Loading...
HomeMy WebLinkAboutDrainage LetterMay 5, 2011 Josh Norton City of College Station Development Services P.O. Box 1100 College Station, TX 77840 RE: Capstone Leasing Trailer Drainage Letter Dear Josh, As requested we have reviewed the impact of the leasing trailer on the surrounding drainage system. Because this is a temporary installation (approximately 14 months), we do not feel it warrants any drainage infrastructure. We base that on the following analysis. In the Capstone Phase 1 Plat Drainage Addendum Letter dated March 2011, we discussed that the drainage infrastructure for Holleman Drive included the runoff from a fully developed and undetained Lot 1, Block 3, 0.88 acres. All drainage systems in Holleman Drive were designed to accommodate this undetained flow from this lot. In addition, we noted that in the original hydraulic model we accounted for this increased impervious cover from the street system and this one 0.88 acre lot to flow to the stream undetained and illustrated that it had negligible effect on the downstream system. We do not anticipate construction on Lot 1, Block 3 until well after the leasing trailer has been removed from the site. The size and impervious cover for the leasing trailer is less that that assumed for the 0.88 acre lot. With this construction sequencing, all impervious cover has been reviewed and modeled and there will not be any adverse impacts to the downstream properties. If you have any questions, please feel free to contact me. you, Veronica J.'B. M�T��n, PE Managing Partne Attachments cc: file W-RO ICAJ B MOMAt .............. .11 77689 :'/t -i1 511 UNIVERSITY DRIVE EAST, SUITE 204 • COLLEGE STATION, TX 77840 • T. 979.260.6963 • F. 979.260.3564 CIVIL ENGINEERING • HYDRAULICS HYDROLOGY UTILRIES • STREETS • SITE PLANS • SUBDIVISIONS info®mitchellandmorgan.com w .mitchellandmorgan.com