July 2, 2007
McCLURE & BROWNE ENGINEERING/SURVEYING, INC.
1008 Woodcreek Drive, Suite 103 •College Station, Texas 77845
(979) 693-3838 •Fax: (979) 693-2554 •Email: McClureBrowne@Verizon.net
Mr. Alan Gibbs, P.E.
Senior Assistant City Engineer
City of College Station
Post Office Box 9960
College Station, Texas 77842
Re: Sonoma Subdivision, Phase 2 -Oversize Participation Request
Dear Alan:
On behalf of the owner, BCS Development Co., I wish to request Oversize
Participation by the City of College Station for costs associated with the development of
Sonoma Subdivision, Phase 2. The City's Master Utility Plan shows a 24" water line to
be extended along the east side of William D. Fitch Parkway. This letter is to request
oversize participation from the City for the cost difference between the 24" water line and
an 8" water line which would normally be required for this development.
Accompanying this letter are two exhibits. Exhibit A is a copy of the output file
from a KYPIPES computer model of the Sonoma Subdivision. It is the same model as
submitted with the Water Report for the subdivision except a segment of the water line
along William D. Fitch Parkway is changed from a 24" to an 8" diameter (Pipe No 22).
The model shows that the lowest pressure in the system with the 8" line is 78 psi under
fire flow conditions. This exceeds the minimum pressure of 20 psi required by TCEQ.
This proves that the system performs adequately with the 8" line.
Exhibit B is a worksheet that computes the differential cost between the 24" and
the 8" water line. That difference is $145,855.50. This number is value of the oversize
participation the owner is requesting from the City. We recognize that the following
items will be required as well:
• Payment & Performance Bonds
• Copy of Corporate Resolution
• Copy of Current Deed
• Copy of Title Policy
If you need additional information, please contact me at your convenience.
Sincerely, lr;{"~~.E. ~esident -Engineering
xc: Mr. Randy French, BCS Development Co .
attachments
F:\1053 -Randy French\0005-Sonoma Development\Docs\Phase Two\OP Request\COCS -Gibbs01 -OP Request.doc
118
111
McCLURE & BROWNE ENGINEERING/SURVEYING, INC.
1008 Woodcreek Drive, Suite 103 •College Station, Texas 77845
(979) 693-3838 •Fax: (979) 693-2554 •Email: McClureBrowne@Verizon.net
EXHIBIT A
F:\1053-Randy French\0005-Sonoma Development\Docs\Phase Two\OP Requesl\COCS -Gibbs01 -OP Request.doc
Fire Flows
w/8" Water Line along
William D. Fitch Parkway
K Y P I P E 4
Univer~ity of Kentucky Network Modeling Software
Copyrighted by KYPIPE LLC
Veroion 3 -11/01/2005
Date & Time: Thu Jun 28 14:32:16 2007
INPUT DATA FILENAME --------------F: \ 1053-R-l \ 0005-S-l \Docs\PHJ\SET-1\OPREQU-1\8-in. DT2
TABULATED OUTPUT FILENAME --------F: \ 1053-R-l \ 0005-S-l \Docs\PHJ\SET-1\OPREQU-1\8-in.OT2
POSTPROCESSOR RESULTS FILENAME ---F: \ 1053-R-l \ 0005-S-l \Docs\PHJ\SET-1\OPREQU-1\8-in. RS2
S U M M A R Y 0 F 0 R I G I N A L D A T A
U N I T S S P E C I F I E D
FLOWRJ\TE . • • • • • . • • • • . • gallons/minute
HEAD (HGL) • • • . . • . . • . -feet
PRESSURE . . • • . • • • • • • . • psig
P I P E L I N E D A T A
STATUS CODE: XX -CLOSED PIPE CV -CHECK VALVE
NODE NAMES LENGTH DIAMETER ROUGHNESS MINOR P I P E
N AM E #1 #2 (ft) (in) COEFF. LOSS COEFF .
P-1 J-19 J-827. 77 18. 00 130.0000 1. 21
P-2 J-3 J-316. 70 8 . 00 140.0000 0.57
P-3 J-3 J-341. 31 8.00 140. 0000 0.17
P-4 J-4 J-6 310.21 8. 00 140.0000 0.17
P-5 J-5 J-17 320. 89 6 .00 14 0.0000 0 .17
P-6 J-5 J-8 426.00 6 . 00 140.0000 1. 44
P-7 J-6 J-13 305.52 8 .00 140.0000 0.17
P-8 J-7 J- 9 170.45 8 .00 140.0000 0. 00
P-9 J-7 J-8 518.43 6 . 00 140. 0000 14. 30
P-10 J-8 J-6 274. 88 6. 00 140. 0000 o. 57
P-11 J-9 J-5 197. 72 8 .00 140. 0000 0.00
P-12 J-9 J-10 175. 92 8. 00 140. 0000 0.00
P-13 J-11 J-7 384. 71 8. 00 140. 0000 0.17
P-14 J-11 J-12 324. 67 3. 00 140. 0000 0.17
P-15 J-13 J-11 544 . 82 8.00 140. 0000 1. 44
P-16 J-13 J-15 219.27 8.00 140.0000 1. 44
P-17 J-15 J-14 43. 33 8. 00 140.0000 0 .00
P-18 J-15 J-16 450.00 3.00 140.0000 0 .17
P-20 J-1 J-3 229. 45 8. 00 140.0000 0 .57
P-21 J-17 J-4 661. 82 6. 00 140.0000 1. 84 P-22 J-19 J-10 1197.09 8. 00 130. 0000 14 .00
P-23 VP-2 J-19 43. 4 7 18.00 130. 0000 0 .00
P U M P/L 0 S S E L E M E N T DAT A
THERE IS A DEVICE AT NODE VP-2 DESCRIBED BY THE FOLLOWING DATA: (IO-1)
HEAD FLOWRJ\TE EFFICIENCY
(ft) (gpm) (I)
189. 23 0. 00 75.00
184. 62 1350. 00 75 .00
172. 57 2700.00 75 . 00
E N D N 0 D E DA TA
NODE NODE EXTERNAL JUNCTION EXTERNAL
NAME TITLE DEMAND ELEVATION GRADE
(gpm) (ft) (ft) --------------------------------------------------------------J-1 o.oo 327.00
J-2 0. 00 328.00
J-3 0.00 309. 00
J-4 0.00 319. 00
J-5 0.00 326.00
J-6 0.00 315.00
J-7 0. 00 316.00
J-8 0.00 321.00
J-9 0.00 320. 00
J-10 o. 00 319.00
J-11 0.00 307. 00
J-12 0.00 303. 00
J-13 o. 00 312. 00
J-14 0. 00 309. 00
J-15 o. 00 309. 00
J-16 0.00 305. 00
J-17 1000. 00 333. 00
J-19 0.00 0.00
VP-2 340.00 34 0. 00
0 U T P U T 0 P T I 0 N D A T A
OUTPUT SELECTION: ALL RESULTS ARE INCWDED IN THE TABULATED OUTPUT
MAXIMUM AND MINIMUM PRESSURES 5
MAXIMUM AND MINIMUM VELOCITIES 5
MAXIMUM AND MINIMUM HEAD LOSS/1000 • 5
Y S T E M C 0 N F I G U R A T I 0 N
Ca~e:
NUMBER OF PIPES .••...•...•.•.••••• (p) 22
NUMBER OF END NODES ..•.•.••••..•.• ( j ) 18
NUMBER OF PRIMARY LOOPS •.••••••••. ( l) • 4
NUMBER OF SUPPLY NODES •..••.•••••• ( f) •
NUMBER OF SUPPLY ZONES •..••..••..• (z) •
RESULTS OBTAINED AFTER 6 TRIALS: ACCURACY • 0.00001
S I M U L A T I 0 N D E S C R I P T I 0 N (L A B E L)
P I P E L I N E R E S U L T S
STATUS CODE:
P I P E
N AM E
P-1
P-2
P-3
P-4
P-5
P-6
P-7
P-8
P-9
P-10
P-11
P-12
P-13
P-14
P-15
P-16
P-17
P-18
P-20
P-21
P-22
P-23
XX -CLOSED PIPE
NODE NUMBERS
#1 #2
J-19 J-1
J-3 J-2
J-3 J-4
J-4 J-6
J-5 J-17
J-8 J-5
J-6 J-13
J-7 J-9
J-7 J-8
J-6 J-8
J-9 J-5
J-10 J-9
J-11 J-7
J-11 J-12
J-13 J-11
J-13 J-15
J-15 J-14
J-15 J-16
J-1 J-3
J-4 J-17
J-19 J-10
VP-2 J-19
E N D N 0 D E R E S U L T S
CV -CHECK VALVE
FLOWRATE HEAD MINOR
LOSS LOSS
(gpm) (ft) (ft)
637. 62 0.13 0.01
0.00 0.00 0. 00
637. 62 2.36 0. 04
220. 49 0.30 0.01
582.87 7. 63 0.12
133.77 0.66 o. 05
104. 75 0.07 0. 00
86. 72 0.03 0 .00
18. 04 0.02 0.01
115. 74 0. 33 0.02
449 .10 0. 71 0.00
362. 38 0. 43 0 .00
104. 75 0. 09 0.00
0. 00 0.00 0.00
104 . 75 0.13 0 . 01
0.00 0.00 0 .00
0. 00 0.00 0.00
0. 00 o.oo 0 . 00
637. 62 1.59 0 .15
417 .13 8. 4 7 0 . 64
362. 38 3. 34 1.16
1000. 00 0.02 0.00
LINE HL+ML/
VELO. 1000
(ft/•) (ft/ft)
0.80 0.17 o.oo 0. 00
4. 07 7.05
1.41 0.99
6. 61 24.15
1.52 1. 68
0. 67 0.25
0.55 0.17
0. 20 0. 06
1. 31 1.25
2. 87 3. 62
2. 31 2. 43
0. 67 0. 25
0.00 o.oo
0.67 0.26 o.oo 0.00
0. 00 0. 00
0. 00 o.oo
4.07 7 .56
4.73 13. 77
2. 31 3. 76
1. 26 0. 35
NODE
NAME
NODE
TITLE
EXTERNAL HYDRAULIC NODE PRESSURE NODE
J-
J-
J-
DEMAND GRADE ELEVATION HEAD PRESSURE
(gpm) (ft) (ft) (ft) (p•i)
0.00
0 .00
0.00
526.43
524. 69
524.69
327 . 00
328. 00
309. 00
199.43
196.69
215.69
86. 42
85.23
93. 4 7
HL/
1000
(ft/ ft)
0.15 o. 00
6. 92
0. 97
23.79
1.56
0. 24
0.17
0. 04
1.19
3.62
2.43
0.24 o. 00
0.24
0 .00
0. 00
0.00
6. 92
12.80
2 . 79
0.35
J-4 0. 00 522. 29
J-5 0. 00 520. 93
J-6 0. 00 521. 98
J-7 0. 00 521. 67
J-8 0.00 521. 64
J-9 o. 00 521. 64
J-10 0. 00 522. 07
J-11 0 . 00 521. 76
J-12 0 .00 521. 76
J-13 0.00 521. 91
J -14 o. 00 521. 91
J-15 0. 00 521. 91
J-16 0.00 521. 91
J-17 1000. 00 513 .18
J-19 0.00 526.57
VP-2 526. 58
S U M M A R Y 0 F I N F L 0 W S AND 0 u
(+) INFLOWS INTO THE SYSTEM FROM SUPPLY NODES
( -) OUTFLOWS FROM THE SYSTEM INTO SUPPLY NODES
NODE
NAME
FLOWRATE
(gpm)
VP-2
NET SYSTEM INFLOW •
NET SYSTEM OUTFLOW =
NET SYSTEM DEMAND =
1000.00
1000. 00
0.00
1000. 00
NODE
TITLE
319.00 203. 29 88. 09
326.00 194. 93 84. 47
315. 00 206. 98 89.69
316.00 205. 67 89.12
321. 00 200.64 86. 94
320.00 201. 64 87.38
319.00 203. 07 88. 00
307 . 00 214. 76 93 . 06
303 . 00 218.76 94. 80
312. 00 209.91 90.96
309 .00 212.91 92 . 26
309. 00 212. 91 92.26
305. 00 216.91 93.99
333. 00 180.18 78.08 +-LOW PRESSURE
34 0. 00 186. 58 80.85
T F L 0 W S
..
HB
111
McCLURE & BROWNE ENGINEERING/SURVEYING, INC.
1008 Woodcreek Drive, Suite 103 •College Station, Texas 77845
(979) 693-3838 •Fax: (979) 693-2554 •Email: McClureBrowne@Verizon.net
EXHIBIT B
F:\1053 ·Randy French\0005 ·Sonoma Development\Oocs\Phase Two\OP Request\COCS. Glbbs01. OP Request.doc
Fann 1058
(Rev. 9/2004)
Page 2 of2
Access Driveway Regulations
The Texas Transportation Commission, in recognition of its responsibility for the safety and utility of public highways under its jurisdiction, has
directed the department to adopt access driveway standards to accomplish a coordinated development between highways and abutting property.
For this purpose, the booklet entitled "Regulations for Access Driveways to State Highways", was published and adopted, setting out
departmental policies to regulate construction and maintenance of access driveway facilities.
Sketch of Installation
IRON HORSE WAY
SONOMA-PHASE 2
SEE ATTACHED PROVISIONS
February 19. 2008 -----------------------------------------------------------------------------------------
Jay,
We want to replace the rock rip-rap at the end of the culvert on Iron Horse Way in the
Sonoma Subdivision with grass sod (see attached). The velocity for the 10 year storm is
4.2 fps. The 25 year velocity is 4.8 fps. Let me know if you need any additional
information.
Thanks,
Jeff
Jeffery L. Robertson, P.E.
Vice-President Engineering
McClure & Browne Engineering/Surveying, Inc.
1008 Woodcreek Drive, Ste. 103
College Station, Tx 77845
Ph: (979) 693-3838
Fx: (979) 693-2554
jeffr@mcclurebrowne.com
I
I
I
I
/
I I
I
/
i I
I ... ~ ;
' !
i I
i
' i
I
' /
Revised 2-19-08 by Jeffery L
Rock Rip-Rap to be replaced with
Robertson
Gross Sod
I
I
I iJ I
I ~ I
· .. 1 <> I -"--.,,-~
I "' ,:j ···l
. :~~II ', .. n 1 .,
I "'
I I
I :
,·;!·;'1 · .. __ _.-.............
~-·=~~
-........
''-.
\
\
IRON HORSE WAY
~. S~~· H~:. 1• :o.20'