Loading...
HomeMy WebLinkAboutSewer System AnalysisSEWER SYSTEM ANALYSIS FOR SONOMA SUBDIVISION l4B 11 11 COLLEGE STATION, TEXAS JUNE2007 MBESI# 1053-0005 ...,,, .... ,,,,,, ---~"~OF r~ ''' .: '\II'-·•······•· ....... '•, : '"::> •• ···~····."""IS' l , ... ·· ~1 ··. if,, [j~~-:1~.L~·Ro~~·a~·~ ,. ..... , ................................. ~ ~ ~\ 94745 /re 1 l1 >!o... ..)f! ~ I ·. (. ".·~ ... 11 ~ •• •• (.CENS~~··· ~E ·~~A~-­w:ff1J! McCLURE & BROWNE ENGINEERING/SURVEYING, INC. 1008 Woodcreek Drive, Suite 103 •College Station, Texas 77845 (979) 693-3838 • Fax: (979) 693-2554 •Email: McClureBrowne@Verizon.net SEWER SYSTEM ANALYSIS FOR OFFSITE SEWER LINE General Information Approximate area to be served by this line: 761 acres Anticipated land use: Single family residential Commercial (C-3) Future High School Number of platted lots: 458 lots Notes on surrounding development: This proposed sewer line is intended to serve the upper portions of the spring creek sewer basin. Currently a portion of this drainage basin is single family residential housing in the Sonoma Subdivision. The future land use for the basin includes single family housing, small tracts of light commercial (C-3), and a future high school for College Station ISD. Primary outfall line: Software model: Average daily flow: Peaking factor: Pipe Material: Manning's N value: Note about Future Extension: Sewer System Analysis An existing 21" sewer line located south of the existing Reatta Meadows subdivision. Microsoft EXCEL Spreadsheed based on Manning's Equation 267 gpd per existing or platted residential lots 1335 gpd per acre for undeveloped residential land use (5 lots/acre) (this assumes a higher density than any of the existing residential developments in the surrounding area) 1050 gpd per acre for school (35 per/acre) 750 gpd per acre for commercial (25 per/acre) 4.0 PVC (D3034) & DIP 0.013 The calculations shown in this report assume that the entire area shown on the drainage area map (Exhibit A) will be sewered through this line, however approximately 200 acres of this area naturally drains back to the west towards FM 2154. The future sewer line extension shown on Exhibit A is a possible route for the future line. Assuming that the 15" line is extended along this route with a 0.25% slope and manholes every 500' with a 0.1' drop in each one, the line would be approximately 8' deep at its termination adjacent to FM 2154. Since a large portion of the proposed sewer drainage area lies on the west side of the drainage divide, parts of the 15" line will require cuts in excess of 35' in order to extend this line. Sonoma Subdivision Off-Site Sewer Line Report MBESI #10530005 Spreadsheet Notes: Conclusion: Applicable Exhibits: Exhibit A Exhibit B The spreadsheet in Exhibit A computes the anticipated flowrates from each area and the minimum slopes of the lines that serve those areas. It compares the computed slope with the required minimum slope and the design slope from the plans (when available). If the computed slope is less than the minimum or less than the design slope, the spreadsheet indicates the line is "OK". If not, it indicates the line is "Flat". All of the lines in the spreadsheet on Exhibit A indicate they are OK and thus meet the design guidelines of the City of College Station. Therefore, we conclude that the lines are adequately sized and will easily carry the sewage flows that are expected to pass through them. Schematic Sewer System Layout Sewer Model Spreadsheet Sonoma Subdivision Off-Site Sewer Line Report MBESI #10530005 Linc .§ ~ ~1 B ~~ ~3 -8 f;: z ~ 1l 8 ] z -8 . .§ ~ From To <a 1l "' g. "" ~ ~o ~ Pl jz ..5 b c .!! .if .s j :3-]~ "' "' c 0 p,; e. f;: () ] 267 1335 35 25 OPDper OPDper OPDper OPD per MH# MH# Lot Acre Per.son Per.son OPD I 2 26 330 0 0 447,492 2 3 0 70 0 0 93,450 447,492 3 4 165 17 0 3.88 66,847 540,942 4 El 0 18 64 0 26,270 607,789 El E2 267 17 0 3.8 94,079 634,059 Exhibit B Spring Creek Sanitary Sewer Extension Sanitary Sewer Analysis Flow Calculations Manning Min. Average Daily Flows Infiltration Peaking Peek Inside Friction Design Size Material (ADF) (IOo/oADF) Factor Flows Diameter Slope Slope ADF ADF OPD CFS CFS CFS (in.) Inches o/o o/o 447,492 0.6924 0.0692 4.00 2.84 15 D3034 14.124 0.0762 0.15 540,942 0.8369 0.0837 4.00 3.43 18 DIP 18.88 0.0237 0.20 607,789 0.9404 0.0940 4.00 3.86 18 DIP 18.88 0.0299 0.20 634,059 0.9810 0.0981 4.00 4.02 18 DIP 18.88 0.0325 0.20 728,138 1.1266 0.1127 4.00 4.62 21 D2241 20.25 0.0295 0.20 Pipe Calculations Manning Min. Ave. Daily Ave. Daily Friction Design Flow Flow Slope Slope Velocity Depth Peek Peek Flows Flows fps Inches o/o o/o 2.43 4.24 0.2645 0.26 2.62 3.78 0.0822 0.20 2.68 3.78 0.1038 0.20 2.74 4.72 0.1130 0.20 2.22 5.06 0.1025 0.20 Actual Slope for Existing Pipe Peek Peek Slope Flow Flow or Check Velocity Depth Designed Systems o/o fps Inches 0.35 OK 3.37 9.89 0.40 OK 3.78 8.50 0.40 OK 3.89 9.44 0.40 OK 3.94 9.44 0.20 OK 3.12 12.15 I 0530005-0ff-site Sower Line.xls 6/1/2007 ExhibiLB