HomeMy WebLinkAboutCost EstimateBRW Architects, Inc.
College Station Tire Station No. 6
OE Job No. 81.6.005-PA/PB
Engineer's Opinion of Probable Construction Cost for Infrastructure Located in Public R-O-W
Water Distribution System Improvements
Item No.
Description
Quantity
Unit Price
Total Price
1
6" C-900 DR 14 Class 200 PVC Water Line
115 LF
$40.00
$4,600.00
2
2" Schedule 40 PVC Water Line
20 LF
$19.00
$380.00
3
12" X 6" Tapping Sleeve & Valve with Valve Box
1 BA
$3,000.00
$3,000.00
4
6" Gate Valve & Valve Box
2 BA
$950.00
$1,900.00
5
2" Gate Valve & Valve Box
2 BA
$450.00
$900.00
6
Fire Hydrant Unit
1 LA
$3,750.00
$3,750.00
7
Ductile Iron Fittings
0.2 TN
$6,500.00
$1,300.00
8
Trench Safety
25 LF
$2.00
$50.00
Total - Water Distribution System Improvements
$,15,880.00
Sanitary Sewer Collection System Improvements
item No.
Description
Quantity
Unit Price
Total Price
1
6" ASTM D-3034 SDR 26 PVC Sanitary Sewer Line (By
15 LF
$60.00
$900.00
Open Cut)
2
6" ASTM D-3034 SDR 26 PVC Sanitary Sewer Line (By
51 LF
$200.00
$10,200.00
Bore)
1
3
Connect New 6" Sanitary Sewer Linc to Existing Manhole
1 SA
$850.00
$850,00
4
6" Service Cleanout
I FA
$650.00
$650.00
Total - Sanitary Sewer Collection System Improvements
$12,600.00
Page 1 of 2
Storm. Sewer System Improvements
Item No.
Description
Quantity
Unit Price
Total Price
1
24" Class IV RCP Storm Sewer (By Open Cut)
420 LF
$1 10.00
$46,200.00
2
24" Class IV RCP Storm Sewer (By Bore)
50 11
$285.00
$14,250.00
3
3' X 3' Concrete Junction Box
2 EA
$6,000.00
$12,000.00
4
Connect New 24" Storm Sewer to Existing Junction Box
1 EA
$1,200.00
$1,200.00
5
24" - 45' Bend for RCP Pipe
I CA
$1,000.00
$1,000.00
Total - Storm Sewer System Improvements
$74,650.00
TOTAL - WATER, SANITARY SEWER AND STORM SEWER $103,130.00
-Im
Page 2 of 2