Loading...
HomeMy WebLinkAboutWater and Sewer System ReportWater and Sewer System Report for Greens Prairie Center, Phase 1 College Station, Texas June 2006 Prepared By: Civil Development, Ltd. 2900 Longmire Drive, Suite K College Station, Texas 77845 (979) 764-7743 General Information Location: Land Use: Design Criteria Greens Prairie Center, Phase I is a 5.8 acre tract located on the north side or new Arrington Road near its intersection with SH 40. It encompasses a sin gle, undivided lot. Water service will be provided by Wellborn Special Utility District and sewer service will be provided by the City of College Station. Commercial -Office WATER SYSTEM ANALYSIS Primary Water Supply: Existing 16" line along Anington Road (Wellborn SUD) Domestic Demand: Avg. Pop Density: Daily Flow: Working Day: Average Flow: Peaking Factor: Peak Flow: Fire Demand: Fire Flow: Pipe: Roughness Coeff: Hydraulic Software: 30 persons/acre 50 gpd/cap x 30 persons/ac x 5.8 acres= 8700 gpd 10 hrs 14.5 gpm 4 58 gpm 2500 gpm PVC DR-14 C909 150 (Hazen Williams) Haestad Methods WaterCAD v.6.0 Existing City System Pressure Tests Flow Hydrant#: Ex. Hydrant at Greens Prairie Rd/Arrington Road intersection Flowrate: 3300 gpm Static Pressure: 70 psi (162 ft water) Residual Pressure: 65 psi (150 ft water) Applicable Exhibits: Exhibit B -Flow Test Report Water System Analysis Summary Criteria Required Min. Pressure -fire (psi) 20 Max. Velocity (fps) 12 Max. Length of 6" pipe (ft) (connected to~ 8 "on both 1500 ends) Max Length of 6" pipe (ft) 800 (not connected on both ends Max. Length of 3 "pipe (ft) 500 Applicable Exhibits: Exhibit A -Water System Schematic Exhibit C -Summary of Results Conclusion As Location Desi ned 65 GPCl FHl 7.26 P-1 NA NA NA The proposed water system fo r Greens Prairie Center, Phase I meets or exceeds all or the design criteri a for the City of College Stati on. It will provide <1dcqualL· \\«ltcr pressure and now ror co111111ercia I and fire demands. ,• SEWER SYSTEM ANALYSIS Design Criteria: Primmy Sewer Outfall: 8" sewer line along Greens Prairie Road Domestic Demand: Avg. Pop Density: Average Flow: Peaking Factor: Pipe: Applicable Exhibits: Conclusion: 2.67 people per lot 100 gpd/cap or 267 gpd per lot 4 PVC 03034 SOR 26 Exhibit D -Sanitary Sewer Analysis Spreadsheet The sewer system that will serve Greens Prairie Center, Phase 1 is simply an extension of the existing 8" City line on Greens Prairie Road. When Phase 1 develops, it will be the only significant user on the system. There is plenty of capacity in the line to serve this development and subsequent projects in the area. " .· Exhibit A Greens Pruirie Center Ph 1 w °' ter SysteM ScheMu tic GPCl 01 <(/'\ GPCl FHl Tested Hydrunt Exhibit B Water System Flow Test Report Date: June 29, 2006 Water System Owner: Wellborn Special Utility District Development Project: Greens Prairie Center, Phase 1 Flow Test Location:, Existing fire hydrant at Greens Prairie/Arrington Rd intersection Nozzle size (in.): 5 Discharge Coef: (c): 0.9 ---- Pitot Reading (psi): 25 2 1/2 Flowrate fommla: Q=29.84cd p c =discharge coef. d =orifice size (in) p = pitot pressure (psi) Flowrate (gpm): 3357 computed -------- Pressure Guage Location: Adjacent residence (1775 Greens Prairie Rd.) Static (psi): 70 Residual (psi): 65 Report prepared by: Kent Laza printed name Others present: Steven Cast ---~~~~~~~~ ' ' Label P-1 P-2 EXHIBIT C Greens Prairie Center, Phase 1 Water System Analysis -Summary of Results June 29, 2006 Pipe Summary Length Diameter I Hazen-Williams Discharge Material (ft) (in) c (gpm) 124 12 I PVC 150 2,558.00 253 12 PVC 150 58 Junction Summary Label Elevation I Demand Hydraulic Grade I Pressure (ft) (gpm) (ft) (psi) GPC1 01 300 I 58 452.37 I 65.92 GPC1 FH1 301 2,500.00 452.37 65.49 I Velocity I (ft/s) i 7.26 ' 0.16 Lml· Arca of Contributing Lond Uses ! : I g ~ I ~ N .., 15 - I -8 . 0 E I -' "' ~ ~ ..: .. ·~ ~ -~ ~ " I .~ "'u " 8 z" ...... ti F11Ull fo ~ ~ s ~~ ·~ !'8 ~ ... :; ~~ "" ... :::> 0 .:.; ~ ~o ~Q ... ... 'S g z g> c c ~ : <ii <ii <ii 0 l5.:: ..: u 267 I 401 I S34 801 ISOO JS GPD per GPD per GPD per GPO per GPO per GPDper \Ill, MH # Lot I Acre Acre Acre Acre Penon GPD I ----·-- \ B 0 0 I 0 0 S.8 0 8,700 . -; I -· __ l I ·-· I ··---·---i---_l_ --~ I I i ·----·---- -;---: Exhibit D Greens Prairie Center, Phase 1 Sanitary Sewer Analysis June 29, 2006 Flow Calculations A vernge Doily Infiltration Peaking Peale ln5idc Size Material Flows (ADF) (10%ADF) Factor Flows Diameter GPD CFS CFS CFS (in.) inches 8,700 O.OJ3S 0.0013 4.00 0.06 8 03034 7.7S4 Manning Min. Friction Design Slope Slope ADF ADF "lo •;. 0.0007 0.40 .. ~ • Pi>< Calculations I MonnlnK Actual Min. Slope for Ave. Daily Daily friction Design Pipe Peale I Peak Ave. Existing Slope Slope Slope Flow flow Flow Flow or Check i Velocity I Velocity Depth Peale Peale Designed Dep1h Flows Flows Systems I i I I fps Inches "lo I % % I fos Inches I I LJ7 0.00 0.0024 i 0.40 1.00 OK l 1.71 I 0.78 I ! I I I ! i I I I i I I i I i i I i I