Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Cost Estimate
GREENS PRAIRIE CENTER, PHASE 1 ENGINEER'S ESTIMATE June 30, 2006 Item I Description ~------j Estimatej U . J U . p . Q . mt mt nee uanttty ---------------· --I Estimated Cost General Sitework 1 Mobilization/Construction Staking 2 Silt Fence I LS 10,000.001 275 LF 3.50 Subtotal -Water Off-Sitej 10,000 963 $10,963 Water System (installed for fire flow test) 3 12" Water Line, C909, CL 200, non-structural 20 LF 150.00 3,000 4 Fire Hydrant 1 EA 2,500.00 2,500 5 16"x 12" Tapping Sleeve & Valve 1 EA 6,500.00 6,500 Subtotal -Waterj $12,000 Water System (new construction) 6 12" Water Line, C909, CL 200, structural 40 LF 65.00 2,600 7 12" Water Line, C909, CL 200, non-structural 230 LF 60.00 13,800 8 12" Water Line, DIP, CL 350, structural 60 LF 95.00 5,700 9 12" Water Line, DIP, CL 350, non-structural 50 LF 85.00 4,250 10 20" Steel casing (w/cascade carriers) 60 EA 200.00 12,000 ----- 11 Remove/Relocated Fire Hydrant (w/new tee, valve, & fittings) 1 EA 1,500.00 1,500 12 12" M.J. Gate Valve 3 EA 1,600.00 4,800 13 12"x 12" M.J. Tee 1 EA 750.00 750 14 12"x 11.25° M.J. Bend 5 EA 500.00 2,500 15 12"x 13" M.J. Anchor Couplings 2 EA 250.00 500 . f-· 16 12" M.J. Cap 1 EA 200.00 200 17 4" Blow Off Assembly 1 EA 1,000.00 1,000 Subtotal -Water Off-Sitej $49,600 Sewer 18 8" Sewer SDR 26 D-3034 -structural 65 LF 60.00 3,900 19 8" Sewer SDR 26 D-3034 -non-structural 40 LF 55.00 2,200 20 Manholes -10.01' -12.00' Depth 1 EA 3,000.00 3,000 21 Drop Structure (approx 8.5 ft, connect to existing 24' deep MH) 1 LS 3,500.00 3,500 22 TV Inspection 105 LF 10.00 1,050 Subtotal -Sewer! $13,650 I TOTAL CONSTRUCTION! $86,213 Pane 1 of 1