Please address the comments and submit the following information by any Monday at 10:00 a.m. for further staff review: City of College Station Transmittal Letter Eight (8) complete sets of site civil construction documents for the proposed development with the revised site and landscaping plans attached (one set will be returned to you, please submit additional copies if you want more than one approved set) One (1) revised site plan Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Jeff Robertson, McClure and Brown Engineering via email: ieffr(a),mcclurebrowne.com i O Dale Christian, via email: dale(c)'effersonchristian.net I/ Brazos Valley Community Service Center, via mail Case file #11-00500108 STAFF REVIEW COMMENTS NO. 2 Project: Lincoln House of Hope (Sp) - 11-00500108 PLANNING 1. Its unclear which plantings currently exist on site and which are proposed. Additionally, it's unclear what is being utilized for landscaping points or for buffering. A landscape legend should also be provided for any buffering plants/trees. 2. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. Reviewed by: Matt Robinson Date: 8/16/11 ENGINEERING 1. The Water Demands listed in Note #3 seem a bit low. Please calculate the demand using the Fixture Units instead. 2. In addition to the Fire Flow Test data already provided, please submit a letter indicating what the fire flow requirement is per the 2009 IFC. Reviewed by: Erika Bridges Date: 8/16/11