Loading...
HomeMy WebLinkAboutStaff Comments(*t/4" CITY OF COLLEGE STATION Home of T.eruA&M UnivmiV* 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM June 9, 2011 TO: Chuck Ellison, via email: chuckCa)ellisonlaw.com V W FROM: Molly Hitchcock, AICP Planning Administrator SUBJECT: TOWER POINT PH 10A L4,5&6 B3 (FP) Thank you for the submittal of your Final Plat application. This project will be distributed to staff next week for their review. cc: College Station Marketplace, L.P., via email: and einer a weinerdev ment.com✓ Kling Engineering & Surveying, via email: stewartaa.klingeng.com Case file no. 11-00500091 P nning & Development Services ' 1101 Texas Avenue, P.O. Box 9960 _ College Station, Texas 77542 Crzi or Cor,i.i.cl� SrnTlon Phone 979.764.3570 / Fax 979.764.3496 Home afTexas11dM tfnivri:sity' MEMORANDUM June 20, 2011 TO: Chuck Ellison, via email: chuck(a)ellisonlaw.com FROM: Lauren A. Hovde, Staff Planner SUBJECT: TOWER POINT PH 10A - Final Plat Staff reviewed the above -mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Friday, July 1, 2011, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for, July 21, 2011, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. One (1) 24"x36" copy of the revised final plat; Thirteen (13) 11 "x17" copies of the revised final plat; One (1) Mylar original of the revised final plat (required after P&Z approval); and One (1) copy of the digital file of the final plat on diskette or e-mail to: P&DS_Digital_Submittal@cstx.gov. Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.qov/pz Please note that a Mylar original of the revised final plat will be required after P&Z approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: College Station Marketplace, L.P., via email: and weiner weinerdeve ment.com� Kling Engineering & Surveying, via email: stewart(o)klingena.com t Case file #11-00500091 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 1 of 3 STAFF REVIEW COMMENTS NO. 1 Project: TOWER POINT PH 10A (FP) - 11-00500091 PLANNING 1. There are several difference between the approved Certifications found in Section 8.8 of the UDO and what is shown on the plat. This language was changed with the latest revision of the Article 8. Please review this section and make all applicable changes. For example: CERTIFICATE OF OWNERSHIP AND DEDICATION- I (we) , owner(s) and developer(s) of the land shown on this plat, and designated herein as the Subdivision to the City of College Station, Texas, and whose name(s) is/are subscribed hereto, hereby dedicate to the use of the public forever all streets, alleys, parks, greenways, infrastructure, easements, and public places thereon shown for the purpose and consideration therein expressed. All such dedications shall be in fee simple unless expressly provided otherwise. 2. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. 3. Please note that you may be required to submit paid tax certificates if they are not current prior to the filing of your plat. 4. The construction documents and reports are still under review and may affect the plat. Reviewed by: Lauren A. Hovde, Staff Planner Date: June 13, 2011 TxDOT Comments 1. Future access to these lots should be planned through internal circulation in accord with the existing access drives established under the overall master plan. No additional access points to the SH 6 southbound frontage road. Reviewed by: Chad Bohne Date: June 15, 2011 ENGINEERING COMMENTS NO. 1 1. The following easements are shown on the title report but not referenced on the plat. Please verify that they are applicable: a. Wellborn SUD Easement b. BTU Blanket Easement 2. The following easement is shown on the property according to our GIS system but not referenced on the plat. Please verify that it is applicable: a. Public Utility Easement — Vol.670, P.16 3. Infrastructure (i.e. water and sanitary sewer) is required to be extended to all lots prior to filing the final plat. Please submit Development Permit Application and all associated construction documents. 4. FYI... Please note that easements shown on the plat will be re-evaluated after construction documents are submitted and may require additional revisions to the plat. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your neat transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 3 5. FYI ... The construction documents for public infrastructure must be approved prior to the plat being scheduled for a P&Z Meeting. 6. The proposed 20-ft PUE located adjacent to Lot 4 must be dedicated prior to the plat being forwarded to P&Z. 7. Why does the proposed 15-ft PUE on Lot 6 curve as shown? What infrastructure is proposed to be within this PUE? Reviewed by: Erika Bridges Date: 6/20/11 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. Developer will provide temporary blanket easement for construction purposes and provide descriptive easements for electric infrastructure as designed by CSU for electric lines (where applicable). 2. Developer may be responsible for locating easements on site to insure that electrical infrastructure is installed within easement boundaries. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer provides 30' of rigid or IMC conduit for riser poles. CSU installs riser. 4. Developer will intercept existing conduit at designated transformers, other existing devices or locations and extend as required. 5. If conduit does not exist at designated transformer or other existing devices or locations, developer will furnish and install conduit as shown on CSU electrical layout. 6. Developer pours electric device pads or footings (i.e. transformers, pull boxes etc) per CSU specs and design. 7. Developer installs pull boxes per CSU specs and design (pull boxes and provided by CSU). 8. Developer provides digital AutoCAD 2000 or later version of plat and / or site plan. Email to: gmartinez(a)cstx.gov. 9. Developer provides load data to CSU as soon as it is available to avoid construction delays. Delivery time for transformers not in stock is approximately 40 weeks. 10. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformer(s), pull box(es), switchgear(s), meter location and conduit routing as designed by CSU. 11. To discuss any of the above electrical comments please contact Gilbert Martinez at 979,764.6255. Reviewed by: Gilbert Martinez Date: 06.17.2011 SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: June 15, 2011 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 3 of 3 tl"" Planning & Development Services (*1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 CITYOF COI.I.HGE STATION Phone 979.764.3570 / Fax 979.764.3496 Nome of7exntAd*f Uninenky' MEMORANDUM July 8, 2011 V TO: Chuck Ellison via email: chuck@ellisonlaw.com FROM: Lauren A. Hovde, Staff Planner SUBJECT: TOWER POINT PH 10A - Final Plat Comments #2 Staff reviewed the above -mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address all comments to be scheduled for the next available Planning and Zoning Commission meeting. One (1) 24"x36" copy of the revised final plat; Thirteen (13) 11 "x17" copies of the revised final plat; One (1) Mylar original of the revised final plat (required after P&Z approval); and One (1) copy of the digital file of the final plat on diskette or e-mail to: P&DS_Digital_Submittal@cstx.gov. Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.qov/pz Please note that a Mylar original of the revised final plat will be required after P&Z approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments Li cc: College Station Marketplace via email: andyweiner(c)weinerdevelopment.com College Station Marketplace via email: mcoontz(a)weinerdevelopment.com L Kling Engineering and Surveying via email: stewartoklingeng.com Kevin Sullivan via email: ksullivan@walterpmoore.com Case file #11-00500091 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 1 of 2 STAFF REVIEW COMMENTS NO. 1 Project: TOWER POINT PH 10A (FP) - 11-00500091 PLANNING NO.2 (Repeat) There are several difference between the approved Certifications found in Section 8.8 of the UDO and what is shown on the plat. If this language is not shown as described in Section 8.8 of the UDO, the final plat cannot be considered compliant with subdivision regulations. Reviewed by: Lauren A. Hovde, Staff Planner Date: July 1, 2011 ENGINEERING COMMENTS NO. 2 1. (Repeat) The following easement is shown on the property according to our GIS system but not referenced on the plat. Please verify that it is applicable: Public Utility Easement — Vol.670, P.16 The GIS system also references Vol.670, P.15. 2. (Repeat) Infrastructure (i.e. water and sanitary sewer) is required to be extended to all lots prior to filing the final plat. Please submit Development Permit Application and all associated construction documents. We still have not received infrastructure plans and documents. 3. (Repeat) FYI... Please note that easements shown on the plat will be re-evaluated after construction documents are submitted and may require additional revisions to the plat. 4. (Repeat) FYI... The construction documents for public infrastructure must be approved prior to the plat being scheduled for a P&Z Meeting. Without the infrastructure plans approved, the plat will not be scheduled for a P&Z meeting. 5. (Repeat) The proposed 20-ft PUE located adjacent to Lot 4 must be dedicated prior to the plat being forwarded to P&Z. The 20-ft PUE must be dedicated prior to the plat going forward since it is satisfying the 20-ft rear lot PUE requirement. The plat will not be in compliance with the LIDO without the dedicated easement. 6. (Repeat) Why does the proposed 15-ft PUE on Lot 6 curve as shown? What infrastructure is proposed to be within this PUE? This will be evaluated when the construction plans are submitted. Reviewed by: Erika Bridges Date: 7/7/11 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 2