HomeMy WebLinkAboutCO Punch ListThe Cottages of College Station Punch List for C.O. June 21, 2012 Attendees: • Eldric Fluker, efluker(o)mailcbi,com • Kevin Ellison, kellison@capstonemail.com • Veronica Morgan, Mitchell & Morgan, LLP, v(amitchellandmorgan.com • Rodney Harris, COCS Sanitation, rharris cstx.gov • Raymond Olson, Fire Marshall's Office, rolson(a)cstx.gov • Sonia Cerda, BTU, scerda btutilities.com • David Werley, BTU, dwerleyy(a btutilities.com • Alan Gibbs, COCS Engineer, agibbs a()cstx.gov • Peter Garcia, COCS, p aq rcia@cstx.gov • Stephen Maldonaldo, COCS, smaldonado a�cstx.gov • Justin Tamplin, COCS, itamplin(a cstx.gov • Keith Tinker, COCS, ktinkera(�cstx.gov • Billy Prewitt, BPI, b.prewitt(d,bpitx.com • Kirk Raymond, Goodwin-Lasiter, Inc, kraymond@goodwinlasiter.com • Greg Hopcus, Goodwin-Lasiter, Inc.,.qhopcus(c,goodwinlasiter.com • Chuck McCachren, Cottage Builders, cmccachren@mailcbi.com • Ben McCarty, COCS Building, bmccarty(a,cstx.gov • Danielle Singh, COCS Engineering, dsingh a(,cstx.gov • Jennifer Prochazka, COCS Planning, jprochazkana cstx.gov Cottages Action Items: Eldric explained that the meeting was called to go through a punch list of items that would need to be complete in order for the Cottage project to begin requesting certificates of occupancy. He showed a layout (attached) of how they would like to ask for c.o.'s by phase and the dates when the request will be submitted for each phase. He also explained that the entire site as a whole will also be phased in to 3 phases. Phase 1 delivery will be August 2012, Phase 2 delivery will be January 2013 and Phase 3 delivery will be August 2013. (See attached plan) 1. Sanitation: a. Two dumpster enclosures onsite need to be complete by July 7, 2012 b. Trash compactors do NOT have to be onsite by July 10, 2012 c. Trash compactors are anticipated to be delivered by July 17, 2012 and this will be OK with City 2. Fire: a. Need "No Parking Signs" here to corner on Market Street — meet with Fire Marshal onsite to discuss b. For Phase 1 — everything painted and signed for fire lanes — additional phases do NOT need to be completed at this time c. If Cottages needs to fence off some areas they can as long as Fire is left with a fire lane with turnarounds — No Dead Ends d. Knox padlocks for fire access will need to be installed at the construction fencing that will barricade off the rear (20) phase areas. 3. Planning: a. With the idea that there will be 3 phases of delivery (aug 2012, jan 2013 and aug 2013) we need to have the site plan and landscape/irrigation plan segmented into phase as well. These plans will need to be submitted prior to July 10, 2012 when the first c.o. is requested. b, Cottages will need to Bond Landscaping & Irrigation (full phase 1 — no partials) c. Buffer at back of project must be installed with Phase 1 d. Re-establish ground cover everywhere it has been disturbed e. Temporary Certificate of Occupancy is available as an option if Cottages is okay with this f. Dedication of site easements by replat is okay as long as the replat document is submitted to the City by July?? 2012 . This is given that a temporary blanket easement is dedicated and in place on the project prior to July 10, 2012. To date the city has not received the temp blanket back signed from Capstone. 4. Parking / Transit: a. M&M to email Troy about "No Parking Signs" here to corner on Market Street where Fire Marshal has requested it 5. Engineering- Inspection: a. Water is agreeable to phase "Letters of Completion" by three phases — will need an Exhibit to attach to show what is being accepted with each phase b. All phases need adjustments on services / fire hydrants c. Punch list has been provided to Cottages and all on that punch list must be complete d. City wants to plug main sanitary sewer from Phase 3 to main in Phase 1 to prevent debris and dirt from entering the system until Phase 3 is completed. Phase 2 is OK and doesn't need to be closed off from the Phase 1 system because it has mostly been tied in and the risk of debris entering is minimal. e. Assure that there is sufficient easement width dedicated for the deep sewers 6. BTU: a. Greg Burkhalter will call M&M regarding berms in the BTU easements, as well as the fence and gate question at the Marko's property b. BTU is ok with everything on the project - no issues 7. Building: a. Inspections per building are moving forward — no problems here b. Building Numbers as completed are okay until permanent ones are installed 8. Environmental Services: a. Irrigation —All connections must be tested b. Test all backflow preventers in Phase 1 before C.O. 9. Ponds — Detention: a. Complete before C.O. — July 10, 2012 b. Need a copy of email regarding no dam permit from James @ M&M c. Over flow swales need completion d. Compaction tests notes need to be on as -built plans e. Needs vegetation reestablished (hydroseeding) and assure it is watered and well established on those slopes f. As-builts need to be completed g. Ask for all compaction tests from geotech lab 10. Pond — Irrigation: a. Pond irrigation system RP needs to be tested (1x/year) b. There needs to be an isolation valve (double check) on this irrigation system downstream of the RP 11. As-builts: a. M&M & Goodwin-Lasiter needs these from BPI so that we can draw them up