Loading...
HomeMy WebLinkAboutTIAWALTER P MOORE April 21, 2011 Mr. Joe Guerra Jr. AICP, PTO Transportation Planning Coordinator City of College Station 1101 Texas Avenue College Station, TX 77842 Re: Tower Point Development TIA Walter P Moore Project: 23.05040.14 Dear Joe: Attached is a copy of the traffic impact analysis letter for lots 7, 8, 18, and 30 of the Tower Point Development that was previously submitted for review on April 7, 2011. We are re -submitting this letter, unchanged, until we meet with you to discuss the mitigation options and TIA requirements that you identified. Once an agreement is made, we will revise and re -submit the letter as necessary. If you have any questions about this, please let me know. Sincerely, WALTER P. MOORE AND ASSOCIATES, INC. /�" L'I /') Randolph Schulze, PE, PTOE, PTP Principal 1301 MCKINNEY, SUITE 1100 HOUSTON, TEXAS 77010 PHONE: 713.630.7300 FAX: 713.630.7396 www.WALTERPMOORE.c.m WALTER P MOORE April 7, 2011 Lauren Hovde, Staff Planner City of College Station Planning and Development 1101 Texas Avenue South College Station, Texas 77842 Re: Traffic Impact Analysis for Lot 7, 8, 18, and 3C Tower Point Development College Station, Texas Walter P Moore Project Number 23-05040-14 Dear Ms. Hovde This letter is to provide an assessment of the relative traffic impact associated Wth four lots within the large retail parcel of the Tower Point Development, located on the northwest corner of Highway 6 and Highway 40 in College Station. This assessment builds upon the previously submitted traffic impact analysis for Tower Point developed by Walter P Moore and submitted to the City of College Station in December 2009. Background traffic volumes, lane configurations along roadways and at intersections and driveways, and anticipated land uses of other parcels are assumed to be unchanged from the previous TIA. Trip distributions are also assumed to be unchanged. Since the analysis in the TIA was for the AM and PM peak hours of the roadways, the rates for the adjacent street were used. The rates shown in this letter are consistent with the rates used in the previous TIA which was approved in February 2010 for the complete development. It should be noted that Trip Generation does not provide rates for the AM peak hour of the adjacent street since most retail establishments do not have a high AM peak hour volume. For this reason, an average trip generation rate of 0.3 for the AM peak hour and the ITE rates for the PM peak hour of the adjacent street were used. This report will compare the trip generation values for the previously assumed land use for this parcel with the proposed land use. This letter report addresses four lots. In the previous TIA, three parcels in question were identified as lots 7, 8, and 18. The parcel identified as Lot 30 was not identified in the previous TIA. This parcel is located off of Arrington Road, north of the detention pond. Three of the proposed lots surround the HEB development south of the roundabout at Arrington Road, and one is located to the north of the roundabout. The locations of the lots relative to the Tower Point development are shown in Figure 1. 1301 MCKINNEY, SUITE 1100 HOUSTON. TEXAS 77010 PHONE: 713.630.7300 FAX: 713.630.7396 www.WALTERPMOORE.co. Ms. Lauren Hovde City of College Station April 7, 2011 Page 2 Proposed Lot 30 HighTumoverSit Down Restaurant Analysis Proposed Lot 7 Fast Food Restaurant Proposed Lot 6 Drive-in Bank - �lh Proposed Lot 19 Fast Food Restaura Figure 1 Location of the Proposed Developments Within the Tower Point Development The previously assumed land use for Lots 7 and 8 were "High -Turnover Sit -Down Restaurant" (ITE Land Us Code 932), Now, Lot 7 is proposed to be a "Fast Food Restaurant with Drive -through" (ITE Land Use Code 934) and Lot 8 is proposed to be a "Drive-in Bank" (ITE Land Use Code 912). Lot 18 was previously assumed to be a "Tire Store" (ITE Land Use Code 848) and is proposed to be a "Fast Food Restaurant with Drive -through" (ITE Land Use Code 934). Lot 30 is Intended to be a "High -Turnover Sit -Down Restaurant" (ITE Land Use Code 932). The sizes of the planned lots are as follows; Lot 7 is 4,500 square feet, Lot 8 is 3,640 square feet, Lot 18 is 2,950 square feet, and Lot 30 is 7,506 square feet. Table 1 shows a comparison of the previously defined land uses and square footage and the proposed developments. Ms. Lauren Hovde City of College Station April 7, 2011 Page 3 TABLE 1 Comparison of Land Use and Square Footages Tower Point College Station, Texas Land Use Square Foota e Parcel December 2009 TIA Current Letter December Current Letter 4/7/2011 2009 TIA 4/7/2011 High -Turnover Sit- Fast Food Restaurant Lot 7 Down Restaurant with Drive Through 5,600 4,500 High -Turnover Sit- Lot 8 Down Restaurant Drive-in Bank 5,600 3,640 Lot 18 Tire Store Fast Food Restaurant 7,500 2,950 with Drive Through Lot 30 n/a High -Turnover Sk- n/a 7,506 Down Restaurant To complete a study for a proposed development, the number of trips expected to be generated by the planned facilities must be determined. The number of trips generated by the development during an average weekday and for weekday peak hours is based on factors such as the land use type and size of the building. Standard rates from the Institute of Transportation Engineers (ITE) publication, Trip Generation Manual, 60 Edition, were used to determine the amount of traffic generated by the various land uses in the proposed development. Trip sharing among all the parcels associated with the large retail parcel of Tower Point was assumed to be 10%. A comparison of the anticipated trip generation between the previous report and the proposed conditions is presented in Table 2. Ms. Lauren Hovde City of College Station April 7, 2011 Page 4 TABLE 2 Comparison of Net Vehicular Trip Generation Estimates Tower Point Collecie Station, Texas Weekday A.M. Peak P.M. Peak Gross ITE Net Vehicle Gross ITE Net Vehicle Size Shared Land Use and Tri Gross Net Net Trips Trips Trips Trips (ITE Code) Units Factor ITE Trips Trips Enter Exit Enter Exit Enter Exit Enter Exit Assumed Land Use from December 2009 Traffic Impact Analysis hit- 5,600°SF 10% 712 641 34 31 31 28 37 25 33 23 ntghit- F 5'S00 10% 712 641 34 31 31 28 37 25 33 23 Restaurant 932) Lot 18—Tire 7,500 10% 187 168 14 8 13 7 13 18 12 16 Store (848) SF Lot 30 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a Subtotal 1 S 00 - 1,611 1,450 81 71 75 63 86 69 78 62 Proposed Land Use Lot 7 - Fast Food 4,500 10% 2,233 2,010 113 109 102 98 79 73 71 66 Restaurant SF (934) Lot 8 — Drive 3,640 10% 539 485 25 20 23 21 47 47 42 42 in Bank (912) SF Lot 18 - Fast Food 2,950 10% 1,464 1,318 74 72 67 65 52 48 47 43 Restaurant SF (934) Lot 30 - High Turnover Sit- 7,506 Down ° 10% 954 859 45 41 41 37 50 34 45 31 SF Restaurant (932) Subtotal 1 6 - 5,190 4,672 258 241 233 221 228 202 205 182 SF CHANGE 104 0% 3,579 3,222 177 170 158 158 142 133 127 120 Ms. Lauren Hovde City of College Station April 7, 2011 Page 5 The development has had changes to the land uses in the past. To accurately assess the impact to the roadways it is important to look at the changes in the development cumulatively. Table 3 provides a cumulative summary of previous TIA letters highlighting the land use changes. TABLE 3 Summary of Past Land Use Changes Tower Point College Station, Texas Land Use Increase or Decrease in Total Trips (Net) TIA Lot Total AM trips PM trips Letter Previous Current trips Enter Exit Enter Exit July 7, 28 Specialty Retail Specialty Retail -80 0 0 -2 -3 2010 (814) (814) March 16, 15 Fast Food Specialty Retail -1,289 -73 -70 -47 -42 Restaurant (934) (814) 2011 Current High Turnover Fast.Food letter 7 Sit -Down Restaurant (934) +1,369 +71 +70 +38 +43 Restaurant (932) Current8 Turnover iBank Drive-156 letterrNigh Sit -Down 91 (2) -8 -7 +9 +19 Restaurant (932) Current 18 Tire Store (848) Fast Food +1150 +54 +58 +33 +27 letter Restaurant (934) High Turnover Curren[ 30 n/a Sit -Down +859 +41 +37 +45 +31 letter Restaurant (932) Total +1853 +85 +88 +76 +75 As seen above in Table 3, the changes in land use that have occurred generate less than 100 net trips in either peak hour. This is less than what is typically needed to require a new traffic impact study. Summary The proposed land uses are anticipated to generate more trips than the land use assumed in the previous TIA. One major source of these new trips is the fire store being replaced with a fast food restaurant. However, the tire store land use is anticipated to relocate to Lot 20, which would replace a planned fast food restaurant with drive through. The new development at Lot 30 is the other development contributing to the additional generated trips. This development is expected to generate less than 50 entering or exiting trips in the peak hour. As the developer continues to make agreements for individual parcels, land uses are being adjusted to create a better overall development. Since some land uses are still being adjusted it is possible that the total change in trips could decrease or equal what is shown in the original TIA. It is our understanding that the developer will continue to provide TIA update letters to reflect future changes as they occur. Ms. Lauren Hovde City of College Station April 7, 2011 Page 6 Please let me know if you have any questions or need additional information. Yours very truly, WALTER P. MOORE AND ASSOCIATES, INC. Jennifer L. Peek, P.E., PTOE, PTP Principal CC: Andy Weiner, Weiner Development Corporation Mike Coontz, Weiner Development Corporation Kevin Sullivan, P.E., Waiter P Moore P:\23\2005\05040-14\Design & Studies\Reports\Mutliple Lot TIA Letter.doe Document Incomplete: Not intended for permit or Construction Engineer: Jennifer L. Peek, P.E. P.E. Serial No. 90254 Date: April 7, 2011 Walter P. Moore and Associates, Inc.