Loading...
HomeMy WebLinkAboutCorrespondenceCarol Cotter From: Gilbert Martinez Sent: Friday, June 15, 2012 11:05 AM To: Carol Cotter; Stephen A. Maldonado Jr. Cc: Brenda Godfrey; Adam Falco; Alan Gibbs; Tony Michalsky; Timothy Crabb Subject: RE: Easement Dedication for Wither Street Apartments Carol, I have discussed this with CSU admin. All easements should be PUE's to cover any future needs. Regards, Gilbert Martinez College Station Utilities Electric Project Coordinator Phone: 979.764.6255 Fax: 979.764.3452 From: Carol Cotter Sent: Thursday, June 14, 2012 3:36 PM To: Gilbert Martinez; Stephen A. Maldonado Jr. Cc: Brenda Godfrey; Adam Falco; Alan Gibbs Subject: Easement Dedication for Wither Street Apartments Stephen/Gilbert, Please see the attached map and let me know if you are okay with Exhibits A, B, and C being Electric only. The others are full PUEs. Per our standard, the easement documents that we sent them initially were for full PUEs, all Exhibits, but they came back marked up as electric only for A, B, and C. (To be fair, the survey documents they submitted are specific to electric.) My understanding is that it will be easier for them to put in carports if easements are only for electric. Need to know ASAP since they are wanting their CO and we have had these for a while. There is currently a blanket PUE on the property as well as PUEs along the inside perimeter of the property that were dedicated by the plat (also attached). Thanks, Carol DAVIS BROTHERS C O N 5 T R O C T I ON LTD. August 19, 2011 Public Works Department Joshua D. Norton, P.E., CFM Assistant City Engineer City of College Station P. 0. Box 9960 College Station, Texas 77842 RE: U Club Townhomes on Marion Pugh 801 Marion Pugh Drive College Station, TX 77840 Dear Mr. Norton, Davis Brothers Construction (DBC) respectfully request the use of a sanitary/sewer pump truck to be used for building 4 only after the TCO is obtained for this building. The building will be used for leasing purposes only during this time, and no one will be living in it. DBC will take full responsibility for the sewage being pumped out weekly, and we will provide liquid waste manifest to CSU. DBC anticipates the force main will be fully capable after October 2011. Thank you, Robert N. Davis Davis Brothers Construction, Ltd. RND/rrra 2200 LOUETTA SPRING,TEXAS 77388-4705 281 .355.3 800 281.355.3801 FAX -'Ir DAVIS BROTHERS CONSTRUCTION LTD. August 19, 2011 Public Works Department Joshua D. Norton, P.E., CFM Assistant City Engineer City of College Station P. 0. Box 9960 College Station, Texas 77842 RE: U Club Townhomes on Marion Pugh 801 Marion Pugh Drive College Station, TX 77840 Dear Mr. Norton, Davis Brothers Construction (DBC) respectfully request the use of a sanitary/sewer pump truck to be used for building 4 only after the TCO is obtained for this building. The building will be used for leasing purposes only during this time, and no one will be living in it. DBC will take full responsibility for the sewage being pumped out weekly, and we will provide liquid waste manifest to CSU. DBC anticipates the force main will be fully capable after October 2011. Thank you, �A Robert N. Davis Davis Brothers Construction, Ltd. RND/rrra 2200 LOUETTA SPRING,TEXAS 77386-4705 281.355.3600 28T.365.3801 FAX