April 21, 2011
Mr. Joe Guerra Jr. AICP, PTO
Transportation Planning Coordinator
City of College Station
1101 Texas Avenue
College Station, TX 77842
Re: Tower Point Development TIA
Walter P Moore Project: 23.05040.14
Dear Joe:
Attached is a copy of the traffic impact analysis letter for lots 7, 8, 18, and 30 of the Tower Point
Development that was previously submitted for review on April 7, 2011. We are re -submitting this
letter, unchanged, until we meet with you to discuss the mitigation options and TIA requirements
that you identified. Once an agreement is made, we will revise and re -submit the letter as necessary.
If you have any questions about this, please let me know.
Sincerely,
WALTER P. MOORE AND ASSOCIATES, INC.
/�" L'I /')
Randolph Schulze, PE, PTOE, PTP
Principal
1301 MCKINNEY, SUITE 1100
HOUSTON, TEXAS 77010
PHONE: 713.630.7300 FAX: 713.630.7396
www.WALTERPMOORE.c.m
WALTER P MOORE
April 7, 2011
Lauren Hovde, Staff Planner
City of College Station Planning and Development
1101 Texas Avenue South
College Station, Texas 77842
Re: Traffic Impact Analysis for Lot 7, 8, 18, and 3C
Tower Point Development
College Station, Texas
Walter P Moore Project Number 23-05040-14
Dear Ms. Hovde
This letter is to provide an assessment of the relative traffic impact associated Wth four lots within
the large retail parcel of the Tower Point Development, located on the northwest corner of Highway
6 and Highway 40 in College Station. This assessment builds upon the previously submitted traffic
impact analysis for Tower Point developed by Walter P Moore and submitted to the City of College
Station in December 2009. Background traffic volumes, lane configurations along roadways and at
intersections and driveways, and anticipated land uses of other parcels are assumed to be
unchanged from the previous TIA. Trip distributions are also assumed to be unchanged.
Since the analysis in the TIA was for the AM and PM peak hours of the roadways, the rates for the
adjacent street were used. The rates shown in this letter are consistent with the rates used in the
previous TIA which was approved in February 2010 for the complete development. It should be
noted that Trip Generation does not provide rates for the AM peak hour of the adjacent street since
most retail establishments do not have a high AM peak hour volume. For this reason, an average
trip generation rate of 0.3 for the AM peak hour and the ITE rates for the PM peak hour of the
adjacent street were used. This report will compare the trip generation values for the previously
assumed land use for this parcel with the proposed land use.
This letter report addresses four lots. In the previous TIA, three parcels in question were identified as
lots 7, 8, and 18. The parcel identified as Lot 30 was not identified in the previous TIA. This parcel is
located off of Arrington Road, north of the detention pond. Three of the proposed lots surround the
HEB development south of the roundabout at Arrington Road, and one is located to the north of the
roundabout. The locations of the lots relative to the Tower Point development are shown in Figure 1.
1301 MCKINNEY, SUITE 1100
HOUSTON. TEXAS 77010
PHONE: 713.630.7300 FAX: 713.630.7396
www.WALTERPMOORE.co.
Ms. Lauren Hovde
City of College Station
April 7, 2011
Page 2
Proposed Lot 30
HighTumoverSit
Down Restaurant
Analysis
Proposed Lot 7
Fast Food Restaurant
Proposed Lot 6
Drive-in Bank -
�lh
Proposed Lot 19
Fast Food Restaura
Figure 1
Location of the Proposed Developments
Within the Tower Point Development
The previously assumed land use for Lots 7 and 8 were "High -Turnover Sit -Down Restaurant" (ITE
Land Us Code 932), Now, Lot 7 is proposed to be a "Fast Food Restaurant with Drive -through" (ITE
Land Use Code 934) and Lot 8 is proposed to be a "Drive-in Bank" (ITE Land Use Code 912). Lot
18 was previously assumed to be a "Tire Store" (ITE Land Use Code 848) and is proposed to be a
"Fast Food Restaurant with Drive -through" (ITE Land Use Code 934). Lot 30 is Intended to be a
"High -Turnover Sit -Down Restaurant" (ITE Land Use Code 932). The sizes of the planned lots are as
follows; Lot 7 is 4,500 square feet, Lot 8 is 3,640 square feet, Lot 18 is 2,950 square feet, and Lot
30 is 7,506 square feet. Table 1 shows a comparison of the previously defined land uses and square
footage and the proposed developments.
Ms. Lauren Hovde
City of College Station
April 7, 2011
Page 3
TABLE 1
Comparison of Land Use and Square Footages
Tower Point
College Station, Texas
Land Use
Square Foota e
Parcel
December 2009 TIA
Current Letter
December
Current Letter
4/7/2011
2009 TIA
4/7/2011
High -Turnover Sit-
Fast Food Restaurant
Lot 7
Down Restaurant
with Drive Through
5,600
4,500
High -Turnover Sit-
Lot 8
Down Restaurant
Drive-in Bank
5,600
3,640
Lot 18
Tire Store
Fast Food Restaurant
7,500
2,950
with Drive Through
Lot 30
n/a
High -Turnover Sk-
n/a
7,506
Down Restaurant
To complete a study for a proposed development, the number of trips expected to be generated by
the planned facilities must be determined. The number of trips generated by the development
during an average weekday and for weekday peak hours is based on factors such as the land use
type and size of the building. Standard rates from the Institute of Transportation Engineers (ITE)
publication, Trip Generation Manual, 60 Edition, were used to determine the amount of traffic
generated by the various land uses in the proposed development.
Trip sharing among all the parcels associated with the large retail parcel of Tower Point was
assumed to be 10%. A comparison of the anticipated trip generation between the previous report
and the proposed conditions is presented in Table 2.
Ms. Lauren Hovde
City of College Station
April 7, 2011
Page 4
TABLE 2
Comparison of Net Vehicular Trip Generation Estimates
Tower Point
Collecie Station, Texas
Weekday
A.M.
Peak
P.M.
Peak
Gross ITE
Net Vehicle
Gross ITE
Net Vehicle
Size
Shared
Land Use
and
Tri
Gross
Net
Net
Trips
Trips
Trips
Trips
(ITE Code)
Units
Factor
ITE
Trips
Trips
Enter
Exit
Enter
Exit
Enter
Exit
Enter
Exit
Assumed Land Use from December 2009 Traffic Impact Analysis
hit-
5,600°SF
10%
712
641
34
31
31
28
37
25
33
23
ntghit-
F
5'S00
10%
712
641
34
31
31
28
37
25
33
23
Restaurant
932)
Lot 18—Tire
7,500
10%
187
168
14
8
13
7
13
18
12
16
Store (848)
SF
Lot 30
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
Subtotal
1 S 00
-
1,611
1,450
81
71
75
63
86
69
78
62
Proposed Land Use
Lot 7 - Fast
Food
4,500
10%
2,233
2,010
113
109
102
98
79
73
71
66
Restaurant
SF
(934)
Lot 8 — Drive
3,640
10%
539
485
25
20
23
21
47
47
42
42
in Bank (912)
SF
Lot 18 - Fast
Food
2,950
10%
1,464
1,318
74
72
67
65
52
48
47
43
Restaurant
SF
(934)
Lot 30 - High
Turnover Sit-
7,506
Down
°
10%
954
859
45
41
41
37
50
34
45
31
SF
Restaurant
(932)
Subtotal
1 6
-
5,190
4,672
258
241
233
221
228
202
205
182
SF
CHANGE
104
0%
3,579
3,222
177
170
158
158
142
133
127
120
Ms. Lauren Hovde
City of College Station
April 7, 2011
Page 5
The development has had changes to the land uses in the past. To accurately assess the impact to
the roadways it is important to look at the changes in the development cumulatively. Table 3
provides a cumulative summary of previous TIA letters highlighting the land use changes.
TABLE 3
Summary of Past Land Use Changes
Tower Point
College Station, Texas
Land Use
Increase or Decrease in Total Trips (Net)
TIA
Lot
Total
AM trips
PM trips
Letter
Previous
Current
trips
Enter
Exit
Enter
Exit
July 7,
28
Specialty Retail
Specialty Retail
-80
0
0
-2
-3
2010
(814)
(814)
March
16,
15
Fast Food
Specialty Retail
-1,289
-73
-70
-47
-42
Restaurant (934)
(814)
2011
Current
High Turnover
Fast.Food
letter
7
Sit -Down
Restaurant (934)
+1,369
+71
+70
+38
+43
Restaurant (932)
Current8
Turnover
iBank
Drive-156
letterrNigh
Sit -Down
91
(2)
-8
-7
+9
+19
Restaurant (932)
Current
18
Tire Store (848)
Fast Food
+1150
+54
+58
+33
+27
letter
Restaurant (934)
High Turnover
Curren[
30
n/a
Sit -Down
+859
+41
+37
+45
+31
letter
Restaurant (932)
Total
+1853
+85
+88
+76
+75
As seen above in Table 3, the changes in land use that have occurred generate less than 100 net
trips in either peak hour. This is less than what is typically needed to require a new traffic impact
study.
Summary
The proposed land uses are anticipated to generate more trips than the land use assumed in the
previous TIA. One major source of these new trips is the fire store being replaced with a fast food
restaurant. However, the tire store land use is anticipated to relocate to Lot 20, which would replace
a planned fast food restaurant with drive through. The new development at Lot 30 is the other
development contributing to the additional generated trips. This development is expected to
generate less than 50 entering or exiting trips in the peak hour.
As the developer continues to make agreements for individual parcels, land uses are being adjusted
to create a better overall development. Since some land uses are still being adjusted it is possible
that the total change in trips could decrease or equal what is shown in the original TIA. It is our
understanding that the developer will continue to provide TIA update letters to reflect future changes
as they occur.
Ms. Lauren Hovde
City of College Station
April 7, 2011
Page 6
Please let me know if you have any questions or need additional information.
Yours very truly,
WALTER P. MOORE AND ASSOCIATES, INC.
Jennifer L. Peek, P.E., PTOE, PTP
Principal
CC: Andy Weiner, Weiner Development Corporation
Mike Coontz, Weiner Development Corporation
Kevin Sullivan, P.E., Waiter P Moore
P:\23\2005\05040-14\Design & Studies\Reports\Mutliple Lot TIA Letter.doe
Document Incomplete:
Not intended for permit or Construction
Engineer: Jennifer L. Peek, P.E.
P.E. Serial No. 90254
Date: April 7, 2011
Walter P. Moore and Associates, Inc.