Loading...
HomeMy WebLinkAboutDetention Facility AnalysisDetention Facility Analysis for CC Creations Renovation & Parking Lot Addition College Station, Texas June 2011 Engineer: SCHULTZ ENGINEERING, LLC. P.O. Box 11995 College Station, TX 77842 2730 Longmire Drive, Suite A College Station, Texas 77845 (979) 764-3900 Developer: Lawson Properties 1800 Shiloh Ave. Bryan, TX 77803 979-693-9664 CC Creations Renovation & Parking Lot Addition Detention Facility Analysis ENGINEER SCHULTZ ENGINEERING, LLC. P.O. Box 11995 College Station, Texas 77842 Phone/Fax: (979) 764-3900 Lawson Properties 1800 Shiloh Ave Bryan, TX 77803 979-693-9664 GENERAL DESCRIPTION AND LOCATION Location: Description: Area: 8,251 acres • Proposed Land Use. • # of Lots: • Existing Land Use: • Land Description: Adjoining Land Use: Primary Drainage Facility: Flood Hazard Information: FEMA FIRM.• F000dplain: C-2 2 lots Commercial The site is bounded on the south by First United Methodist, on the east by a residential neighborhood, and on the North by Holleman Drive. To the west are commercial developments which are self storage facilities. Bee Creek # 48041C0144 C & 48041C0182C (July 2, 1992) A portion of this tract lies within the floodplain. No fill placement or development is proposed within the floodplain. HYDROLOGIC CHARACTERISTICS The existing site is a commercial building with parking, driveways and 2 detention ponds. The runoff from the site enters one of the detention ponds and then is discharged into an existing drainage channel. GENERAL STORMWATER PLAN The drainage plan for this development will involve modification of the existing south detention pond to account for the increase in impervious area as a result of the addition of a new parking lot. No additional development is proposed in the watershed that drains into the existing detention pond. Page 1 of 5 COORDINATION & STORMWATER PERMITTING The project will require that a Notice of Intent be submitted to the Texas Commission for Environmental Quality. No other permits are anticipated for this project. DETENTION ANALYSIS & DESIGN General: The stormwater runoff from this subdivision discharges into 2 different outfalls. The discharge to only 1 of these outfalls will be affected by this development. The area which flows to the north will not be disturbed so no modifications to the north detention pond are proposed. The existing south detention pond will be modified for this development. The south detention pond is located in the south central part of the site and discharges into a tributary of Bee Creek. EXISTING DETENTION POND (RATIONAL EQUATION ANALYSIS): General: The Existing Detention Pond was designed using the rational equation methodology. Since the total area of the drainage basin is less than 50 acres, this is in accordance with the BCS Drainage Design Guidelines. T, Methodology: TR 55 T, Minimum 10 minutes Design Storm Events: 1, 2, 10, 25, 50 and 100-year storms— detention analysis Pond Discharge Materials: The pond outlet structure discharges into an existing drainage Manning's n Value: Runoff Coefficients: ditch 0.012 0.35 — undeveloped property 0.40 — grass and landscaped area 0.95 — impervious areas 0.67 — composite C value for area 203 Design Constraints: Post Development flow less than or equal to Pre -Development flow 6" freeboard for 100 year storm with outlet clogged Rational Equation: The rational equation is utilized to determine peak storm water runoff rates for Existing South Detention Pond design. Q = CIA Q = Flow (cfs) A = Area (acres) C = Runoff Coefficient I = Rainfall Intensity (in/hr) Design Software: Excel spreadsheets, Hydraflow The software was used to compute the pond storage and discharge data and the pre and post development flow and the routing of the flow through the detention pond. Page 2 of 5 Applicable Exhibits: Exhibit A — Drainage Area Map Pre & Post Development Exhibit B — Existing Pond Grading Plan Appendix A — Existing Detention Pond elevation -storage data & elevation -discharge data, pond routing data and pond routing analysis. Design Analysis: A topography survey of the existing pond was performed and there are some differences with the previous design. The pond berm height of 302.0' was not achieved and for this design a berm height of 302.1 was used. Also, the volume of the pond was less than shown in the previous design. Our design indicates that additional volume is needed, therefore the pond is being regraded to lower and enlarge the volume of the pond. The "V" shaped weir on the existing pond outlet structure is also being lowered and modified. The existing concrete outlet weir structure has wing walls and a slab and discharges into an existing drainage ditch. The top of the outlet structure is at elevation 301.4. The earthen berm has been eroded around the outlet structure so that the pond cannot fill to its required volume. The structure is being modified to add upstream headwalls so that the berm grading can be properly done around the structure. The structure walls are 15' in total length and this serves as the overflow structure in case the weir cannot handle the flow. The existing weir opening was 17" in width at the top down to an elevation of 299.5. It then was a "V" to elevation 299.1. In order to increase the volume of the pond, the weir is being modified to have an invert elevation of 298.0 and be 8" wide from elevation 298.0 to elevation 300.0. The weir structure will remain 17" in width from elevation 300.0 to 301.4. The existing drainage ditch downstream of the outlet structure will be deepened slightly to allow the flow from the outlet structure to drain to the existing Bee Creek Tributary. The pond design in this report is for the existing development, the proposed parking lot and for some additional future development. An evaluation of any future development should be made to determine if the modified pond will mitigate the additional development. The pre- and post -development runoff information for the existing detention pond evaluation is shown in Table 1. The pre -development and post development drainage areas are shown on Exhibit A, The peak flow out of the detention pond was determined by a Storage Routing Analysis based on the Continuity Equation as follows: (I1+12)+((2sl/dt)- 01)=((2s2/dt)=O2). The time interval, dt, used was 1 minute. The calculations and results of the Storage Routing Analysis were used to generate hydrograph peak flows and graphs for the pre and post development conditions. A summary of the peak flows from the site are shown in Table 2. The runoff hydrographs from these 2 areas were combined and the resulting peak flow is also shown in Table 2. The watershed for the existing south detention pond consists of 4.83 acres of the site (DA 103 & 203) and two upstream offsite areas (DA 101 & 201 and 102 & 202) which are developed commercial self storage facilities. A review of the drainage reports for these facilities indicates they both provided storm water detention to mitigate the increased runoff. For our design, we assumed the pre -development condition of these areas had a runoff coefficient of 0.35. Conservatively, we used a runoff coefficient of 0.40 for the post -development condition even though the detention facility is supposed to fully mitigate the increased runoff. Page 3 of 5 S 3o h a2ed <S'0 = piuogaaid `9' I0£ = paSSolo lalino/m aou3ins iaium xuW h' IO£ = Isaio XrmlpdS `I'ZO£ = wiag3o doL To £'IO£ £'£ 90'LI ieai OOI 60 Z'IO£ Z'C 8Z'91 iva!-OS I'l 0'10£ 0'£ 8FI71 iva,i-SZ £'I 8'00£ Z8'Z L£'ZI iea,i-OI L'I b'00£ b'z 16'8 aua,C-Z Id piuogaaig g `uol;enalg oou3inS iaiuM g `q; a(j Mold JPM s3o `puod3o Ino nnold vad Iuang wiolS slanal aae}inS ia;eM wnugxeW puod Sul;slx3;o AiewLunS — E 318y1 01' I 111 VI' l 00' I £9'0 MOId )luad ul asuaiaaQ 50'LI 8Z'9i 81TI L£'ZI I6'8 puodSwislxg3o;no ZO'Ob 9£'8£ 98'££ 85'6Z S£'IZ puod3ulislxgolul puod q;lm IuawdolanaQ-;sod O U 51'8I 6£'LI Z£'SI L£'£L bS'6 dol IuawdolanaQ-aid s3a s3a s3a s3a s3a 0016 oso Szo o10 zo °Olig°°� slsAleuy uol;ua;ad — uol;euaio;ul }jouna;uawdolanaa-;sod'8 -aid — Z 318t/1 •slsxluuy Eulino-1 a$eiolS oql Xq poulwialop sung aau3ins iaium wnwlxuw oql pun spuod uoquolop ag; 3o Ino Mop Nuod aqL •puod uopuolaQ Oupsixo oql io3 piuogaai33o iunowe oql puu aou3ins iolum wnwlxuw aql sluasaid £ olquy `Xlluuollippy 'IU°na wiois u3lsop goua io3 moppno )luad olgemollu aql uugi ssal sl ails loafoid aql woi3 Moppno dead luawdolanap-Isod oqi °Z olquy ul umogs sd 51 L9'0 9I'9 lu1ol Isod oZ S£'0 9I'9 1u1oL aid .UIN oZ D saioti # uaiy _ slsAleuy uol;ua;aa — uol;euaio;ul;;ouna;uawdolanaa-;sod T -aid — T 318y1 .oils ogl3o iapuluwai oql uo ivawdolanap ainin3 owos puu `lol $ulNied posodoid oqi °ails Supslxo otµ3o uaiu snolniadwl oql Sulsn poindwoo sung `VL'0=3`EOZ uaiy a2uuluiQ io3lualogpoa33ouni oqy The discharge from the pond is contained within the weir of the pond outlet structure that discharges into the existing drainage ditch. The proposed overflow spillway which is the concrete outlet structure discharges in the event the outlet structure becomes clogged. It is not anticipated that the overflow spillway will be used. The overflow spillway also discharges into the existing drainage ditch downstream of the outlet structure. The grading plan for the Existing Detention Pond and the pond outlet structure and discharge pipe details are shown on Exhibit B. A full size copy of this drawing is with the construction plans. CONCLUSION The detention facility described in this report is designed in accordance with the standards in the BCS Drainage Design Guidelines. The peak runoff flowrate from the site will be less than the pre -development flowrates for all storm events. CERTIFICATION I, Joseph P. Schultz, Licensed Professional Engineer No. 65889, State of Texas, certify that this report for the drainage design for CC Creations Renovation and Parking Lot Addition, was prepared by me in accordance with the provisions of the Unified Stormwater Design Guidelines. i11���AcE of ••. iS #r' � •'• *ter k t: JOSEPH P. SCHULTZ :y 65889 g, All 1 �qv IONA i��� F-12327 SCHULTZ ENGINEERING, LLC. � i �. ice, Page 5 of 5 Appendix A Existing Detention Pond — Elevation -storage data & Elevation - Discharge data, Pond routing data and Pond routing analysis. U d O N C a M M V N N T _ _ � � co ro ro ro m of of of O r M M ECY wN. (OO M UN1 U Cj M M N a. m rn rn m ro m ro co 0g 0 0 0 O M M M M N 2 - W W W of Ol m m O U N N N O O N M N M N 10 - W �' N C M M M M N N N O 00 O N (i N O N W N U iI U N O n N m N N N N T V O O O O O e L � C N N N N E 0 ry T N N N N N N L V� OI W O m — C Y V O O O O N N N N E N N N N M M M M U O O O O O O O O u Q M T M M N W Q Q o ov 0 0 o v <o 0 0 0 N N N Q F- 11 F- lN3WdOl3n3(1-3idd 1NMU013n301SOd � M � O II II II O U So c J i II II II O y C O O) 00 O O II It II O c U G V O p N FF G O j_ a ti y It _ .: W LO N W W O O II II II a a a d a G 0 8 r � N g m `� m o d UC) c N mmo +' C U LL Q r o d N 11 II It I1 W n N Ci a C-) N` +=� 'O 1 V1 M1 N1 01 1 O1 o E �� NI .'1 �1 NI O)i OI MI (DI p > > of '0I 0) E O I O' LoI —1 NI p> U "1 041M1 ef' !a I`1 (DI 01 Nl ` Oco; NI (OI COI 3 7 Oi p' 1'1 00I 001 MI N' 1 NI M ' 7 > l v: i U d I tm I 1 1 m y co! I It of of (qI Ol d'1 .O O i Ni 01 NI rl N1 O a ro CD! N!NI (DI co1 Wl �i I` Ni i pI (Otf)I col VI N Q i (01 �I ((01 col N I t i � Ci C Ci CL 0 Oi c-I N1 Mi Mi ti I c I O O; O; O; of 'cti OI N �^.' COS mI OI I i Ni 9 �..� W� Oi Oi O: OI Ol N Ni NI MI MI MI W CC Creations South Detention Pond Elevation - Discharge Data Depth - Discharge Data Elevation (ft) Pond Depth (ft) Weir Flow (cfs) Overflow Spillway Flow (cfs) Total Design Flow (cfs) 298.0 0.0 0.00 0.00 0.00 299.0 1.0 2.20 0.00 2.20 300.0 2.0 6.30 0.00 6.30 301.0 3.0 14.10 0.00 14.10 301.4 3.4 18.10 0.00 18.10 302.0 3.9 18.10 26.70 44.80 Notes: 1. The Outlet Structure is a concrete structure with a weir to limit flow. The weir opening is 17" wide from Elev 301.4 to Elev. 300 and is 8" wide from Elev. 298.0 to Elev. 300 2. The overflow spillway is a weir over the top of the concrete structure with a width of 15'. CC Creations South Detention Pond Elevation - Discharge Data Clogged Condition Depth - Discharge Data Elevation (ft) Pond Depth (ft) Weir Flow (cfs) Overflow Spillway Flow (cfs) Total Design Flow (cfs) 298.0 0.0 0.00 0.00 0.00 299.0 1.0 0.00 0.00 0.00 300.0 2.0 0.00 0.00 0.00 301.0 3.0 4.70 0.00 4.70 301.4 3.4 7.80 0.00 7.80 302.0 3.9 7.80 26.70 34.50 Notes: 1. The lower portion of the Outlet Structure weir is plugged under tV 2. The overflow spillway is a weir over the top of the concrete structure with a width of 15'. CC Creations - South Pond Storage Routing Analysis Parameters t=60s Detention Pond Elevation Depth, Discharge Storage 2slt 2slt+0 ft ft O, cfs s, c 298.0 0.0 0.0 0.0 0.0 0.0 299.0 1:0 2.2 1850.0 61.7 63.9 300.0 2.0 6.3 10924.0 364.1 370.4 301.0 3.0 14.1 25043.0 834.8 848.9 301.4 3.4 18.1 31392.0 1046.4 1064.5 302.0 4.0 44.8 42626.0 1420.9 1465.7 CC Creations - South Pond Storage Routing Analysis Parameters Plugged Condition t=6os Detention Pond Elevation Depth Discharge Storage 2 sit 2 s/t + O ft) (ft) (O, cis) s, c 298.0 0.0 0.0 0.0 0.0 0.0 299.0 1.0 0.0 1850.0 61.7 61.7 300.0 2.0 0.0 10924.0 364.1 364.1 301.0 3.0 4.7 25043.0 834.8 839.5 301.4 3.4 7.8 31392.0 1046.4 1054.2 302.0 4.0 34.5 42626.0 1420.9 1455.4 Pond-d ata-for-routing.xls N m N 0 m t � U N_ V O N O N v � � C N y a� a°� O rn Cl 00 O r O N N O Ln m c LL E CN G O V O M O N O I O O O O O O N O W (O V N (S)o) moljlno Storage Routing Analysis CC Creations South Pond 2-Year Storm Event Pond Pre-Dev Time Inflow 11+12 2s/t-0 2s/t+O Discharge Discharge min.i (cfs cfs) - (cfs cfs 0 0.00 0.00 0.00 0.00 0.00 0.00 1 1.42 1.42 1.33 1.42 0.05 0.48 2 2.85 4.27 5.21 5.60 0.19 0.95 3 4.27 7.12 11.48 12.33 0.42 1.43 4 5.69 9.96 19.96 21.44 0.74 1.91 5 7.12 12.81 30.52 32.77 1.13 2.39 6 8.54 15.66 43.00 46.17 1.59 2.86 7 9.96 18.50 57.26 61.50 2.12 3.34 8 11.39 21.35 73.82 78.61 2.40 3.82 9 12.81 24.20 92.70 98.02 2.66 4.29 10 14.23 27.04 113.85 119.75 2.95 4.77 11 15.66 29.89 137.21 143.74 3.27 5.25 12 17.08 32.74 162.71 169.94 3.62 5.72 13 18.50 35.58 190.29 198.29 4.00 6.20 14 19.93 38.43 219.92 228.72 4.40 6.68 15 21.35 41.28 251.51 261.19 4.84 7.16 16 20.64 41.99 282.96 293.50 5.27 7.63 17 19.93 40.57 312.18 323.52 5.67 8.11 18 19.22 39.14 339.23 351.32 6.04 8.59 19 18.50 37.72 364.14 376.95 6.41 9.06 20 17.79 36.30 386.85 400.43 6.79 9.54 21 17.08 34.87 407.45 421.72 7.14 9.30 22 16.37 33.45 426.00 440.90 7.45 9.06 23 15.66 32.03 442.57 458.02 7.73 8.82 24 14.95 30.60 457.22 473.17 7.98 8.59 25 14.23 29.18 470.02 486.40 8.19 8.35 26 13.52 27.76 481.02 497.77 8.38 8.11 27 12.81 26.33 490.28 507.35 8.53 7.87 28 12.10 24.91 497.87 515.19 8.66 7.63 29 11.39 23.49 503.84 521.36 8.76 7.39 30 10.68 22.06 508.23 525.90 8.83 7.16 31 9.96 20.64 511.10 528.87 8.88 6.92 32 9.25 19.22 512.50 530.32 8.91 6.68 33 8.54 17.79 512.48 530.29 8.91 6.44 34 7.83 16.37 511.08 528.85 8.88 6.20 35 7.12 14.95 508.35 526.03 8.84 5.96 36 6.41 13.52 504.34 521.88 8.77 5.72 37 5.69 12.10 499.08 516.44 8.68 5.49 38 4.98 10.68 492.61 509.75 8.57 5.25 39 4.27 9.25 484.97 501.86 8.44 5.01 40 3.56 7.83 476.21 492.80 8.30 4.77 41 2.85 6.41 466.36 482.62 8.13 4.53 42 2.14 4.98 455.45 471.34 7.95 4.29 43 1.42 3.56 443.52 459.01 7.74 4.05 44 0.71 2.14 430.60 445.65 7.53 3.82 45 0.00 0.71 416.73 431.31 7.29 3.58 46 0.00 0.00 402.61 416.73 7.06 3.34 47 0.00 0.00 388.96 402.61 6.83 3.10 48 0.00 0.00 375.76 388.96 6.60 2.86 49 0.00 0.00 362.98 375.76 6.39 2.62 50 0.00 0.00 350.58 362.98 6.20 2.38 51 0.00 0.00 338.51 350.58 6.03 2.15 52 0.00 0.00 326.77 338.51 5.87 1.91 53 0.00 0.00 315.33 326.77 5.72 1.67 54 0.00 0.00 304.21 315.33 5.56 1.43 55 0.00 0.00 293.38 304.21 5.41 1.19 56 0.00 0.00 282.84 293.38 5.27 0.95 57 0.00 0.00 272.58 282.84 5.13 0.72 58 0.00 0.00 262.60 272.58 4.99 0.48 59 0.00 0.00 252.88 262.60 4.86 0.24 60 0.00 0.00 243.43 252.88 4.73 0.00 61 0.00 0.00 234.22 243.43 4.60 -0.24 62 0.00 0.00 225.27 234.22 4.48 0.00 63 0.00 0.00 216.55 225.27 4.36 0.00 64 0.00 0.00 208.07 216.55 4.24 0.00 65 0.00 0.00 199.81 208.07 4.13 0.00 66 0.00 0.00 191.77 199.81 4.02 0.00 67 0.00 0.00 183.95 191.77 3.91 0.00 68 0.00 0.00 176.34 183.95 3.81 0.00 69 0.00 0.00 168.93 176.34 3.70 0.00 70 0.00 0.00 161.72 168.93 3.60 0.00 71 0.00 0.00 154.70 161.72 3.51 0.00 72 0.00 0.00 147.87 154.70 3.41 0.00 73 0.00 0.00 141.23 147.87 3.32 0.00 74 0.00 0.00 134.76 141.23 3.23 0.00 75 0.00 0.00 128.46 134.76 3.15 0.00 76 0.00 0.00 122.34 128.46 3.06 0.00 77 0.00 0.00 116.37 122.34 2.98 0.00 78 0.00 0.00 110.57 116.37 2.90 0.00 79 0.00 0.00 104.92 110.57 2.82 0.00 80 0.00 0.00 99.42 104.92 2.75 0.00 81 0.00 0.00 94.07 99.42 2.68 0.00 82 0.00 0.00 88.87 94.07 2.60 0.00 83 0.00 0.00 83.80 88.87 2.53 0.00 84 0.00 0.00 78.87 83.80 2.47 0.00 85 0.00 0.00 74.06 78.87 2.40 0.00 86 0.00 0.00 69.39 74.06 2.34 0.00 87 0.00 0.00 64.85 69.39 2.27 0.00 88 0.00 0.00 60.42 64.85 2.21 0.00 89 0.00 0.00 56.11 60.42 2.15 0.00 90 0.00 0.00 51.92 56.11 2.10 0.00 91 0.00 0.00 47.84 51.92 2.04 0.00 92 0.00 0.00 43.87 47.84 1.99 0.00 93 0.00 0.00 40.01 43.87 1.93 0.00 94 0.00 0.00 36.25 40.01 1.88 0.00 95 0.00 0.00 32.59 36.25 1.83 0.00 96 0.00 0.00 29.02 32.59 1.78 0.00 97 0.00 0.00 25.56 29.02 1.73 0.00 98 0.00 0.00 22.18 25.56 1.69 0.00 99 0.00 0.00 18.90 22.18 1.64 0.00 100 0.00 0.00 15.70 18.90 1.60 0.00 101 0.00 0.00 12.59 15.70 1.56 0.00 102 0.00 0.00 9.57 12.59 1.51 0.00 103 0.00 0.00 8.91 9.57 0.33 0.00 104 0.00 0.00 8.29 8.91 0.31 0.00 105 0.00 0.00 7.72 8.29 0.29 0.00 106 0.00 0.00 7.19 7.72 0.27 0.00 107 0.00 0.00 6:70 7.19 0.25 0.00 108 0.00 0.00 6.23 6.70 0.23 0.00 109 0.00 0.00 5.81 6.23 0.21 0.00 110 0.00 0.00 5.41 5.81 0.20 0.00 111 0.00 0.00 5.03 5.41 0.19 0.00 112 0.00 0.00 4.69 5.03 0.17 0.00 113 0.00 0.00 4.36 4.69 0.16 0.00 114 0.00 0.00 4.06 4.36 0.15 0.00 115 0.00 0.00 3.78 4.06 0.14 0.00 116 0.00 0.00 3.52 3.78 0.13 0,00 117 0.00 0.00 3.28 3.52 0.12 0.00 118 0.00 0.00 3.05 3.28 0.11 0.00 119 0.00 0.00 2.84 3.05 0.11 0.00 120 0.00 0.00 2.65 2.84 0.10 0.00 O O O O O O (O d N v m N N m L U N U 0 N_ O d v � O C N N L I a O O co O (s;o) mol;;no O rn 0 ao r 0 0 M N O LO O C LL N O f;, V 0 M O N O O O O O CC Creations South Pond 10-Year Storm Event Pond Pre-Dev Time Inflow 11+12 2slt-0 WOODischarge Discharge min. cfs cfs cfs cfs 0 0.00 0.00 , 0.00 0.00 0.0,0 0.00 1 1.97 1.97 1.84 1.97 0.07 0.67 2 3.94 5.92 7.22 7.75 0.27 1.34 3 5.92 9.86 15.90 17.08 0.59 2.01 4 7.89 13.80 27.66 29.71 1.02 2.67 5 9.86 17.75 42.28 45.41 1.56 3.34 6 11.83 21.69 59.57 63.97 2.20 4.01 7 13.80 25.64 80,24 85.21 2.48 4.68 8 15.78 29.58 104.19 109.82 2.81 5.35 9 17.75 33.52 131.34 137.71 3.19 6.02 10 19.72 37.47 161.60 168.80 3.60 6.69 11 21.69 41.41 194.89 203.01 4.06 7.35 12 23.66 45.36 231.13 240.24 4.56 8.02 13 25.64 49.30 270.23 280.43 5.10 8.69 14 27.61 53.24 312.13 323.48 5.67 9.36 15 29.58 57.19 356.75 369.32 6.29 10.03 16 28.59 - 58.17 400.87 414.92 7.03 10.70 17 27.61 56.20 441.65 457.07 7.71 11.36 18 26.62 54.23 479.19 495.88 8.35 12.03 19 25.64 52.26 513.59 531.45 8.93 12.70 20 24.65 50.29 544.97 563.88 9.45 13_37 21 23.66 48.31 573.42 593.29 9.93 13.04 22 22.68 46.34 599.03 619.76 10.36 12.70 23 21.69 44.37 621.90 643.40 10.75 12.37 24 20.71 42.40 642.12 664.30 11.09 12.03 25 19.72 40.43 659.77 682.54 11.39 11.70 26 18.73 38.45 674.93 698.22 11.64 11.36 27 17.75 36.48 687.70 711.42 11.86 11.03 28 16.76 34.51 698.14 722.21 12.03 10.70 29 15.78 32.54 706.33 730.68 12.17 10.36 30 14.79 30.57 712.35 736.90 12.27 10.03 31 13.80 28.59 716.26 740.94 12.34 9.69 32 12.82 26.62 718.14 742.88 12_37 9.36 33 11.83 24.65 718.05 742.79 12.37 9.02 34 10.85 22.68 716.05 740.73 12.34 8.69 35 9.86 20.71 712.22 736.76 12.27 8.36 36 8.87 18.73 766.60 730.96 12.18 8.02 37 7.89 16.76 699.25 723.36 12.05 7.69 38 6.90 14.79 690.24 714.04 11.90 7.35 39 5.92 12.82 679.61 703.06 11.72 7.02 40 4.93 10.85 667.42 690.46 11.52 6.68 41 3.94 8.87 653.72 676.30 11.29 6.35 42 2.96 6.90 638.56 660.63 11.03 6.02 43 1.97 4.93 621.99 643.49 10.75 5.68 44 0.99 2.96 604.05 624.95 10.45 5.35 45 0.00 0.99 584.79 605.04 10.12 5.01 46 0.00 0.00 565.20 584.79 9.79 4.68 47 0.00 0.00 546.25 565.20 9.48 4.35 48 0.00 0.00 527.91 546.25 9.17 4.01 Pond2-Routing.xis CC Creations South Pond 10-Year Storm Event Pond Pre-Dev Time Inflow 11+12 Discharge Discharge 2slt-0 2sIt+O min. cfs cfs cfs cfs 49 0.00 0.00 , 510.18 527.91 8.87 3.68 50 0.00 0.00 493.02 510.18 8.58 3.34 51 0.00 0.00 476.42 493.02 8.30 3.01 52 0.00 0.00 460.37 476.42 8.03 2.67 53 0.00 0.00 444.83 460.37 7.77 2.34 54 0.00 0.00 429.81 444.83 7.51 2.01 55 0.00 0.00 415.27 429.81 7.27 1.67 56 0.00 0.00 401.21 415.27 7.03 1.34 57 0.00 0.00 387.60 401.21 6.80 1.00 58 0.00 0.00 374.44 387.60 6.58 0.67 59 0.00 0.00 361.71 374.44 6.37 0.33 60 0.00 0.00 349.34 361.71 6.18 0.00 61 0.00 0.00 337.31 349.34 6.02 -0.33 62 0.00 0.00 325.59 337.31 5.86 0.00 63 0.00 0.00 314.19 325.59 5.70 0.00 64 0.00 0.00 303.09 314.19 5.55 0.00 65 0.00 0.00 292.29 303.09 5.40 0.00 66 0.00 0.00 281.78 292.29 5.26 0.00 67 0.00 0.00 271.55 281.78 5.11 0.00 68 0.00 0.00 261.60 271.55 4.98 0.00 69 0.00 0.00 251.91 261.60 4.84 0.00 70 0.00 0.00 242.48 251.91 4.71 0.00 71 0.00 0.00 233.30 242.48 4.59 0.00 72 0.00 0.00 224.37 233.30 4.47 0.00 73 0.00 0.00 215.68 224.37 4.35 0.00 74 0.00 0.00 207.22 215.68 4.23 0.00 75 0.00 0.00 198.98 207.22 4.12 0.00 76 0.00 0.00 190.97 198.98 4.01 0.00 77 0.00 0.00 183.17 190.97 3.90 0.00 78 0.00 0.00 175.58 183.17 3.80 0.00 79 0.00 0.00 168.19 175.58 3.69 0.00 80 0.00 0.00 161.00 168.19 3.60 0.00 81 0.00 0.00 154.00 161.00 3.50 0.00 82 0.00 0.00 147.19 154.00 3.41 0.00 83 0.00 0.00 140.56 147.19 3.31 0,00 84 0.00 0.00 134.11 140.56 3.23 0.00 85 0.00 0.00 127.83 134.11 3.14 0.00 86 0.00 0.00 121.72 127.83 3.06 0.00 87 0.00 0.00 115.78 121.72 2.97 0.00 88 0.00 0.00 109.99 115.78 2.89 0.00 89 0.00 0.00 104.36 109.99 2.82 0.00 90 0.00 0.00 98.87 104.36 2.74 0.00 Pond2-Routing.xls N s a cc L 0 0 L T G d W E L 0 co L R N N O O O O co co V (V N m N � L U N U 0 N_ 5 O a � � C N N y O O O o0 2�ABl{�SIQ O O O (O V (V 0 rn 0 co O r O N O m to C � d O F O M O N O I Storage Routing Analysis CC Creations South Pond 25-Year Storm Event Pond Pre-Dev Time Inflow 11+12 2s/t-0 2slt+O Discharge Discharge min. cfs cfs , cfs cfs 0 0.00 0.00 0.00 0.00 0.00 0.00 1 2.26 2.26 2.10 2.26 0.08 0.77 2 4.51 6.77 8.26 8.87 0.31 1.53 3 6.77 11.29 18.20 19.55 0.67 2.30 4 9.03 15.80 31.66 34.00 1.17 3.06 5 11.29 20.32 48.40 51.98 1.79 3.83 6 13.54 24.83 68.58 73.23 2.32 4.60 7 15.80 29.35 92.62 97.93 2.66 5.36 8 18.06 33.86 120.40 126.48 3.04 6.13 9 20.32 38.37 151.84 158.78 3.47 6.89 10 22.57 42.89 186.83 194.73 3.95 7.66 11 24.83 47.40 225.27 234.23 4.48 8.43 12 27.09 51.92 267.09 277.19 5.05 9.19 13 29.35 56.43 312.17 323.52 5.67 9.96 14 31.60 60.95 360.43 373.12 6.34 10.72 15 33.86 _ _ 65.46 411.49 425.90 7.20 11.49 16 32.73 66.59 461.97 478.08 8.06 12.26 17 31.60 64.33 508.62 526.30 8.84 13.02 18 30.47 62.08 551.57 570.70 9.57 13.79 19 29.35 59.82 590.93 611.39 10.23 14.55 20 28.22 57.56 626.82 648.49 10.83 15_32 21 27.09 55.30 659.37 682.13 11.38 14.94 22 25.96 53.05 688.66 712.41 11.88 14.55 23 24.83 50.79 714.82 739.45 12.32 14.17 24 23.70 48.53 737.94 763.35 12.71 13.79 25 22.57 46.28 758.13 784.22 13.05 13.41 26 21.44 44.02 775.47 802.14 13.34 13.02 27 20.32 41.76 790.06 817.23 13.58 12.64 28 19.19 39.50 802.00 829.57 13.78 12.26 29 18.06 37.25 811.36 839.24 13.94 11.87 30 16.93 34.99 818.23 846.35 14.06 11.49 31 15.80 32.73 822.68 850.96 14.14 11.11 32 14.67 30.47 824.80 853.16 14_18 10.72 33 13.54 28.22 824.66 853.02 t 4.18 10.34 34 12.42 25.96 822.36 850.62 14.13 9.96 35 11.29 23.70 817.95 846.06 14.05 9.58 36 10.16 21.44 811.51 839.40 13.95 9.19 37 9.03 19.19 803.09 830.70 13.80 8.81 38 7.90 16.93 792.76 820.02 13.63 8.43 39 6.77 14.67 780.59 807.43 13.42 8.04 40 5.64 12.42 766.62 793.00 13.19 7.66 41 4.51 10.16 750.93 776.78 12.92 7.28 42 3.39 7.90 733.57 758.83 12.63 6.89 43 2.26 5.64 714.59 739.21 12.31 6.51 44 1.13 3.39 694.04 717.97 11.97 6.13 45 0.00 1.13 671.98 695.17 11.59 5.75 46 0.00 0.00 649.55 671.98 11.22 5.36 47 0.00 0.00 627.85 649.55 10.85 4.98 48 0.00 0.00 606.86 627.85 10.50 4.60 49 0.00 0.00 586.55 606.86 10.15 4.21 Pond2-Rcuting.x1s Storage Routing Analysis CC Creations South Pond 25-Year Storm Event Pond Pre-Dev Time Inflow 11+12 2s/t-0 2sIt+O Discharge Discharge min. cfs cfs. cfs cfs 50 0.00 0.00 566.90 586.55 9.82 3.83 51 0.00 0.00 547.89 566.90 9.50 3.45 52 0.00 0.00 529.51 547.89 9.19 3.06 53 0.00 0.00 511.72 529.51 8.89 2.68 54 0.00 0,00 494.51 511.72 8.60 2.30 55 0.00 0.00 477.87 494.51 8.32 1.92 56 0.00 0.00 461,76 477.87 8.05 1.53 57 0.00 0.00 446.19 461.76 7.79 1.15 58 0.00 0.00 431.11 446.19 7.54 0.77 59 0.00 0.00 416.53 431.11 7.29 0.38 60 0.00 0.00 402.43 416.53 7.05 0.00 61 0.00 0.00 388.79 402.43 6.82 -0.38 62 0.00 0.00 375.59 388.79 6.60 0.00 63 0.00 0.00 362.82 375.59 6.38 0.00 64 0.00 0.00 350.42 362.82 6.20 0.00 65 0.00 _ _ 0.00 338.36 350.42 6.03 0.00 66 0.00 0.00 326.61 338.36 5.87 0.00 67 0.00 0.00 315.18 326.61 5.71 0.00 68 0.00 0.00 304.06 315.18 5.56 0.00 69 0.00 0.00 293.24 304.06 5.41 0.00 70 0.00 0.00 282.70 293.24 5.27 0.00 71 0.00 0.00 272.45 282.70 5.13 0.00 72 0.00 0.00 262.47 272.45 4.99 0.00 73 0.00 0.00 252.76 262.47 4.86 0.00 74 0.00 0.00 243.30 252.76 4.73 0.00 75 0.00 0.00 234.10 243.30 4.60 0.00 76 0.00 0.00 225.15 234.10 4.48 0.00 77 0.00 0.00 216.44 225.15 4.36 0.00 78 0.00 0.00 207.95 216.44 4.24 0.00 79 0.00 0.00 199.70 207.95 4.13 0.00 80 0.00 0.00 191.67 199.70 4.02 0.00 81 0.00 0.00 183.85 191.67 3.91 0.00 82 0.00 0.00 176.24 183.85 3.80 0.00 83 0.00 0.00 168.83 176.24 3.70 0.00 84 0.00 0.00 161.63 168.83 3.60 0.00 85 0.00 0.00 154.61 161.63 3.51 0.00 86 0.00 0.00 147.79 154.61 3.41 0.00 87 0.00 0.00 141.14 147.79 3.32 0.00 88 0.00 0.00 134.67 141.14 3.23 0.00 89 0.00 0.00 128.38 134.67 3.15 0.00 90 0.00 0.00 122.26 128.38 3.06 0.00 Pond2-Routing,xls O O O O 0 O o 0 o 00 co IT m m N U � N O 'w L ^ � C N a� N N a� O O 0 0 0 0 V O 00 a6aegasia 0 0 0 co 0 r O m Lo m O c ii �E d E F- o O m 0 N O O O 0 O 0 0 o O o 0 V N O Storage Routing Analysis CC Creations South Pond 50-Year Storm Event Pond Pre-Dev Time Inflow 11+12 2s/t-O 2s/t+O Discharge Discharge (min.) (cfs) (cfs)' (cfs) (cfs) 0 0.00 0.00 0.00 0.00 0.00 0.00 1 2.56 2.56 2.38 2.56 0.09 0.87 2 5.11 7.67 9.36 10.05 0.35 1.74 3 7.67 12.79 20.62 22.15 0.76 2.61 4 10.23 17.90 35.87 38.52 1.33 3.48 5 12.79 23.02 54.83 58.89 2.03 4.35 6 15.34 28.13 78.05 82.96 2.46 5.22 7 17.90 33.25 105.63 111.30 2.83 6.09 8 20.46 38.36 137.45 143.99 3.27 6.96 9 23.02 43.47 173.39 180.92 3.77 7.83 10 25.57 48.59 213.35 221.98 4.31 8.70 11 28.13 53.70 257.22 267.06 4.92 9.56 12 30.69 58.82 304.89 316.04 5.57 10.43 13 33.25 63.93 356.27 368.83 6.28 11.30 14 35.80 69.05 410.93 425.32 7.20 12.17 15 38.36._ _ 74.16 468.75 485.09 8.17 13.04 16 37.08 75.44 525.93 544.19 9.13 13.91 17 35.80 72.88 578.76 598.81 10.02 14.78 18 34.52 70.33 627,40 649.09 10.84 15.65 19 33.25 67.77 671.98 695.17 11.59 16.52 20 31.97 65.21 712.64 737.20 12.28 17_39 21 30.69 62.65 749.49 775.29 12.90 16.96 22 29.41 60.10 782.67 809.59 13.46 16.52 23 28.13 57.54 812.30 840.21 13.96 16.09 24 26.85 64.98 838.40 867.28 14.44 15.65 25 25.57 52.43 861.07 890.82 14.88 15.22 26 24.29 49.87 880.43 910.93 15.25 14.78 27 23.02 47.31 896.62 927.74 15.56 14.35 28 21.74 44.75 909.74 941.37 15.82 13.91 29 20.46 42.20 919.91 951.94 16.01 13.48 30 19.18 39.64 927.24 959.55 16.15 13.04 31 17.90 37.08 931.84 964.33 16.24 12.61 32 16.62 34.52 933.81 966.37 16_28 12.17 33 15.34 31.97 933.24 965.78 16.27 11.74 34 14.07 29.41 930.23 962.65 16.21 11.30 35 12.79 26.85 924.87 957.08 16.11 10.87 36 11.51 24.29 917.24 949.16 15.96 10.43 37 10.23 21.74 907.43 938.98 15.77 10.00 38 8.95 19.18 895.53 926.61 15.54 9.56 39 7.67 16.62 881.61 912.15 15.27 9.13 40 6.39 14.07 865.74 895.67 14.97 8.70 41 5.11 11.51 847.99 877.24 14.63 8.26 42 3.84 8.95 828.44 856.94 14.25 7.83 43 2.56 6.39 807.10 834.84 13.87 7.39 44 1.28 3.84 783.97 810.93 13.48 6.96 45 0.00 1.28 759.12 785.25 13.06 6.52 46 0.00 0.00 733.85 759.12 12.64 6.09 47 0.00 0.00 709.40 733.85 12.22 5.65 48 0.00 0.00 685.75 709.40 11.83 5.22 49 0.00 0.00 662.87 685.75 11.44 4.78 50 0.00 0.00 640.73 662,87 11.07 4.35 Pond2-Routing.xls Storage Routing Analysis CC Creations South Pond 50-Year Storm Event Pond Pre-Dev Time Inflow 11+12 2s/t-O 2s/t+O Discharge Discharge (min.) (cfs) (cfs) (cfs) (cfs) 51 0.00 0.00 619.32 640.73 10.71 3.91 52 0.00 0.00 598.61 619.32 10.36 3.48 53 0.00 0.00 578.57 598.61 10.02 3.04 54 0.00 0.00 559.18 578.57 9.69 2.61 55 0.00 0.00 540.42 559.18 9.38 2.17 56 0.00 0.00 522.28 540.42 9.07 1.74 57 0.00 _ 0.00 504.73 522.28 8.78 1.30 58 0.00 0.00 487.75 504.73 8.49 0.87 59 0.00 0.00 471.32 487.75 8.21 0.43 60 0.00 0.00 455.43 471.32 7.95 0.00 61 0.00 0.00 440.06 455.43 7.69 -0.43 62 0.00 0.00 425.19 440.06 7.44 0.00 63 0.00 0.00 410.80 425.19 7.19 0.00 64 0.00 0.00 396.89 410.80 6.96 0.00 65 0.00 0.00 383.42 396.89 6.73 0.00 66 0.00 ._ _ 0.00 370.40 383.42 6.51 0.00 67 0.00 0.00 357.80 370.40 6.30 0.00 68 0.00 0.00 345.54 357.80 6.13 0.00 69 0.00 0.00 333.60 345.54 5.97 0.00 70 0.00 0.00 321.99 333.60 5.81 0.00 71 0.00 0.00 310.68 321.99 5.65 0.00 72 0.00 0.00 299.68 310.68 5.50 0.00 73 0.00 0.00 288.97 299.68 5.35 0.00 74 0.00 0.00 278.55 288.97 5.21 0.00 75 0.00 0.00 268.41 278.55 5.07 0.00 76 0.00 0.00 258.54 268.41 4.94 0.00 77 0.00 0.00 248.93 258.54 4.80 0.00 78 0.00 0.00 239.58 248.93 4.68 0.00 79 0.00 0.00 230.48 239.58 4.55 0.00 80 0.00 0.00 221.62 230.48 4.43 0.00 81 0.00 0.00 213.00 221.62 4.31 0.00 82 0.00 0.00 204.61 213.00 4.19 0.00 83 0.00 0.00 196.45 204.61 4.08 0.00 84 0.00 0.00 188.50 196.45 3.97 0.00 85 0.00 0.00 180.77 188.50 3.87 0.00 86 0.00 0.00 173.24 180.77 3.76 0.00 87 0.00 0.00 165.92 173.24 3.66 0.00 88 0.00 0.00 158.79 165.92 3.56 0.00 89 0.00 0.00 151.85 158.79 3.47 0.00 90 0.00 0.00 145.10 151.85 3.38 0.00 91 0.00 0.00 138.52 145.10 3.29 0.00 Pond2-Routing.xls O O O O O O 0 a0 t0 N 1 1 v m N 10 U L N N O1 �� 0 N Dr W N a� ao O O O O O O O O d N O 00 B�.IBI{�SIQ 0 rn 0 co O r 0 O co N O 0 m C lL cd G_ ~ O O m 0 N O O O O O O O O O O m V N O Storage Routing Analysis CC Creations South Pond 100-Year Storm Event Pond Pre-Dev Time Inflow 11+12 Discharge Discharge 2slt-0 2s/t+O min.) (cfs) (cfs), cfs cfs 0 0.00 0.00 0.00 0.00 0.00 0.00 1 2.67 2.67 2.48 2.67 0.09 0.91 2 5.34 8.00 9.77 10.49 0.36 1.82 3 8.00 13.34 21.52 23.11 0.80 2.72 4 10.67 18.68 37.42 40.19 1.38 3.63 5 13.34 24.01 57.21 61.44 2.12 4.54 6 16.01 29.35 81.55 86.55 2.50 5.45 7 18.68 34.68 110.43 116.23 2.90 6.35 8 21.34 40.02 143.74 150.45 3.36 7.26 9 24.01 45.36 181.34 189.09 3.87 8.17 10 26.68 50.69 223.14 232.03 4.45 9.08 11 29.35 56.03 269.00 279.16 5.08 9.98 12 32.02 61.36 318.84 330.37 5.76 10.89 13 34.68 66.70 372.45 385.54 6.55 11.80 14 37.35 72.04 429.47 444.48 7.51 12.71 15 40.02 - - 77.37 489.79 606.84 8.52 13.61 16 38.69 78.71 549.44 568.50 9.53 14.52 17 37.35 76.04 604.56 625.48 10.46 15.43 18 36.02 73.37 655.30 677.93 11.31 16.34 19 34.68 70.70 701.81 726.01 12.10 17.24 20 33.35 68.03 744.22 769.85 12.81 18_15 21 32.02 65.37 782.67 809.59 13.46 17.70 22 30.68 62.70 817.29 845.37 14.04 17.24 23 29.35 60.03 848.06 877.32 14.63 16.79 24 28.01 57.36 875.13 905.42 15.15 16.34 25 26.68 54.69 898.62 929.82 15.60 15.88 26 25.35 52.03 918.67 950.64 15.99 15.43 27 24.01 49.36 935.41 968.03 16.31 14.97 28 22.68 46.69 948.95 982.10 16.57 14.52 29 21.34 44.02 959.43 992.98 16.77 14.07 30 20.01 41.35 966.95 1000.78 16.92 13.61 31 18.68 38.69 971.62 1005.63 17.01 13.16 32 17.34 36.02 973.55 1007.64 17_05 12.71 33 16.01 33.35 972.83 1006.90 17.03 12.25 34 14.67 30.68 969.58 1003.52 16.97 11.80 35 13.34 28.01 963.87 997.59 16.86 11.34 36 12.01 25.35 955.81 989.22 16.70 %89 37 10.67 22.68 945.48 978.49 16.50 10.44 38 9.34 20.01 932.97 965.49 16.26 9.98 39 8.00 17.34 918.35 950.31 15.98 9.53 40 6.67 14.67 901.70 933.02 15.66 9.08 41 5.34 12.01 883.10 913.70 15.30 8.62 42 4.00 9.34 862.62 892.44 14.91 8.17 43 2.67 6.67 840.34 869.29 14.48 7.71 44 1.33 4.00 816.29 844.34 14.03 7.26 45 0.00 1.33 790.44 817.62 13.59 6.81 46 0.00 0.00 764.15 790.44 13.15 6.35 47 0.00 0.00 738.71 764.15 12.72 5.90 48 0.00 0.00 714.10 738.71 12.30 5.45 PondMouting.xls Storage Routing Analysis CC Creations South Pond 100-Year Storm Event Pond Pre-Dev Time Inflow 11+12 Discharge Discharge 2s/t-0 2sIt+O min. cfs cfs cfs cfs 49 0.00 0.00 690.30 714.10 11.90 4.99 50 0.00 0.00 667.27 690.30 11.51 4.54 51 0.00 0.00 644.99 667.27 11.14 4.08 52 0.00 0.00 623.44 644.99 10.78 3.63 53 0.00 0.00 602.59 623.44 10.42 3.18 54 0.00 0.00 582.42 602.59 10.08 2.72 55 0.00 0.00 562.91 582.42 9.76 2.27 56 0.00 0.00 544.03 562.91 9.44 1,82 57 0.00 0.00 525.77 544.03 9.13 1.36 58 0.00 0.00 508.10 525.77 8.83 0.91 59 0.00 0.00 491.01 508.10 8.54 0.45 60 0.00 0.00 474.48 491.01 8.27 0.00 61 0.00 0.00 458.49 474.48 8.00 -0.45 62 0.00 0.00 443.02 458.49 7.74 0.00 63 0.00 0.00 428.05 443.02 7.48 0.00 64 0.00 - 0.00 413.57 428.05 7.24 0.00 65 0.00 0.00 399.56 413.57 7.00 0.00 66 0.00 0.00 386.01 399.56 6.78 0.00 67 0.00 0.00 372.90 386.01 6.55 0.00 68 0.00 0.00 360.22 372.90 6.34 0.00 69 0.00 0.00 347.89 360.22 6.16 0.00 70 0.00 0.00 335.90 347.89 6.00 0.00 71 0.00 0.00 324,22 335.90 5.84 0.00 72 0.00 0.00 312.85 324.22 5.68 0.00 73 0.00 0.00 301.79 312.85 5.53 0.00 74 0.00 0.00 291.03 301.79 5.38 0.00 75 0.00 0.00 280.55 291.03 5.24 0.00 76 0.00 0.00 270.36 280.55 5.10 0.00 77 0.00 0.00 260.43 270.36 4.96 0.00 78 0.00 0.00 250.77 260.43 4.83 0.00 79 0.00 0.00 241.38 250.77 4.70 0.00 80 0.00 0.00 232.23 241.38 4.57 0.00 81 0.00 0.00 223.32 232.23 4.45 0.00 82 0.00 0.00 214.66 223.32 4.33 0.00 83 0.00 0.00 206.23 214.66 4.22 0.00 84 0.00 0.00 198.02 206.23 4.10 0.00 85 0.00 0.00 190.03 198.02 3.99 0.00 86 0.00 0.00 182.26 190.03 3.89 0.00 87 0.00 0.00 174.69 182.26 3.78 0.00 88 0.00 0.00 167.32 174.69 3.68 0.00 89 0.00 0.00 160.16 167.32 3.58 0.00 90 0.00 0.00 153.18 160.16 3.49 0.00 Pond2-Routing.xis - Exhibit A Drainage Area Map — Pre & Post Development Exhibit B Existing Pond Grading Plan byg ��t9ippg@¢ e�88 ° gEg'g60 'P�S � r ePi eFB� @ 9 u q�E O z a o i e I •C 1 � — I I � IIIII I 11 I \ I I I I --I— • I 1 , , 1 , I I — 1 W\ €1 p° II 1I $ Y @@gg ig Jpdp g av 3$nPn $ @g3 BY$b s a $yg°eo s 9@ Ys4s T� vg6 e 4Y y ge pyY €$ee@ e�ey 9€� °E y Jill, gg fiq b d 411 q. 4va8i q@q 3 gt¢ 1 gtld� €gex a€�,dP i`g 64e¢ ggq e k "a4 6 .._I OPpg`5@ %p y° gfi $y E22@4ffi aqq xx 8 ¢g e 9 y Ids 9 Sill d Yaagd§ 9@ °0 JB6$ leg ali% Ya 3d9�g g€g€g�3 i fit: ea i '(V }—i O . 4i g° i ¢ge` §e4• g9a" 8.4lg"43 Bgg$ PR q a IRV ¢ � °3 11 @.� A a g 3 $a s a �.$ - '� � a y101 -01• 9. 9€ 1 Fba x 9`ggy § £ �3�a� Y�ssgI q3l� 11 Yaa4 a�g41� YY Ydi��a E¢ 1� �e�a iY YW�B€ Y r gill66 a 2t�ss "xn